ML071570118

From kanterella
Revision as of 00:19, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

E-MAIL: (NPA-PD) Cost Benefit Equation Terms
ML071570118
Person / Time
Site: Pilgrim
Issue date: 05/24/2007
From: Palla R
NRC/NRR/ADES
To: Jackie Jones
Sandia
References
TAC MD3698
Download: ML071570118 (3)


Text

iRort Palla -Cost Benefit Equation Terms .....Page 1 From: Robert Palla To: jojones@sandia.gov Date: 05/24/2007 7:10:00 AM

Subject:

Cost Benefit Equation Terms Joe -I am not sure whether I had provided you with this table previously.

It shows how each of the terms in the cost benefit equation are derived, and their relative significance for Pilgrim. Bob CC: nbixler@sandia.gov

1. C':\t6ýip\GW)00001.ýýTýýý'MPý-'-P-aiWi 11 I c:\te1~n p\GW}OOQOl .TMP Page 1<Mail Envelope Properties (46557288.5A6
18 :10412)

Subject:

Creation Date From: Created By: Cost Benefit Equation Terms 05/24/2007 7:10:00 AM Robert Palla RLP3 (@l)nrc.gov Recipients sandia.gov AM jojones (ioiones(asandia.gov) nbixler CC (nbixler(asandia.gov)

Action Transferred Date & Time 05/24/2007 7:10:30 Post Office Delivered Route sandia.gov Files Size MESSAGE 505 Cost benefit equation and description of terms.wpd AM Date & Time 05/24/2007 7:10:00 AM 9603 02/21/2007 11:13:12 Options Auto Delete: Expiration Date: Notify Recipients:

Priority: ReplyRequested:

Return Notification:

Concealed

Subject:

Security: To Be Delivered:

Status Tracking: No None Yes Standard No None No Standard Immediate Delivered

& Opened

.3 4 Net Value = (APE + AOC + AOE + AOSC) -COE, where APE =AOC =AOE =AOSC =COE-averted public exposure costs averted offsite property damage costs averted occupational exposure costs averted onsite costs averted cleanup and decontamination costs (ACC) + averted replacement power costs (ARPC)cost of enhancement Cost Significance NUREG/BR-Related Parameters Value If All Internally-Initiated Core Factor 0184 Section Damage Events at Pilgrim Are Eliminated APE Offsite exposure 5.7.1 AP-Rem (from MACCS2) $314K AOC Offsite economic 5.7.5 AOffsite Economic Cost Risk -OECR (from MACCS2) $566K From 12/12/2006 Entergy letter, Attachment C, Table E. 1-15:-CAPB-12: $4.85E6/event

-CAPB-14: $4.96E9/event

-CAPB-15: $18.0E9/event

-frequency-weighted sum for all CAPBs = $8.21 E9/event From NUREG/BR-0184, Table 5.6 (1990$ costs, within 50 miles):-average for all NUREG-1 150 plants = $2.46E8/event

--highest NUREG-1 150 plant (Peach Bottom) = $2.71 E9/event AOE Onsite exposure 5.7.3 Immediate occupational dose (3,300 P-Rem) $2K Long term occupational dose (20,000 P-Rem)ACC Onsite economic 5.7.6.1 Onsite cleanup and decontamination cost ($1.1E9.single event, PW) $76K ARPC Onsite economic 5.7.6.2 Plant power level. $51 K