Letter Sequence Request |
---|
TAC:ME1624, Administratively Control Containment Penetrations, TSTF-68, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2011-540, Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 242, L-2012-118, Response to NRC ITSB RAI Regarding Clean TS Changes for EPU LAR No. 205 and Incorporation of Amendments 247 and 243 TS Changes on Relocation of Cycle Specific Parameters to the Core Operating Limits Report, L-2012-263, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report, L-2012-293, FPL Review Comments on Extended Power Uprate Safety Evaluation Report, L-2012-426, Extended Power Uprate Cycle 26 Startup Report, ML110960521, ML110960523, ML112280292, ML12074A248, ML12074A251, ML12122A162, NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.
|
MONTHYEARL-2009-133, License Amendment Request 196 Alternative Source Term and Conforming Amendment2009-06-25025 June 2009 License Amendment Request 196 Alternative Source Term and Conforming Amendment Project stage: Request ML0920205292009-07-22022 July 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) (Tac Nos. ME1624 and ME1625) Project stage: Acceptance Review ML0922206962009-08-18018 August 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) Project stage: Acceptance Review L-2009-195, Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term2009-08-26026 August 2009 Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term Project stage: Response to RAI ML0926005302009-09-25025 September 2009 Acceptance Letter Regarding the Alternative Source Term License Amendment Request Project stage: Acceptance Review ML0935006652009-12-17017 December 2009 RAI, Regarding Alternative Source Term Project stage: RAI L-2010-021, Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request2010-02-10010 February 2010 Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request Project stage: Response to RAI ML1005603882010-02-25025 February 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Term Project stage: RAI L-2010-048, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-03-15015 March 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI ML1007004462010-03-24024 March 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Team (TAC ME1624 & ME1625) Project stage: RAI L-2010-065, Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 1962010-04-14014 April 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI L-2010-083, Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST)2010-05-21021 May 2010 Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) Project stage: Supplement L-2010-121, Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 1962010-06-11011 June 2010 Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request L-2010-131, Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-06-23023 June 2010 Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Request L-2010-137, Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 1962010-06-25025 June 2010 Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request ML1024400682010-08-27027 August 2010 Acceptance Review: Fuel Storage Criticality Analysis LAR (ME4470 and ME4471) Project stage: Acceptance Review L-2010-136, Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 1962010-09-0202 September 2010 Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request ML1024602052010-09-0303 September 2010 E-mail Acceptance Review TSTF-448 Project stage: Acceptance Review L-2010-197, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System2010-09-15015 September 2010 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System Project stage: Response to RAI L-2010-226, Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 1962010-10-13013 October 2010 Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Meeting ML1035601692010-10-21021 October 2010 License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request L-2010-160, Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS)2010-10-29029 October 2010 Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS) Project stage: Supplement L-2010-293, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity2010-12-14014 December 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity Project stage: Response to RAI ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report Project stage: Supplement ML1035601742010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes Project stage: Request ML1028710232010-12-16016 December 2010 Summary of Meeting with Florida Power & Light Company to Discuss Turkey Point, Units 3 and 4, Alternative Source Term License Amendment Request Project stage: Meeting L-2010-303, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA)2010-12-21021 December 2010 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) Project stage: Supplement ML1036400512010-12-26026 December 2010 Logbook Entry for 12/26/2010 Project stage: Request ML1036400522010-12-27027 December 2010 Logbook Entry for 12/27/2010 Project stage: Request L-2011-004, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues2011-01-0707 