Letter Summary of May 4, 2010 Non-Public Meeting to Discuss End-of-Cycle Security Performance for Calendar Year 2009
ML101370286
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/17/2010
From: Eric Duncan
Plant Support Branch II
To: Costanzo C
NextEra Energy Duane Arnold
References
Download: ML101370286 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 17, 2010 Mr. Christopher R. Costanzo Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

SUMMARY

OF THE DUANE ARNOLD ENERGY CENTER MAY 4, 2010, NON-PUBLIC MEETING TO DISCUSS END-OF-CYCLE SECURITY PERFORMANCE FOR CALENDAR YEAR 2009

Dear Mr. Costanzo:

On May 4, 2010, the Nuclear Regulatory Commission (NRC) held a non-public meeting at the Duane Arnold Energy Center, located at 3277 DAEC Road, Palo, IA. The purpose of the meeting was to discuss the NRC End-of-Cycle assessment of Duane Arnold Energy Center Security Performance for the 2009 calendar year.

Mr. Eric Duncan, Chief, Plant Support Branch, Division of Reactor Safety, Region III, opened the meeting with an introduction of NRC officials, the reason for the meeting, and a review of the NRCs Reactor Oversight Process. Mr. Duncan then discussed the Duane Arnold Energy Center Security Performance for the 2009 calendar year and provided the licensee with an opportunity to provide any response and remarks.

Mr. Duncan then adjourned the meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and the attendance listing will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access

C. Costanzo and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49

Enclosure:

Meeting Attendees cc w/encl: Distribution via ListServ

C. Costanzo and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49

Enclosure:

Meeting Attendees cc w/encl: Distribution via ListServ DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: DUA 051710 DRS MEETING

SUMMARY

.DOC 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME DFunk:co EDuncan DATE 05/17/10 05/17/10 OFFICIAL RECORD COPY

MEETING PRINCIPAL ATTENDEES NextEra Energy C. Constanzo Site Vice President D. Curtland Plant Manager S. Catron Licensing Manager B. Kindred Security Manager Nuclear Regulatory Commission A. Boland Director, Division of Reactor Safety, Region III E. Duncan Chief, Plant Support Branch, Region III R. Orlikowski Senior Resident Inspector, Duane Arnold R. Baker Resident Inspector, Duane Arnold R. Murray Resident Inspector, Duane Arnold Enclosure