IR 05000382-09-009, on 08/24/2009, Waterford Steam Electric Station, Unit 3 - Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection
ML091770560
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/26/2009
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Kowalewski J
Entergy Operations
References
IR-09-009
Download: ML091770560 (10)


See also: IR 05000382/2009009

Text

June 26, 2009

Joseph Kowalewski, Vice President, Operations

Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - INITIAL INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION REPORT 05000382/2009009

Dear Mr. Joseph Kowalewski,

On August 24, 2009, the NRC will begin a triennial baseline Component Design Bases Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection." The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office preparation week. In addition, a number of operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of four NRC inspectors and two contractors, of which five will focus on engineering and one on operations. The current inspection schedule is as follows:

Onsite information gathering visit: Week of August 3, 2009 Preparation Week: August 17-21, 2009 Onsite weeks: August 24-28, 2009 and September 8-18, 2009

The purpose of the information gathering visit is to meet with members of your staff to identify potential risk-significant components and operator actions. The lead inspector will also request a tour of the plant with members of your operations staff and probabilistic safety assessment staff. During the onsite weeks, several days of time will be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios. Additional information and documentation needed to support the inspection will be identified during the inspection, including interviews with engineering managers, engineers, and probabilistic safety assessment staff.

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 E. LAMAR BLVD., SUITE 400ARLINGTON, TEXAS 76011-4005

Entergy Operations, Inc. - 2 -

Our experience with these inspections has shown that they are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists information necessary for the information gathering visit and for general preparation. This information should be available to the regional office no later than July 22, 2009. Insofar as possible, this information should be provided electronically to the lead inspector. Since the inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested is those items that the team will need access to during the preparation week in order to finalize the samples to be inspected. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made throughout all three onsite weeks for specific documents needed to complete the review of that component/selection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests, questions, and concerns are addressed in a timely manner.

The lead inspector for this inspection is Mr. Ronald A. Kopriva. We understand that our licensing engineer contact for this inspection is Mr. Michael Mason. If there are any questions about the inspection or the requested materials, please contact the lead inspector at (817) 860-8104 or via e-mail at ron.kopriva@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/

Thomas Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety

Docket: 50-382 License: NPF-38

Enclosure: Component Design Basis Inspection

Document Request cc w/enclosure:

Entergy Operations, Inc. - 3 -

Senior Vice President Entergy Nuclear Operations P. O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

Vice President, Operations Support Entergy Services, Inc. P. O. Box 31995 Jackson, MS 39286-1995

Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc. P. O. Box 31995

Jackson, MS 39286-1995

Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Director Nuclear Safety Assurance

Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751

General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Manager, Licensing Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093

Chairman Louisiana Public Service Commission

P. O. Box 91154 Baton Rouge, LA 70821-9154

Entergy Operations, Inc. - 4 -

Parish President Council St. Charles Parish P. O. Box 302

Hahnville, LA 70057

Director, Nuclear Safety & Licensing Entergy, Operations, Inc. 440 Hamilton Avenue

White Plains, NY 10601

Louisiana Department of Environmental Quality, Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312

Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288

Federal Regional Center Denton, TX 76209

Entergy Operations, Inc. - 5 -

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Chuck.Casto@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Ray.Azua@nrc.gov) Resident Inspector (Dean.Overland@nrc.gov ) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (George.Replogle@nrc.gov) WAT Site Secretary (Linda.Dufrene@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) Regional Counsel (Karla.Fuller@nrc.gov ) Congressional Affairs Officer (Jenny.Weil@nrc.gov ) OEMail Resource DRS STA (Dale.Powers@nrc.gov) OEDO RIV Coordinator (Leigh.Trocine@nrc.gov ) ROPreports

File located: R:\DRP\REACTORS\WT3 CDBI RFI - RAK ML091770560 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials TRF Publicly Avail Yes No Sensitive Yes No Sens. Type Initials TRF

EB 1 C:EB 1 R. Kopriva T. Farnholtz /RA/ /RA/ 6/26/09 6/26/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Entergy Operations, Inc. - 6 -

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Chuck.Casto@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Ron.Cohen@nrc.gov ) Resident Inspector (Nicholas.Hernandez@nrc.gov ) Resident Inspector (Mahdi.Hayes@nrc.gov ) Branch Chief, DRP/A (Wayne.Walker@nrc.gov ) Senior Project Engineer, DRP/A clyde.osterholtz@nrc.gov) Columbia Site Secretary (Crystal.Myers@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) Regional Counsel (Karla.Fuller@nrc.gov ) Congressional Affairs Officer (Jenny.Weil@nrc.gov ) OEMail Resource

