MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000498/20213012021-09-15015 September 2021 NRC Examination Report 05000498/2021301; 05000499/2021301 IR 05000498/20183012018-12-14014 December 2018 NRC Initial Operator Licensing Examination Report 05000498/2018301 and 05000499/2018301 IR 05000498/20163012016-05-31031 May 2016 NRC Retake Examination Report 05000498/2016301; 05000499/2016301 IR 05000498/20153012015-10-27027 October 2015 Er 05000498/2015301; 05000499/2015301; on September 24, 2015 - October 2, 2015; South Texas Project Electric Generating Station, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000498/20143012014-08-15015 August 2014 Er 05000498-14-301; 05000499-14-301; South Texas Project Electrical Generating Station; Initial Operator Licensing Retake Examination Report IR 05000498/20103012010-06-28028 June 2010 Er 05000498-10-301; 05000499-10-301; 05/27/2010 06/07/2010; South Texas Project Electric Generating Station, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000498/20093012010-01-27027 January 2010 Er 05000498-09-301; 05000499-09-301; December 3 - 17, 2009; South Texas Project Electric Generating Station, Units 1 and 2; Initial Operator Licensing Examination Report ML0820001252008-07-15015 July 2008 Operator Licensing National Examination Schedule IR 05000498/20053012006-01-12012 January 2006 Er 05000498-05-301; 05000499-05-301 on 11/14-18/2005; South Texas Project, Initial Operator Licensing Examination ML0715602122005-11-14014 November 2005 11-2005-FINAL Operating Exam ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination 2021-09-15
[Table view] |
Text
ust 15, 2014
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 and 2 - NRC RETAKE EXAMINATION REPORT 05000498/2014301; 05000499/2014301
Dear Mr. Koehl:
On May 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license retake examination at South Texas Project. The enclosed report documents the examination results and licensing decision. A telephonic exit meeting was conducted on May 5, 2014, with Mr. Ken Struble, Supervisor Initial Licensed Operators, who was provided the NRC licensing decision. The examination included the evaluation of one applicant for an instant senior reactor operator license. The license examiners determined that the applicant satisfied the requirements of 10 CFR Part 55, and the appropriate license has been issued. There were no post examination comments submitted by your staff. The enclosure contains details of this report.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent Gaddy, Chief Operations Branch Division of Reactor Safety Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80 Enclosure:
NRC Examination Report 05000498/2014301; 05000499/2014301
ML14230A020 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: SMG Yes No Non-Publicly Available Sensitive NRC-002 OFFICE SOE:OB C:DRP/B C:OB NAME SGarchow:TEK NOKeefe VGaddy SIGNATURE /RA/ /RA/ /RA/
DATE 8/11/14 8/15/14 8/15/14
Letter to Dennis from Vincent Gaddy dated August 15, 2014 SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 and 2 - NRC RETAKE EXAMINATION REPORT 05000498/2014301; 05000499/2014301 DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nick.Hernandez@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Dockets: 50-498, 50-499 Licenses: NPF-76, NPF-80 Report: 05000498/2014301; 05000499/2014301 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: FM 521 - 8 miles west of Wadsworth Wadsworth, Texas 77483 Dates: May 1, 2014 Inspectors: Steve Garchow, Senior Operations Engineer Vincent Gaddy, Chief Approved By: Operations Branch Division of Reactor Safety Enclosure
SUMMARY
ER 05000498/2014301; 05000499/2014301; South Texas Project Electrical Generating Station;
Initial Operator Licensing Retake Examination Report NRC examiners evaluated the competency of one applicant for an instant senior reactor operator license at South Texas Project.
The licensee developed the examination using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on May 1, 2014.
The examiners determined that the applicant satisfied the requirements of 10 CFR Part 55, and the appropriate license has been issued.
NRC-Identified and Self-Revealing Findings
No findings were identified.
Licensee-Identified Violations
No findings were identified.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Application
a. Scope
NRC examiners reviewed the license application submitted to ensure the applicant satisfied relevant license eligibility requirements.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed the examination outline and draft examination submitted by the licensee against the requirements of NUREG-1021.
b. Findings
NRC examiners provided outline and draft examination comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined the written examination initially submitted by the licensee was within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On May 1, 2014, the licensee proctored the administration of the written examination to the applicant. The licensee staff graded the written examination, analyzed the results, and presented their analysis to the NRC on May 2, 2012.
The operating tests were waived for the applicant because he passed these items earlier in the year and because the licensee requested and received waivers for these items for the retake examination.
b. Findings
No findings were identified.
The applicant passed the written examination. The final written examination may be accessed in the ADAMS system under the accession number noted in the attachment.
There were no post examination comments as indicated in the licensee submittal.
.4 Simulation Facility Performance
a. Scope
The NRC examiners did not observe simulator performance with regard to plant fidelity.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for both the preparation and examination administration for compliance with 10 CFR 55.49 and NUREG-1021. Plans for applicant control were discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
A telephonic exit was conducted on May 5, 2014, between Mr. Steve Garchow, Chief Examiner, and Mr. Ken Struble, Supervisor Initial Licensed Operators.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
Mr. Ken Struble, Supervisor Initial Licensed Operators
NRC Personnel
Fred Sanchez, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED