Summary of Meeting with Licensee to Discuss Turbulent Penetration as Related to Duane Arnold Energy Center'S High Pressure Coolant Injection (HPCI) System
ML060390500
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/17/2006
From: Spaulding D
NRC/NRR/DLPM/LPD3
To:
spaulding D, NRR/DORL, 415-2928
Shared Package
ML060390518 List:
References
TAC MC8595
Download: ML060390500 (3)


Text

February 17, 2006 LICENSEE: FPL Energy Duane Arnold FACILITY: Duane Arnold Energy Center

SUBJECT:

SUMMARY

OF DECEMBER 13, 2005, MEETING TO DISCUSS TURBULENT PENETRATION AS RELATED TO DUANE ARNOLD ENERGY CENTERS HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM (TAC NO. MC8595)

On December 13, 2005, members of the U. S. Nuclear Regulatory Commission (NRC) staff met with Duane Arnold Energy Center (DAEC) representatives at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, MD. The meeting was a Category 1 public meeting.

The purpose of the meeting was to allow DAEC representatives to present the cork screw convection methodology which is formally known as Turbulent Penetration, and to discuss its relationship to the high pressure coolant injection system (HPCI). Additionally, DAEC representatives discussed the potential causes of steam void formation in the HPCI system, and actions taken. The NRC staff asked questions and provided feedback. DAEC plans to further evaluate the issue of the void formation.

No regulatory decisions were made at the meeting.

The meeting agenda was provided with the meeting notice (ML053210135). The licensees presentation slides are enclosed. A list of attendees is enclosed.

/RA/

Deirdre W. Spaulding, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosures:

1. Attendance List
2. Slides cc w/encls: See next page

February 17, 2006 LICENSEE: FPL Energy Duane Arnold FACILITY: Duane Arnold Energy Center

SUBJECT:

SUMMARY

OF DECEMBER 13, 2005, MEETING TO DISCUSS TURBULENT PENETRATION AS RELATED TO DUANE ARNOLD ENERGY CENTERS HIGH PRESSURE COOLANT INJECTION (HPCI) SYSTEM (TAC NO. MC8595)

On December 13, 2005, members of the U. S. Nuclear Regulatory Commission (NRC) staff met with Duane Arnold Energy Center (DAEC) representatives at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, MD. The meeting was a Category 1 public meeting.

The purpose of the meeting was to allow DAEC representatives to present the cork screw convection methodology which is formally known as Turbulent Penetration, and to discuss its relationship to the high pressure coolant injection system (HPCI). Additionally, DAEC representatives discussed the potential causes of steam void formation in the HPCI system, and actions taken. The NRC staff asked questions and provided feedback. DAEC plans to further evaluate the issue of the void formation.

No regulatory decisions were made at the meeting.

The meeting agenda was provided with the meeting notice (ML053210135). The licensees presentation slides are enclosed. A list of attendees is enclosed.

/RA/

Deirdre W. Spaulding, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosures:

1. Attendance List
2. Slides cc w/encls: See next page DISTRIBUTION:

PUBLIC LPLIII-1 R/F RidsNrrPMDSpaulding RidsNrrLATHarris RidsNrrDorlLple RidsNrrDorl RidsRgn3MailCenter RidsOgcRp JHuang TMensah RidsAcrsAcnwMailCenter JFair WJenson GThomas AMuniz PHabighorst TKobetz RJasinski ADAMS Accession Number: ML060390518 (Package)

ADAMS Accession Number: ML060390500 (Memorandum)

ADAMS Accession Number: ML060400058 (Slides)

OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/LPL3-1/BC(A)

NAME DSpaulding THarris Tkobetz (Ptam for)

DATE 2/17/06 2/9/06 2/17/06 OFFICIAL RECORD COPY

ATTENDANCE LIST NRC MEETING WITH DUANE ARNOLD ENERGY CENTER DECEMBER 13, 2005 Bob Coward MPR Steve Haller Duane Arnold Steve Catron Duane Arnold John Zudans FPL-E Patricia Lougheed NRC/Region III Jim Swales Duane Arnold Caroline Schlaseman MPR Walton Jensen NRC/NRR George Thomas NRC/NRR John Huang NRC/NRR John Fair NRC/NRR L. Raghavan NRC/NRR Deirdre Spaulding NRC/NRR Adrian Muniz NRC/NRR Ann Marie Stone NRC/Region III ENCLOSURE 1

Duane Arnold Energy Center cc:

Mr. J. A. Stall Regional Administrator, Region III Senior Vice President, Nuclear and Chief U.S. Nuclear Regulatory Commission Nuclear Officer Suite 210 Florida Power & Light Company 2443 Warrenville Road P. O. Box 14000 Lisle, IL 60532-4351 Juno Beach, FL 33408-0420 Mr. M. Warner Mr. M. S. Ross Vice President, Nuclear Operations Managing Attorney Support Florida Power & Light Company Florida Power & Light Company P. O. Box 14000 P. O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408-0420 Mr. R. E. Helfrich Mr. D. A. Curtland Senior Attorney Plant Manager Florida Power & Light Company Duane Arnold Energy Center P. O. Box 14000 3277 DAEC Rd.

Juno Beach, FL 33408-0420 Palo, IA 52324-9785 Mr. W. E. Webster Mr. R. S. Kundalkar Vice President, Nuclear Operations Vice President, Nuclear Engineering Florida Power & Light Company Florida Power & Light Company P. O. Box 14000 P. O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408-0420 John Bjorseth Daniel McGhee Site Director Utilities Division Duane Arnold Energy Center Iowa Department of Commerce 3277 DAEC Road Lucas Office Buildings, 5th Floor Palo, IA 52324 Des Moines, IA 50319 Steven R. Catron Chairman, Linn County Manager, Regulatory Affairs Board of Supervisors Duane Arnold Energy Center 930 1st Street SW 3277 DAEC Road Cedar Rapids, IA 52404 Palo, IA 52324 Mr. Gary Van Middlesworth U. S. Nuclear Regulatory Commission Vice President Resident Inspectors Office Duane Arnold Energy Center Rural Route #1 3277 DAEC Road Palo, IA 52324 Palo, IA 52324-0351 February 2006