IR 05000354/2016006

From kanterella
Revision as of 06:35, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2016006)
ML17058A408
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/01/2017
From: Michael Scott
Division Reactor Projects I
To: Sena P
Public Service Enterprise Group
References
IR 2016006
Download: ML17058A408 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 March 1, 2017 Mr. Peter Sena President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2016006)

Dear Mr. Sena:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Hope Creek Generating Station Unit 1 (Hope Creek), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Hope Creek during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRCs Reactor Oversight Process (ROP)

Action Matrix in Inspection Manual Chapter 0305, Operating Assessment Program. This conclusion was based on a single inspection finding related to maintenance of the high-pressure coolant injection system having low-to-moderate safety significance (i.e., White) in the Mitigating Systems Cornerstone, and all PIs within the expected range (i.e., Green). As stated in our final significance determination and follow-up assessment letter (Report 05000354/2016008; ML17033B541 1) dated February 06, 2017, the NRC has assessed Hope Creek to be in the Regulatory Response column, retroactive to the third calendar quarter of 2016 when this performance issue was identified. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, after you notify the NRC of your readiness for this inspection. This inspection is conducted to provide assurance that the root causes and contributing causes of any performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. inspection plan are tentative and may be revised. In addition to baseline inspections, the NRC will perform IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Michael L. Scott, Director Division of Reactor Projects Docket No.: 50-354 License No.: NPF-57 Enclosure:

Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML17058A408 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME RBarkley FBower MScott DATE 2/22/17 2/27/17 2/27/17/17

Page 1 of 2 Hope Creek 02/02/2017 15:25:29 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71152B - PI&R BIENNIAL 4 1 01/30/2017 02/03/2017 IP 71152B Problem Identification and Resolution 1 02/13/2017 02/17/2017 IP 71152B Problem Identification and Resolution ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 1 1 03/06/2017 03/10/2017 IP 60855 Operation Of An ISFSI 1 03/06/2017 03/10/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - RAD PROTECTION 1 1 02/27/2017 03/03/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/27/2017 03/03/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 02/27/2017 03/03/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 02/27/2017 03/03/2017 IP 71124.05 Radiation Monitoring Instrumentation 50.59 - EVALS OF CHANGES, TESTS, & EXPERIMENTS 3 1 03/27/2017 03/31/2017 IP 7111117T-5059scrn screenings and/or applicability determinations EP - EP PROGRAM INSPECTION 1 1 06/05/2017 06/09/2017 IP 7111402 Alert and Notification System Testing 1 06/05/2017 06/09/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 06/05/2017 06/09/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 06/05/2017 06/09/2017 IP 71151 Performance Indicator Verification 7111121N - EQ PROGRAM 3 1 05/08/2017 05/12/2017 IP 7111121N Component Design Bases Inspection (Programs)

1 05/22/2017 05/26/2017 IP 7111121N Component Design Bases Inspection (Programs)

71124.06 - RETS 1 1 06/12/2017 06/16/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111107T - TRIENNIAL HEAT SINK 1 1 06/19/2017 06/23/2017 IP 7111107T Heat Sink Performance 2/12EXAM - HOPE CREEK INITIAL EXAM 4 1 01/08/2018 01/12/2018 U01958 FY18 HOPE CREEK EXAM (FEBRUARY 2018)

1 02/12/2018 02/23/2018 U01958 FY18 HOPE CREEK EXAM (FEBRUARY 2018)

71124 - RAD PROTECTION 1 1 07/31/2017 08/04/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 71124 - RAD PROTECTION 1 1 09/18/2017 09/22/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/18/2017 09/22/2017 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Hope Creek 02/02/2017 15:25:29 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD PROTECTION 1 1 09/18/2017 09/22/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 09/18/2017 09/22/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 1 10/16/2017 10/20/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - BASELINE HP 1 1 01/22/2018 01/26/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 01/22/2018 01/26/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 01/22/2018 01/26/2018 IP 71124.04 Occupational Dose Assessment U1 ISI - UNIT 1 INSERVICE INSPECTION 2 1 04/23/2018 04/27/2018 IP 7111108G Inservice Inspection Activities - BWR 71124 - BASELINE HP 1 1 04/30/2018 05/04/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/30/2018 05/04/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 04/30/2018 05/04/2018 IP 71124.04 Occupational Dose Assessment 71124.07 - REMP 1 1 06/25/2018 06/29/2018 IP 71124.07 Radiological Environmental Monitoring Program 7111121M - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1 07/16/2018 07/20/2018 IP 7111121M Component Design Bases Inspection (Teams)

1 07/30/2018 08/03/2018 IP 7111121M Component Design Bases Inspection (Teams)

REQUAL - HC REQUAL INSP WITH P/F RESULTS 2 1 10/08/2018 10/12/2018 IP 7111111A Licensed Operator Requalification Program - Annual Review 1 10/08/2018 10/12/2018 IP 7111111B Licensed Operator Requalification Program 71124 - BASELINE HP 1 1 11/26/2018 11/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/26/2018 11/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 11/26/2018 11/30/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/26/2018 11/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/26/2018 11/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.