January 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues Project stage: Response to RAI ML1103101842011-01-12012 January 2011 Crocodile Log Book 1/12/2011 Project stage: Request ML1035500302011-01-19019 January 2011 Summary of Meeting with Florida Power & Light Company, Regarding Turkey Point, Units 3 & 4, Spent Fuel Criticality Analysis License Amendment Request Project stage: Meeting L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues2011-02-22022 February 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues Project stage: Response to RAI L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 12011-03-0303 March 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 Project stage: Response to RAI ML1107000212011-03-11011 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues2011-03-25025 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues Project stage: Response to RAI L-2011-081, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-03-31031 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality Project stage: Request ML11095A0122011-04-21021 April 2011 Summary of Public Meeting with Florida Power & Light Company, on Turkey Points, Units 2 and 4 Extended Power Uprate License Amendment Request Currently Under Review (TAC Nos. ME4907 and ME4908) Project stage: Meeting L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI L-2011-084, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-04-28028 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Response to RAI L-2011-142, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues2011-04-29029 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues Project stage: Response to RAI NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.2011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605232011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605212011-05-0606 May 2011 Letter, Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other L-2011-141, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-05-11011 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-170, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues2011-05-19019 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues Project stage: Response to RAI L-2011-154, Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 2072011-05-20020 May 2011 Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 207 Project stage: Response to RAI L-2011-210, Regarding Supplementary Information Related to Fpl'S Response to NRC Request for Additional Information (RAI) IHPB-1.52011-06-0707 June 2011 Regarding Supplementary Information Related to Fpl'S Response to NRC Request for Additional Information (RAI) IHPB-1.5 Project stage: Supplement ML11174A1652011-06-21021 June 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI 2010-06-25
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML23258A0262023-09-15015 September 2023 September 2023 Dseis Public Meeting - In-person Meeting Slides ML23258A0272023-09-15015 September 2023 September 2023 Dseis Public Meeting - Virtual Meeting Slides ML23177A0812023-06-28028 June 2023 Nd Pre-Submittal Meeting Regarding License Amendment Requests for Transition to 24-Month Fuel Cycles ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML22336A0262022-12-0707 December 2022 December 7 2022 24-Month Fuel Cycle Public Meeting Licensee Slides ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) ML22110A2172022-05-0303 May 2022 Annual Assessment Meeting ML22111A1782022-04-26026 April 2022 April 26, 2022 Public Meeting on Reactor Coolant Pump Seal Replacement - Florida Power and Light Slides ML22098A0932022-04-13013 April 2022 Nextera/Fpl Redacted Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (Public Version) ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request ML22063A1262022-03-0404 March 2022 Nextera/Fpl Presentation for March 7, 2022 Public Meeting Between NRC and Florida Power & Light Company to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 ML22054A1662022-02-23023 February 2022 ITS Public Meeting Material - NRC - Expectations for Licensee'S Responses to ITS Conversion LAR and RAIs ML22046A0462022-02-15015 February 2022 Icw Relief Request 10 Public Meeting Licensee Presentation ML22032A0022022-02-0202 February 2022 2/2/22 Slides Considerations for the Potential Use of a Multi-Stage Validation Approach to Support to Nuclear Power Plant Control Room Modifications Discussion of Concepts and NRC Licensing Considerations ML21285A0412021-10-13013 October 2021 Summary of September 29, 2021 Meeting with the U.S. Fish and Wildlife Service Regarding Crocodile Monitoring at Turkey Point ML21237A0092021-08-25025 August 2021 August 25, 2021 - Nextera/Fpl Presentation Slides for Public Meeting Concerning Proposed Alternative Repair to Unit 3 CCW Discharge Line ML21235A0932021-08-23023 August 2021 Licensee'S Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting ML21232A0172021-08-20020 August 2021 Licensee'S Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting ML21225A0012021-08-18018 