Letter Sequence RAI | |
---|---|
TAC:ME4907, Administratively Control Containment Penetrations, TSTF-68, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:ME4908, Administratively Control Containment Penetrations, TSTF-68, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) | |
Initiation
Questions Answers
Results Other: L-2011-540, Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 242, L-2012-118, Response to NRC ITSB RAI Regarding Clean TS Changes for EPU LAR No. 205 and Incorporation of Amendments 247 and 243 TS Changes on Relocation of Cycle Specific Parameters to the Core Operating Limits Report, L-2012-263, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report, L-2012-293, FPL Review Comments on Extended Power Uprate Safety Evaluation Report, L-2012-426, Extended Power Uprate Cycle 26 Startup Report, ML110960521, ML110960523, ML112280292, ML12074A248, ML12074A251, ML12122A162, NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. | |
MONTHYEARL-2009-133, License Amendment Request 196 Alternative Source Term and Conforming Amendment2009-06-25025 June 2009
[Table View]License Amendment Request 196 Alternative Source Term and Conforming Amendment Project stage: Request ML0920205292009-07-22022 July 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) (Tac Nos. ME1624 and ME1625) Project stage: Acceptance Review ML0922206962009-08-18018 August 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) Project stage: Acceptance Review L-2009-195, Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term2009-08-26026 August 2009 Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term Project stage: Response to RAI ML0926005302009-09-25025 September 2009 Acceptance Letter Regarding the Alternative Source Term License Amendment Request Project stage: Acceptance Review ML0935006652009-12-17017 December 2009 RAI, Regarding Alternative Source Term Project stage: RAI L-2010-021, Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request2010-02-10010 February 2010 Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request Project stage: Response to RAI ML1005603882010-02-25025 February 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Term Project stage: RAI L-2010-048, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-03-15015 March 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI ML1007004462010-03-24024 March 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Team (TAC ME1624 & ME1625) Project stage: RAI L-2010-065, Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 1962010-04-14014 April 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI L-2010-083, Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST)2010-05-21021 May 2010 Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) Project stage: Supplement L-2010-121, Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 1962010-06-11011 June 2010 Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request L-2010-131, Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-06-23023 June 2010 Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Request L-2010-137, Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 1962010-06-25025 June 2010 Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request ML1024400682010-08-27027 August 2010 Acceptance Review: Fuel Storage Criticality Analysis LAR (ME4470 and ME4471) Project stage: Acceptance Review L-2010-136, Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 1962010-09-0202 September 2010 Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request ML1024602052010-09-0303 September 2010 E-mail Acceptance Review TSTF-448 Project stage: Acceptance Review L-2010-197, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System2010-09-15015 September 2010 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System Project stage: Response to RAI L-2010-226, Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 1962010-10-13013 October 2010 Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Meeting ML1035601692010-10-21021 October 2010 License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request L-2010-160, Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS)2010-10-29029 October 2010 Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS) Project stage: Supplement L-2010-293, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity2010-12-14014 December 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity Project stage: Response to RAI ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report Project stage: Supplement ML1035601742010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes Project stage: Request ML1028710232010-12-16016 December 2010 Summary of Meeting with Florida Power & Light Company to Discuss Turkey Point, Units 3 and 4, Alternative Source Term License Amendment Request Project stage: Meeting L-2010-303, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA)2010-12-21021 December 2010 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) Project stage: Supplement ML1036400512010-12-26026 December 2010 Logbook Entry for 12/26/2010 Project stage: Request ML1036400522010-12-27027 December 2010 Logbook Entry for 12/27/2010 Project stage: Request L-2011-004, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues2011-01-0707 January 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues Project stage: Response to RAI ML1103101842011-01-12012 January 2011 Crocodile Log Book 1/12/2011 Project stage: Request ML1035500302011-01-19019 January 2011 Summary of Meeting with Florida Power & Light Company, Regarding Turkey Point, Units 3 & 4, Spent Fuel Criticality Analysis License Amendment Request Project stage: Meeting L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues2011-02-22022 February 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues Project stage: Response to RAI L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 12011-03-0303 March 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 Project stage: Response to RAI ML1107000212011-03-11011 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues2011-03-25025 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues Project stage: Response to RAI L-2011-081, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-03-31031 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality Project stage: Request ML11095A0122011-04-21021 April 2011 Summary of Public Meeting with Florida Power & Light Company, on Turkey Points, Units 2 and 4 Extended Power Uprate License Amendment Request Currently Under Review (TAC Nos. ME4907 and ME4908) Project stage: Meeting L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI L-2011-084, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-04-28028 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Response to RAI L-2011-142, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues2011-04-29029 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues Project stage: Response to RAI NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.2011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605232011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605212011-05-0606 May 2011 Letter, Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other L-2011-141, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-05-11011 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-170, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues2011-05-19019 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues Project stage: Response to RAI L-2011-154, Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 2072011-05-20020 May 2011 Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 207 Project stage: Response to RAI L-2011-210, Regarding Supplementary Information Related to Fpl'S Response to NRC Request for Additional Information (RAI) IHPB-1.52011-06-0707 June 2011 Regarding Supplementary Information Related to Fpl'S Response to NRC Request for Additional Information (RAI) IHPB-1.5 Project stage: Supplement ML11174A1652011-06-21021 June 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI 2010-06-25 |
