MONTHYEARIR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter IR 05000498/20220062023-03-0101 March 2023 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2022006 and 05000499/2022006) ML22343A1172022-12-12012 December 2022 Notification of an NRC Protection South Texas Project - Baseline Inspection (NRC Inspection Report) 05000498/2023010 and 05000499/2023010) and Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22230C9442022-08-23023 August 2022 Mid-Cycle Planning Letter- Final ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information IR 05000498/20210062022-03-0202 March 2022 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2021006 and 05000499/2021006) ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21230A3932021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21172A2852021-06-21021 June 2021 Information Request, Security IR 2021402 ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21161A1552021-06-0909 June 2021 Notification of Inspection and Request for Information South Texas Project Unit 1 IR 05000498/20200062021-03-0303 March 2021 Annual Assessment Letter (Report 05000498/2020006 and 05000499/2020006) IR 05000498/20200052020-09-0101 September 2020 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2020005 and 05000499/2020005) ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20055E1112020-03-0303 March 2020 STP 2019006 Annual Assessment Letter ML20056D6952020-02-25025 February 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2020002 and 05000499/2020002) and Request for Information ML19295C4822019-10-21021 October 2019 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000498/2020011 and 05000499/2020011) and Request for Information ML19266A5972019-09-23023 September 2019 Notification of Inspection (NRC Inspection Report 05000498/2019004 and 05000499/2019004) and Request for Information IR 05000498/20190052019-08-30030 August 2019 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2, Report 05000498/2019005 and 05000499/2019005 IR 05000498/20180062019-03-0404 March 2019 Annual Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2018006 and 05000499/2018006) ML18344A5772018-12-10010 December 2018 Notification of NRC Design Bases Assurance Inspection (05000498/2019010 and 05000499/2019010) and Initial Request for Information IR 05000498/20180052018-09-10010 September 2018 Errata - Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Reports 05000498/2018005 and 05000499/2018005) ML18234A4182018-08-31031 August 2018 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Reports 05000498/2018005 and 05000499/2018005) IR 05000498/20170062018-03-0101 March 2018 Annual Assessment Letter for South Texas Project Electric Generating Station Units 1 and 2 (Report 05000498/2017006 and 05000499/2017006) IR 05000498/20170052017-08-28028 August 2017 Updated Inspection Plan (Reports 05000498/2017005 and 05000499/2017005) IR 05000498/20160062017-03-0101 March 2017 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (05000498/2016006 and 05000499/2016006) IR 05000498/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2016401 and 05000499/2016401) ML16237A0602016-08-31031 August 2016 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005) IR 05000498/20150062016-03-0202 March 2016 Annual Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015006 and 05000499/2015006) ML16007A7372016-01-0707 January 2016 Notification of Design Bases Inspection (Programs) (Inspection Report 05000498/2016008 and 05000499/2016008) and Initial Request for Information IR 05000498/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2015401 and 05000499/2015401) IR 05000498/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015005 and 05000499/2015005) ML15196A5472015-07-15015 July 2015 Notification of Inspection (IR 05000498/2015004 and 2015004/05000499/2015004) and Request for Information ML15160A4112015-06-0808 June 2015 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2015003 and 05000499/2015003) and Request for Information ML15098A2842015-04-0707 April 2015 Notification of Evaluations of Changes, Tests and Experiments and Permanent Plant Modification (05000498/2015007 and 05000499/2015007) and Request for Information IR 05000498/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2014402 and 05000499/2014402) IR 05000498/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2014006 and 05000499/2014006) ML14098A1722014-04-0808 April 2014 IR 05000498-14-008 and 05000499-14-008, South Texas Project Nuclear Power Plant, Units 1 & 2, Notification of an NRC Triennial Fire Protection Baseline and Request for Information IR 05000498/20130012014-03-0404 March 2014 Annual Assessment Letter for South Texas Project Electric Generating Station Units 1 and 2 (Report 05000498/2013001 and 05000499/2013001) IR 05000498/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2013006 and 05000499/2013006) ML13127A1662013-05-0707 May 2013 IR 05000498-13-405, 05000499-13-405, on 07/09 to 07/10/2013, South Texas Project Electric Generating Station - Notification of TI-186 Inspection IR 05000498/20128012013-03-0404 March 2013 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 & 2 (IR 05000498-12-801 and 05000499-12-801) IR 05000498/20120062012-09-0404 September 2012 Mid-Cycle 2012 Report (IR 05000498-12-006 and 05000499-12-006) ML1124306422011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - South Texas Project Electric Generating Station - Unit 1 and 2 ML1106107322011-03-0404 March 2011 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 & 2 ML1024403912010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - South Texas Project Electric Generating Station 2024-01-18
[Table view] Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] |
Text
ber 2, 2014
SUBJECT:
MID-CYLE ASSESSMENT LETTER SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2014006 AND 05000499/2014006)
Dear Mr. Koehl:
On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of South Texas Project Electric Generating Station during this period and its plans for future inspections at your facility.
