ML100560388

From kanterella
Revision as of 21:31, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Request for Additional Information Regarding Request to Adopt the Alternate Source Term
ML100560388
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/25/2010
From: Jason Paige
Plant Licensing Branch II
To: Nazar M
Florida Power & Light Co
Paige, Jason C, NRR/DORL,301-415-5888
References
TAC ME1624, TAC ME1625
Download: ML100560388 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Fehruary 2'5, 2010 Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 SUB..IECT: TURKEY POINT UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST TO ADOPT THE ALTERNATE SOURCE TERM (TAC NOS. ME1624 AND ME1625)

Dear Mr. Nazar:

By letter dated June 25, 2009 (Agencywide Documents Access and Management System Accession No. ML092050277), Florida Power and Light Company (FPL) requested an amendment to Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point, Units 3 and 4. The proposed changes would revise the Turkey Point licensing bases to adopt the alternative source term, as described in Title 10 of the Code of Federal Regulations, Section 50.67, following the guidance provided in Regulatory Guide 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors,"

July 2000.

The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review. This was discussed with members of the FPL staff and, on February 23,2010, Mr. Bob Tomonto indicated that a response would be provided within 30 days of the date of this letter.

If you have any questions, please contact me at (301) 415-5888.

Ja on C. Paige, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 DOCKET NOS. 50-250 AND 50-251 By letter dated June 25, 2009 (Agencywide Documents Access and Management System Accession No. ML092050277), Florida Power and Light Company (the licensee) requested an amendment to Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point, Units 3 and 4. The proposed changes would revise the Turkey Point licensing bases to adopt the alternative source term (AST), as described in Title 10 of the Code of Federal Regulations (10 CFR), Section 50.67, following the guidance provided in Regulatory Guide 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," July 2000. To complete its review of the license amendment request (LAR), the Nuclear Regulatory Commission staff requests the following additional information.

1. Describe how loads being added to the Turkey Point emergency diesel generators (EDGs) (if applicable), whether automatically (sequencer) or manually (per operating procedure), affect the capability and capacity of the EDGs (e.g., describe the impact of the proposed change on the EDG ratings) to support this LAR. Describe any changes to the EDG surveillance testing and/or how the surveillance testing demonstrates the EDG capability to supply the necessary accident loading. In addition (if load has been added),

describe EDG design load margin and how that design margin is managed.

2. Provide a list and description of components being added to your 10 CFR 50.49 program due to this LAR (if applicable). Confirm that these components are qualified for the environmental conditions they are expected to be exposed to.
3. The licensee proposed utilizing sodium tetraborate decahydrate stored in stainless steel baskets inside containment to control pH at 7.0 or higher, crediting Containment Spray for post-LOCA iodine removal and not crediting the Containment Filtration System in the AST dose consequences analyses. Describe the impact of the above proposed actions on environmental conditions and any impact on equipment qualification.

ENCLOSURE

Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 SUB..IECT: TURKEY POINT UNITS 3 AND 4 - REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST TO ADOPT THE ALTERNATE SOURCE TERM (TAC NOS. ME1624 AND ME1625)

Dear Mr. Nazar:

By letter dated June 25,2009 (Agencywide Documents Access and Management System Accession No. ML092050277), Florida Power and Light Company (FPL) requested an amendment to Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point, Units 3 and 4. The proposed changes would revise the Turkey Point licensing bases to adopt the alternative source term, as described in Title 10 of the Code of Federal Regulations, Section 50.67, following the guidance provided in Regulatory Guide 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors,"

July 2000.

The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review. This was discussed with members of the FPL staff and, on February 23, 2010, Mr. Bob Tomonto indicated that a response would be provided within 30 days of the date of this letter.

If you have any questions, please contact me at (301) 415-5888.

Sincerely, IRA!

Jason C. Paige, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOgcRp RidsNrrDorlDpr LPL2-2 RlF RidsAcrsAcnw_MailCTR Resource RidsN rrDeEeeb RidsNrrPMTurkey Point RidsRgn2MailCenter KMiller, NRR RidsNrrLABClayton (Hard Copy) RidsNrrDorlLpl2-2 ADAMS Accession Number' ML100560388 *via memo OFFICE LPL2-2/PM LPL2-2/LA EEEB/BC LPL2-2/BC(A)

NAME JPaiQe BClayton GWilson* BMozafari DATE 02/25/10 02/25/10 02/04/10 02/25/10 OFFICIAL RECORD COpy