ML19210C675
| ML19210C675 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/14/1979 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| GD-79-2902, NUDOCS 7911190415 | |
| Download: ML19210C675 (1) | |
Text
.
November 14, 1979 FILE: NG-3514 (B)
SERIAL NO.: GD-79-2902 Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 CONTAINMENT PURGING AND VENTING DURING NORMAL OPERATION - GUIDELINES FOR VALVE OPERABILITY
Dear Mr. Eisenhut:
In accordance with the request contained in your letter of September 27, 1979, we have reviewed the guidelines for valve operability of the valves associated with containment venting and purging during normal operation.
It is our intent to verify the operability of the subject valves at our Brunswick Steam Electric Plant by analysis. The results of these analyses shall be available by January 7, 1980.
Yours very truly,
.. (b~ f <<.
(
G Ud-k.v E. E. Utley Executive Vice President Power Supply & Customer Services MLB/CSB/j cb 1351 351 4
0 791119O 4-l5