SUMMARY

REPORT for the 1RE24 INSERVICE INSPECTION of UNIT 1 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

Nuclear Operating Company

STP NUCLEAR OPERATING COMPANY Spring 2023 COVERSHEET

1 RE24 INSERVICE INSPECTION

SUMMARY

REPORT

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1

P.O. BOX289

WADSWORTH, TEXAS 77483

USNRC DOCKET NO: 50-498

OPERA TING LICENSE NO: NPF-76

COMMERCIAL OPERATION DA TE: AUGUST 25, 1988

Daniel Moon, ISi Program Owner

Reviewed by: ~ Date tJt/f C/ZJ Kettiearris,Supisor, Testing/ Programs '

SCOPE

COMPONENT SUPPORTS, WELDS, THERMAL FATIGUE, REPAIR/REPLACEMENT, AND SYSTEM PRESSSURE TESTING INSPECTION PROGRAMS (IWB, IWC, IWD, IWE, IWF)

The examinations summarized in this report were performed in accordance with the 2013 Edition of the ASME Code,Section XI that is applicable to the South Texas Project, Unit 1 fourth ten-year interval (09/25/2020-09/08/2029), first period (09/25/2020-09/24/2023). This report covers selected ASME Code Class 1, 2, and 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section XI Code Case N-532-5.

Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components, IWD-2412 for ASME Code Class 3 Systems/Components, and IWF-2410 component supports.

ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1 which established the examination and the applicable Examination Categories, frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with IWF-Table 2500-1, Examination Categories.

FORM OAR-1 OWNER'S ACTIVITY REPORT (Code Case N-532-5)

Report Numb er..,O"'A...,_R=---l~RE2-==-4=------------ ----- --- - --- - ----------- --- --

Plant South Texas Project Electric Generating Station Unit No.1 Commercial service date August 25, 1988 Refueling outage no.....,1=RE2==-4,__ _ _ _

( if applicable)

Applicable inspection interval IWB, IWC, IWD, IWF - 4th ; ~IW~E~-4~ th- -----,-- - ----- - --- - ---------

(1 st. 2nd, 3rd, 4th, other)

Applicable inspection period IWB. IWC. IWD. IWF - I st

( 1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans -=2"'0'-'-l-"-3..,Ea,..,d,_,_it,_,_io,.,n"----_ __ ___ __ __ __ __ __ __ _ _

Date and revision of inspection plans eptem bcr 25. 2022 / Revision 11

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans NIA

Code Cases used for inspection and evaluation: N-53'.l-; N-593-".' N-716-) N-729-6 N-770-5 N-72? - 1 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a ) the statements made in this report are correct ; (b ) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of.,_l_,_,RE= 2,_.4 __ ___ _ __ ___ conforrn fthe ASME Code,Section X I. (refueling outage number )

? ~----

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Bureau Veritas Lnsurance and lnspection Company ____ of-"L"-'y_,_,nn.,.,...,M=as"-"s=ac""h"'u"'se,,,tt"'"s ______________________ _

have inspected the items described in this Owner 's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

_<Z.o __ ~_4-=-(.,_ln~sp...;;~~or'~~- ~ -=n :....aUJ;:,,.,.::~=..:~==-~=----' '-- -Commission _ __ /_ Z.._ _4---;:,(-:.,..a1""i0-rm-.1-=/,-0f~rd-:-c-:N-um-,b_e_ra _ n_,d..,,Enc--,-dor_se_m _on """t) _ __ __ ___ ___ _

Date

(07/15)

Table 1 Items With Flaws or Relevant Conditions That Required Evaluation for Continued Service

1RE24 Spring 2023

ASME Item Item Evaluation Description Category Number Description was PRESSURIZER BASE During lnservice visual Inspection Spalling F-A E1.40 SUPPORT identified on the pressurizer skirt base. CR# 23-3295 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE

REPAllt/REP.1.MEMENT PUN ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 7/12/2023 1-15-060 REPLACED BOLTS REACTOR AND FLAT 1 REPLACEMENT PUMP COOLANT WASHERS. 8/8/2023 1-19-048 REACTOR REPLACED PLUG 1 REPLACEMENT VALVE COOLANT AND SEAT. 6/7/2023 1-20 -018 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 5/4/2023 1-20 -023 ESSENTIAL 3 REPLACEMENT PIPE COOLING WATER REPLACED PIPE. 7/12/2023 1-20-027 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 5/4/2023 1-21-002 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 5/4/2023 1-21-003

