March 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION (REPORT 05000498/2018006 AND 05000499/2018006)

Dear Mr. Powell:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of South Texas Project Electric Generating Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections, which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects

Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80

Enclosure:

Inspection Plan

South Texas Project 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count South Texas Dry Run 3 and programs review

1 06/11/2018 01/12/2019 IP 60854 001000 Preoperational Testing Of An ISFSI

06/11/2018 01/12/2019 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations

06/11/2018 01/12/2019 IP 60857 001004 Review of 10 CFR 72.48 Evaluations South Texas Dry Run 4 and First Loading

1 01/02/2019 01/31/2019 IP 60854 001000 Preoperational Testing Of An ISFSI

01/02/2019 01/31/2019 IP 60855 001001 Operation Of An ISFSI

01/02/2019 03/31/2019 IP 60857 001004 Review of 10 CFR 72.48 Evaluations SOUTH TEXAS DBA TEAM INSPECTION

1, 2 03/03/2019 04/13/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

RP INSPECTION (2,4)

1, 2 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/18/2019 03/22/2019 IP 71124.04 000728 Occupational Dose Assessment Security Protective Strategy w/FOF exercise

1, 2 06/03/2019 06/07/2019 IP 71130.05 000737 Protective Strategy Evaluation STP 2019 INITIAL EXAM

1, 2 06/16/2019 06/22/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 07/14/2019 07/20/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION

1, 2 07/08/2019 07/12/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 07/08/2019 07/12/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 07/08/2019 07/12/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 07/08/2019 07/12/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 07/08/2019 07/12/2019 IP 71151 001397 Performance Indicator Verification Security Access Control.02

1, 2 09/02/2019 11/08/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 09/23/2019 09/27/2019 IP 71130.02 000734 Access Control 1, 2 09/23/2019 09/27/2019 IP 71151 001338 Performance Indicator Verification 2/22/2019 8:38:36 AM Page 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

South Texas Project 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count INSERVICE INSPECTION 2RF20

2 10/14/2019 10/25/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP INSPECTION (1,3) - RFO

1, 2 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation STP 2019 BRQ

1, 2 11/10/2019 11/16/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Triennial Fire Protection Inspection

1, 2 01/27/2020 01/31/2020 IP 71111.05T 000696 Fire Protection (Triennial)

1, 2 02/10/2020 02/14/2020 IP 71111.05T 000696 Fire Protection (Triennial)

Inservice Inspection 1R22

1 03/30/2020 04/10/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RS12PI Radiation Safety

1, 2 03/30/2020 04/03/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/30/2020 04/03/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls South Texas 1, 2 - Evaluations of Changes, Tests, and Experiments

1, 2 05/11/2020 05/15/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments STP 2020 INITIAL EXAM

1, 2 06/07/2020 06/13/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 07/12/2020 07/18/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

1, 2 07/19/2020 07/25/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RS5678 Radiation Safety PS Team

1, 2 09/14/2020 09/18/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 09/14/2020 09/18/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 09/14/2020 09/18/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 09/14/2020 09/18/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2/22/2019 8:38:36 AM Page 2 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

South Texas Project 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count MC&A - Material Control & Accounting

1, 2 09/14/2020 09/18/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

South Texas 1, 2 - Heat Sink Performance (Triennial)

1, 2 09/28/2020 10/02/2020 IP 71111.07T 000700 Heat Sink Performance -Triennial BIENNIAL PI&R

1, 2 10/19/2020 10/23/2020 IP 71152B 000747 Problem Identification and Resolution 1, 2 11/02/2020 11/06/2020 IP 71152B 000747 Problem Identification and Resolution EP Exercise and PI Inspection

1, 2 10/26/2020 10/30/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 10/26/2020 10/30/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/26/2020 10/30/2020 IP 71151 001397 Performance Indicator Verification 2/22/2019 8:38:36 AM Page 3 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

ML19053A540 SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: NHT Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SPE:B DRP/C:B

NAME BTharakan NTaylor

SIGNATURE

/RA/

/RA/

DATE 2/19/19 3/4/19