ML071570118

From kanterella
Revision as of 06:36, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

E-MAIL: (NPA-PD) Cost Benefit Equation Terms
ML071570118
Person / Time
Site: Pilgrim
Issue date: 05/24/2007
From: Palla R
NRC/NRR/ADES
To: Jackie Jones
Sandia
References
TAC MD3698
Download: ML071570118 (3)


Text

iRort Palla - Cost Benefit Equation Terms ..... Page 1 From: Robert Palla To: jojones@sandia.gov Date: 05/24/2007 7:10:00 AM

Subject:

Cost Benefit Equation Terms Joe - I am not sure whether I had provided you with this table previously. Itshows how each of the terms in the cost benefit equation are derived, and their relative significance for Pilgrim. Bob CC: nbixler@sandia.gov

1.C':\t6ýip\GW)00001.ýýTýýý'MPý-' -P-aiWi11 1<

Page Ic:\te1~n p\GW}OOQOl .TMP Mail Envelope Properties (46557288.5A6 :18 :10412)

Subject:

Cost Benefit Equation Terms Creation Date 05/24/2007 7:10:00 AM From: Robert Palla Created By: RLP3 (@l)nrc.gov Recipients Action Date & Time sandia.gov Transferred 05/24/2007 7:10:30 AM jojones (ioiones(asandia.gov) nbixler CC (nbixler(asandia.gov)

Post Office Delivered Route sandia.gov Files Size Date & Time MESSAGE 505 05/24/2007 7:10:00 AM Cost benefit equation and description of terms.wpd 9603 02/21/2007 11:13:12 AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

.3 4

Net Value = (APE + AOC + AOE + AOSC) - COE, where APE = averted public exposure costs AOC = averted offsite property damage costs AOE = averted occupational exposure costs AOSC = averted onsite costs averted cleanup and decontamination costs (ACC) + averted replacement power costs (ARPC)

COE- cost of enhancement Cost Significance NUREG/BR- Related Parameters Value If All Internally-Initiated Core Factor 0184 Section Damage Events at Pilgrim Are Eliminated APE Offsite exposure 5.7.1 AP-Rem (from MACCS2) $314K AOC Offsite economic 5.7.5 AOffsite Economic Cost Risk - OECR (from MACCS2) $566K From 12/12/2006 Entergy letter, Attachment C, Table E. 1-15:

- CAPB-12: $4.85E6/event

- CAPB-14: $4.96E9/event

- CAPB-15: $18.0E9/event

- frequency-weighted sum for all CAPBs = $8.21 E9/event From NUREG/BR-0184, Table 5.6 (1990$ costs, within 50 miles):

- average for all NUREG-1 150 plants = $2.46E8/event -

- highest NUREG-1 150 plant (Peach Bottom) = $2.71 E9/event AOE Onsite exposure 5.7.3 Immediate occupational dose (3,300 P-Rem) $2K Long term occupational dose (20,000 P-Rem)

ACC Onsite economic 5.7.6.1 Onsite cleanup and decontamination cost ($1.1E9.single event, PW) $76K ARPC Onsite economic 5.7.6.2 Plant power level. $51 K