THERMOWEL THERMOWELL ESSENTIAL REPLACED 3 REPLACEMENT L COOLING WATER AND SOL. 5/4/2023 1-21-010 PIPE AND ESSENTIAL REPLACED PIPE 3 REPLACEMENT FLANGE COOLING WATER AND FLANGE. 5/4/2023 1-21-011 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 7/12/2023 1-21-015 ESSENTIAL REPLACED 3 REPLACEMENT FLANGE COOLING WATER FLANGE. 7/12/2023 1-21-016 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 5/4/2023 1-21-042 INSTALL PATCH FEEDWATER MATERIAL ON 2 REPAIR VALVE VALVE. 8/8/2023 1-22-003 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED PLATE. 3/20/2023 1-22-005 REPLACED END STANDBY DIESEL COVERS AND 3 REPLACEMENT COOLER GENERATOR CHANNEL HEAD. 3/20/2023 1-22-008 REPLACED END STANDBY DIESEL COVERS AND 3 REPLACEMENT COOLER GENERATOR CHANNEL HEADS. 3/20/2023 1-22-011

EXPANSION EXPANSION ESSENTIAL REPLACED 3 REPLACEMENT JOINT COOLING WATER JOINT. 7/12/2023 1-22-012 REPLACED PIPE, STANDBY DIESEL FLANGES, AND 3 REPLACEMENT PIPE GENERATOR BOLTING. 8/8/2023 1 013

REACTOR REPLACED PLUG, 1 REPLACEMENT VALVE COOLANT CAGE, AND SEAT. 7/12/2023 1-22-014 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE

ESSENTIAL REPLACED PIPE, PIPE STRAPS. 8/8/2023 COOLING WATER FLANGES, AND U-1-22-015 3 REPLACEMENT ESSENTIAL 3 REPLACEMENT PIPE COOLING WATER REPLACED PIPE. 8/8/2023 1-22-018

ESSENTIAL PERFORMED 3 REPAIR WELDOLET COOLING WATER WELD BUILDUP. 8/8/2023 1-22-019

ESSENTIAL PERFORMED 3 REPAIR WELDOLET COOLING WATER WELD BUILDUP. 8/8/2023 1-22-020 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 8/9/2023 1-22-021 EXPANSION ESSENTIAL REPLACED 1-22 -022 3 REPLACEMENT JOINT COOLING WATER FASTENERS. 7/12/2023 REACTOR 1 REPAIR VALVE COOLANT REMOVE VALVE. 5/3/2023 1-22-023 REACTOR 1 REPLACEMENT VALVE COOLANT INSTALL VALVE. 5/3/2023 1-22-025 CHEMICAL 2 REPLACEMENT VALVE VOLUME CONTROL REPLACED VALVE. 5/9/2023 1-22-026

RESIDUAL HEAT 2 REPLACEMENT VALVE REMOVAL REPLACED VALVE. 7/12/2023 1-22-028 REPLACED VALVE 2 REPLACEMENT VALVE MAIN STEAM BONNET. 5/3/2023 1-22-029 REPLACED REACTOR CARTRIDGE SEAL 1 REPLACEMENT PUMP COOLANT HOUSING 8/8/2023 1-22-032

1 REPLACEMENT VALVE SAFETY INJECTION REPLACED VALVE. 6/8/2023 1-22-043

CHEMICAL 1 REPLACEMENT PIPE VOLUME CONTROL REPLACED PIPE. 6/8/2023 1-22-044

HEAT SPENT FUEL POOL 3 REPLACEMENT EXCHANGER COOLING REPLACED PLUG. 4/12/2023 1-22 -045 ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 8/9/2023 1-22-047

ESSENTIAL 3 REPLACEMENT VALVE COOLING WATER REPLACED VALVE. 3/25/2023 1-23-002 REACTOR FABRICATE SEAL 2 REPAIR VALVE COOLANT CAP. 7/12/2023 1-23-008 COMPONENT 3 REPLACEMENT VALVE COOLING REPLACED VALVE. 5/4/2023 1-23-010 CHEMICAL 2 REPLACEMENT VALVE VOLUME CONTROL REPLACED PLUG. 5/9/2023 1-23-011

THERMOWEL THERMOWELL ESSENTIAL REPLACED 3 REPLACEMENT L COOLING WATER AND SOL. 5/3/2023 1-23-012

2 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE REPA'IJt/ ~

!UN REPLACED 2 REPLACEMENT SNUBBER FEEDWATER SNUBBER. 4/12/2023 1-23-016 REACTOR 1 REPLACEMENT PIPE COOLANT REPLACED PIPE. 6/8/2023 1-23-017 STEAM REPLACED 2 REPLACEMENT SNUBBER GENERATOR SNUBBER. 4/12/2023 1-23-020

3