CDBI Team Lead (Ronald.Kopriva@nrc.gov

NRR CDBI Coordinator (Donald.Norkin@nrc.gov )

SUNSI Review Completed: ___Yes ___No ADAMS: ___Yes ___ No Initials: ______

___ Publicly Available ___ Non-Publicly Available ___ Sensitive ___ Non-Sensitive

S:DRS/Reports/WT3 CDBI RFI RAK ML RIV:SRI:DRS/EB1 BC/EB1 RKopriva TFarnholtz

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 - Enclosure INFORMATION REQUEST FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 COMPONENT DESIGN BASES (CDBI) INSPECTION

Inspection Report: 05000382/2009009

Information Gathering Dates: August 3-7, 2009

On-site Inspection Dates: August 24-28, 2009 and September 8-18, 2009

Inspection Procedure: IP 71111.21, "Component Design Bases Inspection" Lead Inspector/Team Leader: Ronald A. Kopriva 817-860-8104 Ron.kopriva@nrc.gov

I. Information Requested Prior to the information Gathering Visit July 29, 2009.

The following information (Section I of this enclosure) should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of Ronald A. Kopriva, by July 22, 2009 to facilitate the reduction in the items to be selected for a final

list during the preparation week of August 17, 2009. The inspection team will finalize the selected list during the prep week using the additional documents requested in Section II of this enclosure. The specific items selected from the lists shall be available and ready for review on the day indicated in this request. *Please provide requested documentation electronically in "pdf" files, Excel, or other searchable formats, if possible. The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of pressurized water reactor technology. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of

the onsite inspection.

1. An excel spreadsheet of equipment basic events (with definitions) including importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your internal events probabilistic risk assessment (PRA).

Include basic events with RAW value of 1.3 or greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA "system notebooks," and the latest PRA summary document.

4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV. Provide copies of your human reliability worksheets for these items.

5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire.

- 2 - Enclosure 6. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.).

7. List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment.

8. A list of operating experience evaluations for the last 2 years.

9. A list of all time-critical operator actions in procedures.

10. A list of permanent and temporary modifications sorted by component identified in Item 1.

11. List of current "operator work arounds/burdens." 12. A list of the design calculations, which provide the design margin information for components included in Item 1. (Calculations should be available during the information gathering visit).

13. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years.

14. Current management and engineering organizational charts.

15. Waterford Steam Electric Station, Unit 3 IPEEE, if available electronically.

16. Mechanical piping drawings for:

Engineered safety features Emergency core cooling systems Emergency diesel generators

17 Electrical one-line drawings for:

Offsite power/switchyard supplies Normal AC power systems

Emergency AC/DC power systems including 120VAC power, and 125VDC/24VDC safety class systems

18. List of any common-cause failures of components in the last 3 years.

19. An electronic copy of the Design Bases Documents.

20. An electronic copy of the System Health notebooks.

- 3 - Enclosure II. Information Requested to be Available on First Day of Preparation Week (August 24, 2009)

1. List of condition reports (corrective action documents) associated with each of the selected components for the last 5 years.

2. The corrective maintenance history associated with each of the selected components for the last 2 years.

3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of reference material (such as drawings, engineering requests, and vendor letters).

4. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable.

5. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.

6. Copies of any open temporary modifications associated with each of the selected components, if applicable.

7. Trend data on the selected electrical/mechanical components' performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable).

8. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.

9. A copy of engineering/operations related audits completed in the last 2 years.

10. List of motor operated valves (MOVs) in the program, design margin and risk ranking. 11. List of air operated valves (AOVs) in the valve program, design and risk ranking.

12. Structure, system and components in the Maintenance Rule (a)(1) category.

13. Site top 10 issues list.

14. Procedures used to accomplish operator actions associated with the basic events in your PRA.

15. List of licensee contacts for the inspection team with pager or phone numbers.

- 4 - Enclosure

III. Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

3. Reference materials (available electronically and as needed during all onsite weeks): General set of plant drawings IPE/PRA report Procurement documents for components selected Plant procedures (normal, abnormal, emergency, surveillance, etc.) Technical Specifications

Updated Final Safety Analysis Report Vendor manuals

Inspector Contact Information

Ronald A. Kopriva Senior Reactor Inspector (817) 860-8104 Ron.kopriva@nrc.gov

Mailing Address

US NRC, Region IV Attn: Ronald A. Kopriva 612 East Lamar Blvd, Ste 400

Arlington, TX 76011