ML11178A067 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 06/23/2011 |
From: | Jason Paige Plant Licensing Branch II |
To: | |
Shared Package | |
ML11195A170 | List: |
References | |
TAC ME4907, TAC ME4908 | |
Download: ML11178A067 (2) | |
Similar Documents at Turkey Point | |
---|---|
Category:- No Document Type Applies
MONTHYEARML24115A2642024-04-24024 April 2024
[Table view]FAQ 23-03 Turkey Point Proposed Response Revision 1 ML23333A0122023-11-27027 November 2023 Attachment D - Bill Nuttle 2023 Expert Declaration ML23263A9872023-09-0707 September 2023 FOIA-2023-000207 - Resp 1- Final, Agency Records Subject to the Request Are Enclosed ML23263A9892023-09-0707 September 2023 FOIA-2023-000207 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed ML23031A1992023-02-0101 February 2023 Nd 4 Environmental Remote Audit Requests for Confirmation of Information ML22073A1242022-03-25025 March 2022 SLR License ML22073A1232022-03-25025 March 2022 SLR License ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21035A2042021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2019 Annual Monitoring Report ML21035A2112021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2017 Annual Monitoring Report ML21035A2132021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 Part 2 ML21035A2122021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 ML21035A2142021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2015 Post Power Uprate Report ML21035A2162021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2012 Preuprate Report - Evaporation ML21035A1932021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2019_a_2018 Annual Remediation Report_R327649-004 (Dup) ML21035A2152021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2014 Turkey Point Post-Uprate Monitoring Report ML21035A2082021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix G ML21035A2182021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2016 Annual Monitoring Report ML21035A2102021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Combined CCS Modeling Reports 2012-2017 Part 1 ML21035A2062021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix J ML21035A2072021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix a ML21035A2052021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix C ML21035A2022021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix B ML21035A2012021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix E ML21035A1992021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-01-27 FPL Attachment 1 Gw Flow and Transport Model ML21035A1982021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2018-08-08 Spreadsheet Response to WRI-12 ML21035A1972021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Fw_ List of Documents for PNNL ML21035A2032021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Appendix N ML21035A1952021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2018 Appg EDMS CSEM Summary ML21035A1962021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, FPL 2017_b_2017-11 Annual Remediation Restoration Report ML21035A1922021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-09 FPL Annual Monitoring Report-03 ML21035A1912021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, Re_ Turkey Point_ _More Favorable Climatic Conditions_ ML21035A1902021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-01-27 FPL Phase One Remediation Plan ML21035A1892021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2016-01-29 Freshening Effectiveness Report ML21035A2172021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, CCS Modeling FPL 2012 Preuprate Report ML21035A1942021-01-21021 January 2021 NRC-2020-000123 - Resp 5 - Final, 2017-09 FPL Annual Monitoring Report ML21013A1592021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 3 of 4 ML21013A1612021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 2 of 4 ML21013A1622021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 4 of 4 ML21013A1632021-01-12012 January 2021 NRC-2020-000123 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed, Part 1 of 4 ML20315A0862020-10-30030 October 2020 NRC-2020-000123 - Resp 3 - Interim, Agency Records Subject to the Request Are Enclosed ML20272A1432020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 6 of 9 ML20272A1442020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 7 of 9 ML20272A1452020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 8 of 9 ML20272A1462020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 9 of 9 ML20272A1412020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed.Part 4 of 9 ML20272A1382020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 1 of 9 ML20272A1402020-09-24024 September 2020 NRC-2020-000123 - Resp 2 - Interim, Agency Records Subject to the Request Are Enclosed. Part 3 of 9 2024-04-24 |
Text
OUTLINE EPITOME/CONTAINMENT VOLUME RAI RESPONSE
- Cover Letter
- Attachment
- 1. RAI Introduction
- 2. Summary of EPITOME Issue
- 3. Other Input Considerations (Containment Volume, other changes, etc.)
- 4. Analyses
- 5. Summary of LOCA Results
- a. Containment Integrity
- b. PressurelTemperature Curves
- 6. Summary of MSLB Results
- a. Containment Integrity
- b. PressurelTemperature Curves
- 7. Areas Requiring Revised Analyses (applicable LAR sections in parentheses)
- a. Reactor Auxiliary Cooling Water Systems (Component Cooling Water System) (2.5.4.3)
- b. Primary Containment Functional Design (2.6.1)
- c. Mass and Energy Release (2.6.3)
- d. Containment Heat Removal (2.6.5)
- 8. Other Areas Reviewed with no Impact (applicable LAR sections in parentheses)
- a. Protective Coating Systems (Paints) - Organic Materials (2.1.7)
- b. Balance of Plant Piping, Components and Supports (2.2.2.2)
- c. Safety-Related Valves and Pumps (2.2.4)
- d. Environmental Qualification of Electrical Equipment (2.3.1)
- e. Pressure Analysis for Emergency Core Cooling System Performance Capability (2.6.6)
- f. Containment Ventilation System (2.7.7)
- g. Emergency Core Cooling System and Loss-of-Coolant Accidents (2.8.4.4)
- h. Radiological Consequences Analyses Using Alternative Source Terms (2.9.2)
- 9. Conclusions
- 10. Proposed Technical Specification Change
- a. Description of Change and Justification
- b. No Significant Hazards Determination Fig. 1 - Marked-up Technical Specification Pages Fig. 2 - Marked-up Technical Specification Bases Pages (for information only)