- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML21265A3702021-09-22022 September 2021, 23 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1431 Revision 5 Project stage: Request ML21265A3712021-09-22022 September 2021 License Amendment Request for the Technical Specifications Conversion to NUREG-1431 Revision 5 Project stage: Request ML21265A3802021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.4, Reactor Coolant Systems (RCS) Project stage: Request ML21265A3772021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 6, Revision 0, Section 3.1, Reactivity Control Systems Project stage: Request ML21265A3792021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 8, Revision 0, Section 3.3, Instrumentation Project stage: Request ML21265A3842021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power Systems Project stage: Request ML21265A3822021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 11, Revision 0, Section 3.6, Containment Systems Project stage: Request ML21265A3812021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.5, Emergency Core Cooling Systems (ECCS) Project stage: Request ML21265A3852021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 14, Revision 0, Section 3.9, Refueling Operations Project stage: Request L-2021-158, Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal2021-09-22022 September 2021 Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal Project stage: Request ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 Project stage: Acceptance Review L-2022-010, License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 -Request for Supplemental Information Response2022-01-19019 January 2022 License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 -Request for Supplemental Information Response Project stage: Supplement NUREG-1431, Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 52022-02-0303 February 2022 Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 Project stage: Acceptance Review ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) Project stage: Meeting ML22054A1382022-02-16016 February 2022 February 24, 2022 ITS Public Meeting Material - Florida Power and Light Project stage: Meeting PMNS20220112, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-02-23023 February 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22054A1662022-02-23023 February 2022 ITS Public Meeting Material - NRC - Expectations for Licensees Responses to ITS Conversion LAR and RAIs Project stage: Meeting PMNS20220236, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-03-11011 March 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22070A5632022-03-21021 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22066A7852022-03-23023 March 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22089A1382022-04-0505 April 2022 Summary of March 24, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220321, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-04-0505 April 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220427, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-04-27027 April 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22118A3582022-05-10010 May 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22154A5112022-06-0707 June 2022 Summary of May 19, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22154A5202022-06-0909 June 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request Project stage: Meeting ML22195A1752022-07-27027 July 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests Project stage: Meeting PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests Project stage: Meeting ML22228A2032022-08-22022 August 2022 Summary of Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22228A2352022-08-23023 August 2022 Summary of July 28, 2022, Meeting with Florida Power and Light/Nextera on Turkey Point Improved Technical Specification Conversion License Amendment Request Project stage: Meeting ML22229A5252022-08-24024 August 2022 Summary of August 11, 2022, Mtg. with Florida Power & Light/Nextera on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Request (EPIDs L-2021-LLI-0000 & -0002) Project stage: Other ML22263A0122022-09-27027 September 2022 Summary of August 29, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests (EPID Nos. L-2021-LLI-0000 and L 2021 Lli 0002) Project stage: Meeting PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS Project stage: RAI ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests Project stage: Meeting PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests Project stage: Meeting PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests Project stage: Meeting ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests Project stage: Meeting ML23069A0282023-03-15015 March 2023 Summary of January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests Project stage: Meeting PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests Project stage: Meeting ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests Project stage: Meeting ML23107A2312023-04-18018 April 2023 Summary Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests Project stage: Meeting 2022-06-28
[Table View] |
Text
February 12, 2024 Mr. Bob Coffey Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:
TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -
CORRECTION OF AMENDMENT NOS. 297 AND 290 REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS (EPID L-2021-LLI-0002)
Dear Mr. Coffey:
On September 26, 2023, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 297 to Subsequent Renewed Facility Operating License No. DPR-31 and Amendment No. 290 to Subsequent Renewed Facility Operating License No. DPR-41 to Florida Power and Light Company (the licensee) for to the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point), respectively (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23234A192).
These amendments convert the current TS (CTS) to the improved TS (ITS) and relocates certain requirements to other licensee-controlled documents. The ITS are based on:
NUREG-1431, Standard Technical Specifications - Westinghouse Plants, Revision 5.0.
Final Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated July 22, 1993 (58 FR 39132); and
Title 10, Code of Federal Regulations, Part 50, Section 36, Technical specifications.
After issuance of the amendments, it was identified that there was an inadvertent error on ITS page 3.3.3.-1. The Required Action for A.1, should state Restore required channel to OPERABLE status, however the page was issued in the amendments as Restore one channel to OPERABLE status. In letter dated May 24, 2023 (enclosure 2) (ML23151A446), the licensee requested Required Action for A.1, stating Restore required channel to OPERABLE status.
The NRC staff reviewed ITS page 3.3.3-1, as requested, however during issuance, the error was introduced.
The NRC concludes that this correction does not change the NRC staffs previous conclusions in the SE, nor do they affect the no significant hazards consideration, as published in the Federal Register on June 14, 2022 (87 FR 36003). The enclosure contains corrected page 3.3.3-1.
If you have any questions regarding this matter, please contact me at (301) 415-3867 or by email at Michael.Mahoney@nrc.gov.
Sincerely,
/RA/
Michael Mahoney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
Corrected ITS page 3.3.3-1 cc: Listserv
PAM Instrumentation 3.3.3 Turkey Point Unit 3 and Unit 4 3.3.3-1 Amendment Nos. 297 and 290 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS
NOTE------------------------------------------------------------
Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions with one required channel inoperable.
A.1 Restore required channel to OPERABLE status.
30 days B. Required Action and associated Completion Time of Condition A not met.
B.1 Initiate action in accordance with Specification 5.6.4.
Immediately C. One or more Functions with two required channels inoperable.
C.1 Restore one channel to OPERABLE status.
7 days D. Required Action and associated Completion Time of Condition C not met.
D.1 Enter the Condition referenced in Table 3.3.3-1 for the channel.
Immediately
SUBJECT:
TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -
CORRECTION OF AMENDMENT NOS. 297 AND 290 REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS (EPID L-2021-LLI-0002) DATED FEBRUARY 12, 2024 DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMTurkeyPoint Resource RidsNrrLAABaxter Resource RidsRgn2MailCenter Resource RidsNrrDssStsb Resource TSweat, NRR ADAMS Accession No.: ML24036A073 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME MMahoney ABaxter DWrona DATE 02/05/2024 02/07/2024 02/09/2024 OFFICE NRR/DORL/LPL2-2/PM NAME MMahoney DATE 02/12/2024