The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2 were operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is February 9, 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Neil F. OKeefe, Chief Project Branch B Division of Reactor Projects Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80 Enclosure: South Texas Project Electric Generating Station, Units 1 and 2 Inspection /Activity Plan
ML14239A616 SUNSI Review ADAMS Publicly Available Non-Sensitive By: NOKeefe Yes No Non-Publicly Available Sensitive OFFICE RIV/BC/DRP RIV/D/DRS RIV/D/DRP NAME NOKeefe/dll AVegel TPruett SIGNATURE /RA/ /RA/VGaddy for /RA/
DATE 8/21/14 8/25/14 8/22/14
Letter to Dennis from Neil F. OKeefe dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2014006 AND 05000499/2014006)
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nick.Hernandez@nrc.gov)
Administrative Assistant (Lynn.Wright@nrc.gov)
Branch Chief (Neil.OKeefe@nrc.gov)
Senior Project Engineer (David.Proulx@nrc.gov)
Project Engineer, (Fabian.Thomas@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
RIV State Liaison Officer (Bill.Maier@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
R4DRPBC@nrc.gov R4DRSBC@nrc.gov Director, DIRS, NRR (Scott.Morris@nrc.gov)
Deputy Director, DIRS, NRR (Allen.Howe@nrc.gov)
Acting Director, DORL, NRR (Louise.Lund@nrc.gov)
Acting Deputy Director, DORL (Michael.Markley@nrc.gov)
Director, NSIR/DPR (Rob.Lewis@nrc.gov)
Chief, PLB IV, DORL, NRR (Eric.Oesterle@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPassessment Resource@nrc.gov ROPreports@nrc.gov OEMail Resource@nrc.gov Electronic Distribution for South Texas Project Electric Generating Station
Page 1 of 2 South Texas Project 08/22/2014 14:02:39 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 09/08/2014 09/12/2014 IP 7111105T Fire Protection [Triennial]
1, 2 09/22/2014 09/26/2014 IP 7111105T Fire Protection [Triennial]
EP-2 - EXERCISE SCENARIO REVIEW 2 1, 2 09/01/2014 10/02/2014 IP 7111408 Exercise Evaluation - Scenario Review TSB 52B - BIENNIAL PI&R INSPECTION 4 1, 2 11/17/2014 11/21/2014 IP 71152B Problem Identification and Resolution 1, 2 12/01/2014 12/05/2014 IP 71152B Problem Identification and Resolution EP-1 - EP PERFORMANCE INDICATORS 1 1, 2 11/03/2014 11/07/2014 IP 71151-EP01 1, 2 11/03/2014 11/07/2014 IP 71151-EP02 1, 2 11/03/2014 11/07/2014 IP 71151-EP03 EP-3 - BIENNIAL EP EXERCISE INSPECTION HAB 5 1, 2 11/03/2014 11/07/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 11/03/2014 11/07/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event EXAM - INITIAL OPERATOR EXAM 6 1 08/24/2015 08/28/2015 X02554 INITIAL EXAM STP UNIT 1 (9/2015)
2 08/24/2015 08/28/2015 X02555 INITIAL EXAM STP UNIT 2 (9/2015)
1 09/28/2015 10/09/2015 X02554 INITIAL EXAM STP UNIT 1 (9/2015)
2 09/28/2015 10/09/2015 X02555 INITIAL EXAM STP UNIT 2 (9/2015)
ISFSI - PAD POUR INSPECTION (ONE VISIT) 1 1 03/01/2015 03/31/2015 IP 60855 Operation Of An ISFSI RS 13 PI - RADIATION SAFETY 2 1, 2 04/13/2015 04/17/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2015 04/17/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2015 04/17/2015 IP 71151-OR01 1, 2 04/13/2015 04/17/2015 IP 71151-PR01 71111.08 - INSERVICE INSPECTION 2R17 1 2 04/13/2015 04/24/2015 IP 7111108P Inservice Inspection Activities - PWR EB1-17T - STP PERMANENT PLANT MODS & 50.59 3 1, 2 06/01/2015 06/12/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications RS 24 - RADIATION SAFETY 2 1, 2 08/03/2015 08/07/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 08/03/2015 08/07/2015 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 South Texas Project 08/22/2014 14:02:39 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-07T - STP TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/10/2015 08/14/2015 IP 7111107T Heat Sink Performance INSP - OPERATOR REQUAL INSPECTION 3 1, 2 09/14/2015 09/18/2015 IP 7111111B Licensed Operator Requalification Program 71111.08 - INSERVICE INSPECTION 1R19 1 1 10/12/2015 10/23/2015 IP 7111108P Inservice Inspection Activities - PWR EP-1 - BIENNIAL EP PROGAM INSPECTION 1 1, 2 12/07/2015 12/11/2015 IP 7111402 Alert and Notification System Testing 1, 2 12/07/2015 12/11/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 12/07/2015 12/11/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 12/07/2015 12/11/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATORS 1 1, 2 12/07/2015 12/11/2015 IP 71151-EP01 1, 2 12/07/2015 12/11/2015 IP 71151-EP02 1, 2 12/07/2015 12/11/2015 IP 71151-EP03 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.