MONTHYEARML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23044A6192023-02-13013 February 2023 Summary Report for Inservice Inspection (2RE22) Completed in November 2022 ML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 ML21196A4922021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval ML21144A1092021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval ML20303A2602020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20281A8542020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20191A2702020-07-0909 July 2020 Inservice Inspection Summary Report -1RE22 NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003703, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) NOC-AE-19003624, Inservice Inspection Summary Report- 1RE212019-02-0707 February 2019 Inservice Inspection Summary Report- 1RE21 NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing2018-10-18018 October 2018 Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-18003587, Inservice Inspection Summary Report -2RE192018-07-25025 July 2018 Inservice Inspection Summary Report -2RE19 NOC-AE-17003503, Inservice Inspection Summary Report - 1 RE202017-07-20020 July 2017 Inservice Inspection Summary Report - 1 RE20 NOC-AE-17003440, Inservice Inspection Summary Report -2RE18 Completed in November 20162017-02-0808 February 2017 Inservice Inspection Summary Report -2RE18 Completed in November 2016 NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing2016-04-25025 April 2016 1RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-16003355, Inservice Inspection Summary Report, 1RE192016-03-24024 March 2016 Inservice Inspection Summary Report, 1RE19 NOC-AE-15003282, Inservice Inspection Summary Report -2E172015-08-0606 August 2015 Inservice Inspection Summary Report -2E17 NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE182014-08-26026 August 2014 Inservice Inspection Summary Report - 1 RE18 NOC-AE-14003139, RE16 Inspection Summary Report for Steam Generator Tubing2014-05-22022 May 2014 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-14003112, Inservice Inspection Summary Report - 2RE162014-03-24024 March 2014 Inservice Inspection Summary Report - 2RE16 NOC-AE-13002968, Inservice Inspection Summary Report - 1RE172013-02-21021 February 2013 Inservice Inspection Summary Report - 1RE17 NOC-AE-12002803, Inservice Inspection Summary Report - 2RE152012-02-20020 February 2012 Inservice Inspection Summary Report - 2RE15 NOC-AE-11002722, RE16 Inspection Summary Report for Steam Generator Tubing2011-09-21021 September 2011 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-11002706, Inservice Inspection Summary Report - 1RE162011-07-28028 July 2011 Inservice Inspection Summary Report - 1RE16 NOC-AE-11002651, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2011-03-14014 March 2011 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-10002585, Inservice Inspection Summary Report - 2RE142010-08-0202 August 2010 Inservice Inspection Summary Report - 2RE14 NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval2010-07-29029 July 2010 Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2010-07-13013 July 2010 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-11002684, Categorization of Risk-Informed Piping2010-06-20020 June 2010 Categorization of Risk-Informed Piping ML1006401202010-02-22022 February 2010 Inservice Testing Program Description for the Third 10-Year Interval NOC-AE-10002522, Inservice Inspection Summary Report - 1RE152010-02-16016 February 2010 Inservice Inspection Summary Report - 1RE15 NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing2009-03-24024 March 2009 Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing NOC-AE-09002381, Inservice Inspection Summary Report - 2RE132009-01-20020 January 2009 Inservice Inspection Summary Report - 2RE13 NOC-AE-08002318, Inservice Inspection Summary Report - 1RE142008-06-23023 June 2008 Inservice Inspection Summary Report - 1RE14 NOC-AE-07002195, Inservice Inspection Summary Report - 2RE122007-07-25025 July 2007 Inservice Inspection Summary Report - 2RE12 NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing2007-04-16016 April 2007 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing ML0701602012007-01-0808 January 2007 Inservice Inspection Summary Report - IRE13 NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report NOC-AE-05001938, Refueling Outage Inservice Inspection Results for Steam Generator Tubing2005-10-12012 October 2005 Refueling Outage Inservice Inspection Results for Steam Generator Tubing NOC-AE-05001910, Inservice Inspection Summary Report - 1RE122005-07-15015 July 2005 Inservice Inspection Summary Report - 1RE12 NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant2005-03-0303 March 2005 Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant NOC-AE-04001763, Inservice Inspection Summary Report for Welds and Component Supports - 2RE102004-07-22022 July 2004 Inservice Inspection Summary Report for Welds and Component Supports - 2RE10 2023-08-09
[Table view] Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] |
Text
SUMMARY
REPORT for the 1RE24 INSERVICE INSPECTION of UNIT 1 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
Nuclear Operating Company
STP NUCLEAR OPERATING COMPANY Spring 2023 COVERSHEET
1 RE24 INSERVICE INSPECTION
SUMMARY
REPORT
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1
P.O. BOX289
WADSWORTH, TEXAS 77483
USNRC DOCKET NO: 50-498
OPERA TING LICENSE NO: NPF-76
COMMERCIAL OPERATION DA TE: AUGUST 25, 1988
Daniel Moon, ISi Program Owner
Reviewed by: ~ Date tJt/f C/ZJ Kettiearris,Supisor, Testing/ Programs '
SCOPE
COMPONENT SUPPORTS, WELDS, THERMAL FATIGUE, REPAIR/REPLACEMENT, AND SYSTEM PRESSSURE TESTING INSPECTION PROGRAMS (IWB, IWC, IWD, IWE, IWF)
The examinations summarized in this report were performed in accordance with the 2013 Edition of the ASME Code,Section XI that is applicable to the South Texas Project, Unit 1 fourth ten-year interval (09/25/2020-09/08/2029), first period (09/25/2020-09/24/2023). This report covers selected ASME Code Class 1, 2, and 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section XI Code Case N-532-5.
Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components, IWD-2412 for ASME Code Class 3 Systems/Components, and IWF-2410 component supports.
ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1 which established the examination and the applicable Examination Categories, frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with IWF-Table 2500-1, Examination Categories.
FORM OAR-1 OWNER'S ACTIVITY REPORT (Code Case N-532-5)
Report Numb er..,O"'A...,_R=---l~RE2-==-4=------------ ----- --- - --- - ----------- --- --
Plant South Texas Project Electric Generating Station Unit No.1 Commercial service date August 25, 1988 Refueling outage no.....,1=RE2==-4,__ _ _ _
( if applicable)
Applicable inspection interval IWB, IWC, IWD, IWF - 4th ; ~IW~E~-4~ th- -----,-- - ----- - --- - ---------
(1 st. 2nd, 3rd, 4th, other)
Applicable inspection period IWB. IWC. IWD. IWF - I st
( 1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans -=2"'0'-'-l-"-3..,Ea,..,d,_,_it,_,_io,.,n"----_ __ ___ __ __ __ __ __ __ _ _
Date and revision of inspection plans eptem bcr 25. 2022 / Revision 11
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans NIA
Code Cases used for inspection and evaluation: N-53'.l-; N-593-".' N-716-) N-729-6 N-770-5 N-72? - 1 (If applicable)
CERTIFICATE OF CONFORMANCE I certify that (a ) the statements made in this report are correct ; (b ) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of.,_l_,_,RE= 2,_.4 __ ___ _ __ ___ conforrn fthe ASME Code,Section X I. (refueling outage number )
? ~----
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Bureau Veritas Lnsurance and lnspection Company ____ of-"L"-'y_,_,nn.,.,...,M=as"-"s=ac""h"'u"'se,,,tt"'"s ______________________ _
have inspected the items described in this Owner 's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
_<Z.o __ ~_4-=-(.,_ln~sp...;;~~or'~~- ~ -=n :....aUJ;:,,.,.::~=..:~==-~=----' '-- -Commission _ __ /_ Z.._ _4---;:,(-:.,..a1""i0-rm-.1-=/,-0f~rd-:-c-:N-um-,b_e_ra _ n_,d..,,Enc--,-dor_se_m _on """t) _ __ __ ___ ___ _
Date
(07/15)
Table 1 Items With Flaws or Relevant Conditions That Required Evaluation for Continued Service
1RE24 Spring 2023
ASME Item Item Evaluation Description Category Number Description was PRESSURIZER BASE During lnservice visual Inspection Spalling F-A E1.40 SUPPORT identified on the pressurizer skirt base. CR# 23-3295 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE
REPAllt/REP.1.MEMENT PUN ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 7/12/2023 1-15-060 REPLACED BOLTS REACTOR AND FLAT 1 REPLACEMENT PUMP COOLANT WASHERS. 8/8/2023 1-19-048 REACTOR REPLACED PLUG 1 REPLACEMENT VALVE COOLANT AND SEAT. 6/7/2023 1-20 -018 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 5/4/2023 1-20 -023 ESSENTIAL 3 REPLACEMENT PIPE COOLING WATER REPLACED PIPE. 7/12/2023 1-20-027 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 5/4/2023 1-21-002 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 5/4/2023 1-21-003