August 2021 Preapplication Meeting Presentation Improved Technical Specifications Conversion ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session ML21109A0052021-04-19019 April 2021 2020 - Stl - Tpn Combined EOC Presentation ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open ML21076A6152021-03-22022 March 2021 NRC Pre-Submittal Meeting, St. Lucie and Turkey Point Nuclear Plants - Improved Technical Specification Conversion - March 22, 2021 (EPID L-2021-LRM-0032) (Presentation) ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation ML20266G2202020-09-15015 September 2020 Slide Presentation for September 15, 2020 Public Meeting Concerning CCW Headers ML20135F6652020-05-14014 May 2020 Stl - Tpn Combined EOC Presentation ML19116A2582019-05-0101 May 2019 Tp Dseis Meeting 05-01-19 Spanish Slides L-2018-136, L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations2018-08-0808 August 2018 L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17310B2322017-11-0707 November 2017 Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017 ML14174A4022014-06-24024 June 2014 6/24/2014, Pre-Submittal Meeting Slide for St. Lucie and Turkey Point Re. License Amendment Request Adoption of TSTF-505 Risk-Informed Completion Time ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 ML13164A3122013-06-13013 June 2013 Summary of Category 3 Public Meeting - Annual Assessment - Turkey Point Nuclear Plant Units 3 and 4 ML1205805322012-02-27027 February 2012 Public Meeting Summary - Turkey Point - Meeting Slides ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting ML1114507462011-05-25025 May 2011 Annual Assessment Meeting - Presentation Slides ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request 2023-09-15
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML23258A0272023-09-15015 September 2023 September 2023 Dseis Public Meeting - Virtual Meeting Slides ML23258A0262023-09-15015 September 2023 September 2023 Dseis Public Meeting - In-person Meeting Slides ML23177A0812023-06-28028 June 2023 Nd Pre-Submittal Meeting Regarding License Amendment Requests for Transition to 24-Month Fuel Cycles ML23124A3412023-05-0404 May 2023 FPL 2022 Public Meeting Slides ML22336A0262022-12-0707 December 2022 December 7 2022 24-Month Fuel Cycle Public Meeting Licensee Slides ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22144A3902022-05-24024 May 2022 RCP Seal Solutions - May 24 2022 Slide Material (Public) ML22111A1782022-04-26026 April 2022 April 26, 2022 Public Meeting on Reactor Coolant Pump Seal Replacement - Florida Power and Light Slides ML22101A2262022-04-11011 April 2022 NRC Staff Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request ML22063A1262022-03-0404 March 2022 Nextera/Fpl Presentation for March 7, 2022 Public Meeting Between NRC and Florida Power & Light Company to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 ML21320A2612021-11-17017 November 2021 Supporting Information for Turkey Point and St. Lucie Improved Technical Specifications November 17, 2021, Public Meeting - List of Topics ML21237A0092021-08-25025 August 2021 August 25, 2021 - Nextera/Fpl Presentation Slides for Public Meeting Concerning Proposed Alternative Repair to Unit 3 CCW Discharge Line ML21235A0932021-08-23023 August 2021 Licensee'S Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting ML21232A0172021-08-20020 August 2021 Licensee'S Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting ML21225A0012021-08-18018 August 2021 Preapplication Meeting Presentation Improved Technical Specifications Conversion ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides ML21109A0052021-04-19019 April 2021 2020 - Stl - Tpn Combined EOC Presentation ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open ML21095A0162021-04-0505 April 2021 2021 RIC Session T12 - DOE-Sponsored Light Water Reactor Sustainability Program ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation ML20266G2202020-09-15015 September 2020 Slide Presentation for September 15, 2020 Public Meeting Concerning CCW Headers ML20135F6652020-05-14014 May 2020 Stl - Tpn Combined EOC Presentation ML19116A2582019-05-0101 May 2019 Tp Dseis Meeting 05-01-19 Spanish Slides ML19116A2692019-05-0101 May 2019 Preliminary Results of the Environmental Review for Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal ML19056A1462019-02-25025 February 2019 SLRA RAIs 10, 12, 13 - Set 8 Rev. 0 Irradiated Concrete-Steel Responses ML18141A3072018-05-21021 May 2018 18 - SLR Status ML14174A4022014-06-24024 June 2014 6/24/2014, Pre-Submittal Meeting Slide for St. Lucie and Turkey Point Re. License Amendment Request Adoption of TSTF-505 Risk-Informed Completion Time ML13164A3122013-06-13013 June 2013 Summary of Category 3 Public Meeting - Annual Assessment - Turkey Point Nuclear Plant Units 3 and 4 ML12352A2042012-12-27027 December 2012 Dec 27 2012 Handout - Tropical Audubon Society ML12256A7462012-09-12012 September 2012 PRB Meeting with Saporito Petition Slides ML1205805322012-02-27027 February 2012 Public Meeting Summary - Turkey Point - Meeting Slides ML11178A0682011-06-23023 June 2011 Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting ML1114507462011-05-25025 May 2011 Annual Assessment Meeting - Presentation Slides ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request ML1108206992011-03-22022 March 2011 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request ML1102604062011-01-11011 January 2011 FPL Meeting Summary Presentation Handouts ML1030802102010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 ML1030802322010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0038, Revision 2 ML1023502322010-08-18018 August 2010 Extended Power Uprate (EPU) NRC Public Meeting ML1023104112010-07-22022 July 2010 Meeting with NRC Extended Power Uprate (EPU) ML1016704902010-06-0808 June 2010 Fire Protection OMA Screening Criteria (Turkey Point) 2023-09-15
[Table view] |
Text
Turkey Point Extended Power Uprate (EPU)
Spent Fuel Criticality (SFC)
NRC Meeting March 31, 2011
Agenda
- Spent Fuel Criticality (SFC)
- Appreciate the Staffs support and participation today
- FPL seeks clarification and understanding of Staff questions
- Workshop style / open format for the meeting suggested
- Goal to facilitate and improve the review and response process
- Seek to improve understanding of open items
- Encourage open and active dialogue to address open items from the Staffs review 3
Extended Power Uprate
- Review status of RAIs
- Discuss follow up clarifications
- Discuss remaining areas under review Spent Fuel Criticality
- Discuss staff feedback on review 4
Received 140 final and draft RAIs as of March 29, 2011 Issued responses to 40 RAIs Draft RAI status
- Containment and Ventilation (13)
- Nuclear Performance and Code Review (7)
- Quality and Vendor (1)
- Health Physics (3)
- Environmental (1)
- Reactor Systems (14)
- Mechanical and Civil (39)
Remaining responses should be issued in April 2011
- Unit 4 Mechanical and Civil Engineering (Piping and Supports) commitment is April 30, 2011 5
Awaiting RAIs from remaining branch
- Accident Dose Follow up questions
- Responded to 2 follow up questions (I & C Branch)
- One follow up question received (Vessels & Internals Integrity)
- Remaining response will be issued in April 2011 6
Branch Status Summary
- Responded to 5 RAIs
- EPU modifications do not impact Fire Protection Program
- Responding to 2 RAIs, no issues
- Responded to 6 RAIs
- Selected NDE inspection results
- Component Performance and Testing
- No RAIs anticipated
- Status of draft RAIs 7
Branch Status Summary
- Responded to 3 RAIs
- Vessels and Internals Integrity
- Responded to 6 RAIs
- One follow up RAI issued
- Responding to 14 RAIs, no issues
- Updated grid System Impact Study 8
Branch Status Summary
- Instrumentation and Controls
- Responded to 5 initial RAIs
- Responded to 2 follow up RAIs
- LEFM out of service power level restrictions
- Mechanical and Civil Engineering
- Responded to 4 initial questions (piping and supports)
Unit 3 follow up response issued March 25, 2011 Unit 4 follow up response to be issued by April 30, 2011
- Review of remaining draft RAIs (39)
- Health Physics and Human Performance
- Responded to 8 Human Performance RAIs
- Timing of critical operator actions
- Review of remaining Health Physics draft RAIs (3) 9
Branch Status Summary
- Containment and Ventilation
- 13 draft RAIs issued
- Resolution of EPITOME code error Code error involves LOCA mass and energy release calculation Turkey Point containment analysis is impacted Plant operability has been addressed Identifying analytical and operational margins Affected EPU documents have been identified Schedule for resolution under development 10
Branch Status Summary
- Containment and Ventilation
- Debris generation and NPSH considerations EPU has no effect on insulation debris generation EPU has no effect on sump flow Classic NPSH requirements are met without credit for containment overpressure Containment overpressure provides margin to address potential flashing and de-aeration effects
- Nuclear Performance and Code Review
- Seven draft RAIs issued
- Boric Acid Precipitation Analysis 11
Boric Acid Precipitation Timeline 12
Branch Status Summary
- Responding to 6 RAIs, no issues
- Ultimate heat sink design and CCW HX performance testing
- LOFTRAN plant transient modeling
- Responded to 7 RAIs
- Steam Generator Tube Rupture (SGTR) Margin to Overfill (MTO)
MTO greater than 300 ft3 in affected steam generator
- Review of remaining draft RAIs (14)
- Quality and Vendor Branch
- Review of draft RAI (1)
- Review of draft RAI (1) 13
Revised analysis addressing items in Draft Interim Staff Guidance submitted on February 22, 2011 Staff review in progress Open discussion of Staff feedback and questions 14
Staff issue remaining EPU RAIs and clarification requests FPL to respond to EPU RAIs and clarification requests Staff issue spent fuel criticality RAIs FPL respond to spent fuel criticality RAIs Schedule and prepare for ACRS sub-committee EPU and SFC implementation planned for 1st quarter 2012 for Unit 3 and 4th quarter 2012 for Unit 4 15