ML24036A073

From kanterella
Jump to navigation Jump to search

– Correction of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications
ML24036A073
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/12/2024
From: Michael Mahoney
Plant Licensing Branch II
To: Coffey B
Florida Power & Light Co
Mahoney, M NRR/DORL 415-3867
References
EPID L-2021-LLI-0002
Download: ML24036A073 (1)


Text

February 12, 2024

Mr. Bob Coffey Executive Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -

CORRECTION OF AMENDMENT NOS. 297 AND 290 REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS (EPID L-2021-LLI-0002)

Dear Mr. Coffey:

On September 26, 2023, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 297 to Subsequent Renewed Facility Operating License No. DPR-31 and Amendment No. 290 to Subsequent Renewed Facility Operating License No. DPR-41 to Florida Power and Light Company (the licensee) for to the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point), respectively (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23234A192).

These amendments convert the current TS (CTS ) to the improved TS (ITS) and relocates certain requirements to other licensee-controlled documents. The ITS are based on:

NUREG-1431, Standard Technical Specifications - Westinghouse Plants, Revision 5.0.

Final Policy Statement on Technical Specificati on Improvements for Nuclear Power Reactors, dated July 22, 1993 (58 FR 39132); and Title 10, Code of Federal Regulations, Part 50, Section 36, Technical specificat ions.

After issuance of the amendments, it was identified that there was an inadvertent error on ITS page 3.3.3.-1. The Required Action for A.1, should state Restore required channel to OPERABLE status, however the page was issued in the amendments as Restore one channel to OPERABLE status. In letter dated May 24, 2023 (enclosure 2) (ML23151A446), the licensee requested Required Action for A.1, stating Restore required channel to OPERABLE status.

The NRC staff reviewed ITS page 3.3.3-1, as requested, however during issuance, the error was introduced.

The NRC concludes that this correction does not change the NRC staffs previous conclusions in the SE, nor do they affect the no significant hazards consideration, as published in the Federal Register on June 14, 2022 (87 FR 36003). The enclosure contains corrected page 3.3.3-1.

B. Coffey

If you have any questions regarding this matter, please contact me at (301) 415-3867 or by email at Michael.Mahoney@nrc.gov.

Sincerely,

/RA/

Michael Mahoney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-250 and 50-251

Enclosure:

Corrected ITS page 3.3.3-1

cc: Listserv

PAM Instrumentation 3.3.3

3.3INSTRUMENTATION

3.3.3 Post Accident Monitoring (PAM) Instrumentation

LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE ------------------------------------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One or more Functions A.1 Restore required channel 30 days with one required to OPERABLE status.

channel inoperable.

B. Required Action and B.1 Initiate action in accordance Immediately associated Completion with Specification 5.6.4.

Time of Condition A not met.

C. One or more Functions C.1 Restore one channel to 7 days with two required OPERABLE status.

channels inoperable.

D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Table 3.3.3-1 Time of Condition C not for the channel.

met.

Turkey Point Unit 3 and Unit 4 3.3.3-1 Amendment Nos. 297 and 290 B. Coffey

SUBJECT:

TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 -

CORRECTION OF AMENDMENT NOS. 297 AND 290 REGARDING CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS (EPID L-2021-LLI-0002) DATED FEBRUARY 12, 2024

DISTRIBUTION:

PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMTurkeyPoint Resource RidsNrrLAABaxter Resource RidsRgn2MailCenter Resource RidsNrrDssStsb Resource TSweat, NRR

ADAMS Accession No.: ML24036A073 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME MMahoney ABaxter DWrona DATE 02/05/2024 02/07/2024 02/09/2024 OFFICE NRR/DORL/LPL2-2/PM NAME MMahoney DATE 02/12/2024