THERMOWEL THERMOWELL ESSENTIAL REPLACED 3 REPLACEMENT L COOLING WATER AND SOL. 5/4/2023 1-21-010 PIPE AND ESSENTIAL REPLACED PIPE 3 REPLACEMENT FLANGE COOLING WATER AND FLANGE. 5/4/2023 1-21-011 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 7/12/2023 1-21-015 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 7/12/2023 1-21-016 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 5/4/2023 1-21-042 INSTALL PATCH FEEDWATER MATERIAL ON 2 REPAIR VALVE VALVE. 8/8/2023 1-22-003 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED PLATE. 3/20/2023 1-22-005 REPLACED END STANDBY DIESEL COVERS AND 3 REPLACEMENT COOLER GENERATOR CHANNEL HEAD. 3/20/2023 1-22-008 REPLACED END STANDBY DIESEL COVERS AND 3 REPLACEMENT COOLER GENERATOR CHANNEL HEADS. 3/20/2023 1-22-011
EXPANSION EXPANSION ESSENTIAL REPLACED 3 REPLACEMENT JOINT COOLING WATER JOINT. 7/12/2023 1-22-012 REPLACED PIPE, STANDBY DIESEL FLANGES, AND 3 REPLACEMENT PIPE GENERATOR BOLTING. 8/8/2023 1 013
REACTOR REPLACED PLUG, 1 REPLACEMENT VALVE COOLANT CAGE, AND SEAT. 7/12/2023 1-22-014 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE
ESSENTIAL REPLACED PIPE, PIPE STRAPS. 8/8/2023 COOLING WATER FLANGES, AND U-1-22-015 3 REPLACEMENT ESSENTIAL 3 REPLACEMENT PIPE COOLING WATER REPLACED PIPE. 8/8/2023 1-22-018
ESSENTIAL PERFORMED 3 REPAIR WELDOLET COOLING WATER WELD BUILDUP. 8/8/2023 1-22-019
ESSENTIAL PERFORMED 3 REPAIR WELDOLET COOLING WATER WELD BUILDUP. 8/8/2023 1-22-020 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 8/9/2023 1-22-021 EXPANSION ESSENTIAL REPLACED 1-22 -022 3 REPLACEMENT JOINT COOLING WATER FASTENERS. 7/12/2023 REACTOR 1 REPAIR VALVE COOLANT REMOVE VALVE. 5/3/2023 1-22-023 REACTOR 1 REPLACEMENT VALVE COOLANT INSTALL VALVE. 5/3/2023 1-22-025 CHEMICAL 2 REPLACEMENT VALVE VOLUME CONTROL REPLACED VALVE. 5/9/2023 1-22-026
RESIDUAL HEAT 2 REPLACEMENT VALVE REMOVAL REPLACED VALVE. 7/12/2023 1-22-028 REPLACED VALVE 2 REPLACEMENT VALVE MAIN STEAM BONNET. 5/3/2023 1-22-029 REPLACED REACTOR CARTRIDGE SEAL 1 REPLACEMENT PUMP COOLANT HOUSING 8/8/2023 1-22-032
1 REPLACEMENT VALVE SAFETY INJECTION REPLACED VALVE. 6/8/2023 1-22-043
CHEMICAL 1 REPLACEMENT PIPE VOLUME CONTROL REPLACED PIPE. 6/8/2023 1-22-044
HEAT SPENT FUEL POOL 3 REPLACEMENT EXCHANGER COOLING REPLACED PLUG. 4/12/2023 1-22 -045 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 8/9/2023 1-22-047
ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 3/25/2023 1-23-002 REACTOR FABRICATE SEAL 2 REPAIR VALVE COOLANT CAP. 7/12/2023 1-23-008 COMPONENT 3 REPLACEMENT VALVE COOLING REPLACED VALVE. 5/4/2023 1-23-010 CHEMICAL 2 REPLACEMENT VALVE VOLUME CONTROL REPLACED PLUG. 5/9/2023 1-23-011
THERMOWEL THERMOWELL ESSENTIAL REPLACED 3 REPLACEMENT L COOLING WATER AND SOL. 5/3/2023 1-23-012
2 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE REPA'IJt/ ~
!UN REPLACED 2 REPLACEMENT SNUBBER FEEDWATER SNUBBER. 4/12/2023 1-23-016 REACTOR 1 REPLACEMENT PIPE COOLANT REPLACED PIPE. 6/8/2023 1-23-017 STEAM REPLACED 2 REPLACEMENT SNUBBER GENERATOR SNUBBER. 4/12/2023 1-23-020
3