ML19210C675

From kanterella
Revision as of 04:48, 15 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs of Review of Guidelines for Operability of Valves Associated W/Containment Venting & Purging.Operability Will Be Verified by Analysis.Results Available by 800107
ML19210C675
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/14/1979
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GD-79-2902, NUDOCS 7911190415
Download: ML19210C675 (1)


Text

.November 14, 1979

.FILE: NG-3514 (B)

SERIAL NO.: GD-79-2902 Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.

20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 CONTAINMENT PURGING AND VENTING DURING NORMAL OPERATION - GUIDELINES FOR VALVE OPERABILITY

Dear Mr. Eisenhut:

In accordance with the request contained in your letter of September 27, 1979, we have reviewed the guidelines for valve operability of the valves associated with containment venting and purging during normal operation.

It is our intent to verify the operability of the subject valves at our Brunswick Steam Electric Plant by analysis. The results of these analyses shall be available by January 7, 1980.

Yours very truly,.. (b~ f <<.

(G Ud-k.v E. E. Utley Executive Vice President Power Supply & Customer Services MLB/CSB/j cb 1351 351 4 0.791119O 4-l5