April 11, 2003 LICENSEE:
Nuclear Management Company FACILITY:
Duane Arnold Energy Center
SUBJECT:
SUMMARY
OF THE APRIL 1, 2003, MEETING WITH DUNE ARNOLD ENERGY CENTER TO DISCUSS DUANE ARNOLD PERFORMANCE On April 1, 2003, a public meeting was held at the Palo Community Center, Palo, Iowa, between the Nuclear Regulatory Commission (NRC) and Duane Arnold Energy Center staff.
The purpose of the meeting was to discuss NRCs assessment of Duane Arnolds performance for the period of January 1, 2002, through December 31, 2002.
During the NRC presentation, an overall assessment of Duane Arnold performance was provided. As explained in the Annual Assessment letter from NRC to Mr. Mark Peifer, Site Vice President, Duane Arnold Energy Center, dated March 4, 2003, reference ADAMS accession number ML030640352, Duane Arnold operated in a manner that preserved public health and safety and fully met all cornerstone objectives. The slides presented that evening by the NRC are available in ADAMS (accession number ML030920432).
Before adjourning the meeting the NRC provided the opportunity for members of the public to ask questions.
/RA/
Bruce L. Burgess, Chief Branch 2 Division of Reactor Projects cc:
J. Dyer, Regional Administrator J. Caldwell, Deputy Regional Administrator G. Grant, Director, DRP S. Reynolds, Deputy Director, DRP B. Burgess, Chief, Branch 2, DRP G. Wright, Project Engineer, DRP G. Wilson, SRI, Duane Arnold S. Caudill, RI, Duane Arnold DOCUMENT NAME: G:\\Branch TSS\\EOC Ltrs\\eoc 030403\\Mtg.