Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Reports 05000498/2018005 and 05000499/2018005)
ML18234A418
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/31/2018
From: Nick Taylor
NRC Region 4, NRC/RGN-IV/DRP
To: Gerry Powell
South Texas
References
IR 2018005
Download: ML18234A418 (5)


See also: IR 05000498/2018005

Text

August 31, 2018

Mr. G. T. Powell

President and CEO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: UPDATED INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC

GENERATING STATION, UNITS 1 AND 2 (REPORTS 05000498/2018005 AND

05000499/2018005)

Dear Mr. Powell:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for South

Texas Project Electric Generating Station, Units 1 and 2. The NRC provides the inspection plan

to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the last twelve months of the inspection plan are tentative and may be

revised. The NRC will contact you as soon as possible to discuss changes to the inspection

plan should circumstances warrant any changes.

Additionally, as reflected in the enclosure, during this period the NRC staff will complete

Temporary Instruction 2515/194, Inspection of the Licensee's Implementation of Industry

Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power

Systems (NRC Bulletin 2012-01).

In order to verify the adequacy of the security controls for a new independent spent fuel storage

installation, the NRC will also conduct Inspection Procedure 81311, Physical Security

Requirements for Independent Spent Fuel Storage Installations, prior to the first loading of

spent fuel. The NRC will use the advance notification required under § 72.212 (b)(1) to

coordinate our initial inspection of this facility.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

G. Powell 2

NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Project Branch B

Division of Reactor Projects

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Enclosure: Inspection Plan

IP 22 Inspection Activity Plan Report

South Texas Project

08/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

BIENNIAL PI&R 4

1, 2 08/06/2018 08/09/2018 IP 71152B 000747 Problem Identification and Resolution

1, 2 08/20/2018 08/23/2018 IP 71152B 000747 Problem Identification and Resolution

STP HEAT SINK PERFORMANCE 2

1, 2 09/10/2018 09/14/2018 IP 71111.07T 000700 Heat Sink Performance -Triennial

INITIAL EXAM 4

1, 2 09/16/2018 09/22/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 10/21/2018 11/03/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

TI 2515/194 2

1, 2 12/03/2018 12/07/2018 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the

Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin

2012-01)

Securiity Access Control .02 1

1, 2 02/11/2019 02/15/2019 IP 71130.02 000734 Access Control

1, 2 02/11/2019 02/15/2019 IP 71151 001338 Performance Indicator Verification

RP INSPECTION (2,4) 2

1, 2 03/11/2019 03/15/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls

1, 2 03/11/2019 03/15/2019 IP 71124.04 000729 Occupational Dose Assessment

SOUTH TEXAS DBA TEAM INSPECTION 6

1, 2 03/25/2019 04/12/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

INITIAL EXAM 5

1, 2 06/16/2019 06/22/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 07/14/2019 07/20/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION 1

1, 2 07/08/2019 07/12/2019 IP 71114.02 000717 Alert and Notification System Testing

1, 2 07/08/2019 07/12/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1, 2 07/08/2019 07/12/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1, 2 07/08/2019 07/12/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

Enclosure

This report does not include INPO and OUTAGE activities. Page 1 of 2

This report shows only on-site and announced inspection procedures.

8/22/2018 7:59:58 AM

IP 22 Inspection Activity Plan Report

South Texas Project

08/01/2018 - 06/30/2020

Unit Start End Activity CAC Title Staff Count

EP PROGRAM INSPECTION 1

1, 2 07/08/2019 07/12/2019 IP 71151 001397 Performance Indicator Verification

BRQ 3

1, 2 08/25/2019 08/31/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

(Biennial)

Security Protective Strategy and Target Set .05 / .14 4

1, 2 09/02/2019 11/08/2019 IP 71130.14 000743 Review of Power Reactor Target Sets

1, 2 09/23/2019 09/27/2019 IP 71130.05 000737 Protective Strategy Evaluation

RP INSPECTION (1,3) - RFO 2

1, 2 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

Triennial Fire Protection Inspection 4

1, 2 01/27/2020 01/31/2020 IP 71111.05T 000696 Fire Protection (Triennial)

1, 2 02/10/2020 02/14/2020 IP 71111.05T 000696 Fire Protection (Triennial)

RS12PI Radiation Safety 2

1, 2 03/30/2020 04/03/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 03/30/2020 04/03/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls

South Texas 1, 2 - Evaluations of Changes, Tests, and Experiments 3

1, 2 05/11/2020 05/15/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments

INITIAL EXAM 8

1, 2 06/07/2020 06/13/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

This report does not include INPO and OUTAGE activities. Page 2 of 2

This report shows only on-site and announced inspection procedures.

8/22/2018 7:59:58 AM

ML18234A418

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NTaylor Yes No Publicly Available Sensitive NRC-002

OFFICE C:PSB1 C:DRP/B

NAME JGroom NTaylor

SIGNATURE /RA/ /RA/

DATE 8/9/18 8/31/18