Er 05000482/2015301; 11/13/2015 - 12/29/2015; Wolf Creek Generating Station; Initial Operator Licensing Examination Report
ML16028A151
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/28/2016
From: Vincent Gaddy
Operations Branch IV
To: Heflin A C
Wolf Creek
References
50-482/15-301
Download: ML16028A151 (13)


Text

January 28, 2016

Adam C. Heflin, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2015301

Dear Mr. Heflin:

On November 23, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Wolf Creek Generating Station. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 19, 2015, with you and other members of your staff. A telephonic exit meeting was conducted on December 29, 2015, with Mr. J. Knapp, Superintendent, Operations Training, who wa s provided the NRC licensing decisions.

The examination included the evaluation of 8 applicants for reactor operator licenses and 7 applicants for an instant senior reactor operator license. The license examiners determined that 14 applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. However, 2 reactor operator applicants and 1 instant senior reactor operator applicant had the issuance of their license delayed until any written examination appeal can be reviewed for possible impact on their licensing decision in accordance with NUREG-1021, Revision 10, ES-501, Section D.3.c. There were no post-examination comments submitted by your staff. Enclosure 1 contains details of this report and Enclosure 2 documents one observed simulator fidelity issue.

No findings were identified during this examination.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-482 License No. NPF-42

Enclosures: 1. Examination Report 05000482/2013301 w/Attachment: Supplemental Information

2. Simulator Fidelity Report

cc: Electronic Distribution for Wolf Creek

Generating Station

ML16028A151 SUNSI Review By: BTL ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE OE:OB OE:OB SOE:OB RE:IOLB SOE:OB C:PBB C:OB NAME CCowdrey SHedger JKirkland TBuchanan BLarson NTaylor VGaddy SIGNATURE Email Email Email Email /RA/ /RA/ /RA/ DATE 1/27/16 1/27/16 1/27/16 1/27/16 1/27/16 1/27/16 1/28/16 Letter Adam from Vincent G. Gaddy, dated January 28, 2016

SUBJECT: WOLF CREEK GENERATING STATION - NRC EXAMINATION REPORT 05000482/2015301

Electronic Distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Douglas.Dodson@nrc.gov)

Resident Inspector (Fabian.Thomas@nrc.gov)

WC Administrative Assistant (Vacant)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Shawn.Money@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEWEB Resource (OEWEB Resource@nrc.gov) OEWEB Resource (Sue.Bogle@nrc.gov) RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket: 05000482 License: NPF-42 Report: 05000482/2015301 Licensee: Wolf Creek Nuclear Operating Corporation Facility Wolf Creek Generating Station Location: 1550 Oxen Lane NE Burlington, Kansas Dates: November 13 - December 29, 2015 Inspectors: B. Larson, Senior Operations Engineer J. Kirkland, Senior Operations Engineer

T. Buchanan, Reactor Engineer S. Hedger, Operations Engineer C. Cowdrey, Operations Engineer Approved By: Vincent G. Gaddy Chief, Operations Branch Division of Reactor Safety

SUMMARY

ER 05000482/2015301; 11/13/2015 - 12/29/2015; Wolf Creek Generating Station; Initial

Operator Licensing Examination Report.

NRC examiners evaluated the competency of eight applicants for reactor operator licenses and seven applicants for an instant senior reactor operator license at Wolf Creek Generating Station.

The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The written examination was administered by the licensee on November 13, 2015. The NRC examiners administered the operating tests November 16-23, 2015.

The examiners determined that 14 of the 15 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. However, 2 reactor operator applicants and 1 instant senior reactor operator applicant had the issuance of their license delayed until any written examination appeal can be reviewed for possible impact on their licensing decision in accordance with NUREG-1021, Revision 10, ES-501, Section D.3.c.

A. NRC-Identified and Self-Revealing Findings

None

B. Licensee-Identified Violations

None

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA5 Other Activities (Initial Operator License Examination)

.1 License Applications

a. Scope

NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited four of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.

b. Findings

No findings were identified.

.2 Examination Development

a. Scope

NRC examiners reviewed integrated examination outlines and proposed examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.

b. Findings

No findings were identified.

NRC examiners provided outline, proposed ex amination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.

For the written examinations initially submitted by the licensee, NRC examiners determined that the reactor operator (RO) written examination was within the range of acceptability expected for a proposed examination but the senior reactor operator-only (SRO-only) portion of the written examination was not within the range of acceptability expected for a proposed examination.

The NUREG-1021 standard for an acceptable submittal requires that 20 percent or fewer of questions submitted for the RO and SRO-only written examinations (assessed separately) require replacement or significant modification. For this submittal, the SRO-only portion of the examination contained 8 questions (32 percent) that required replacement or significant modifications. The major issue was questions that did not match the selected knowledge and ability statement; other errors included questions not written at an SRO-only level, two or more distracters that were not credible and questions that had multiple correct answers. As identified in NUREG-1021, future written examination submittals should incorporate any lessons learned stemming from this examination effort. The licensee wrote Condition Report 00102279 to address

these issues.

NRC examiners determined the operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.

.3 Operator Knowledge and Performance

a. Scope

On November 13, 2015, the licensee proctored the administration of the written examinations to all 15 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on December 1, 2015.

The NRC examination team administered the various portions of the operating tests to all 15 applicants on November 16-23, 2015.

b. Findings

No findings were identified.

All 15 applicants passed all portions of the operating test. Fourteen of the 15 applicants passed the written examination. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments submitted by the licensee. The licensee requested and received approval by the NRC to withhold the written examinations from the public document room for 24 months after the administration date.

The examination team noted a generic weakness during the administration of the job performance measure associated with the ability to develop a Protective Action Recommendation. Seven out of seven instant senior reactor operator applicants failed to complete one or more portions of the emergency notification form correctly and within the established time limit. The licensee wrote Condition Report 00102021 to address

this issue.

.4 Simulation Facility Performance

a. Scope

The NRC examiners observed simulator performanc e with regard to plant fidelity during examination validation and administration.

b. Findings

No findings were identified.

During the performance of one simulator job performance measure, NRC examiners observed a possible simulator hardware issue. While performing actions to restore power to a vital bus following a loss of all ac power, the normal feeder breaker NB HIS-4 failed to close, tripping on the attempt. With the assistance of a simulator engineer, a fix was identified and administration of the operating test continued with minimal delay. It is noted that during NRC validation of the operating test, this job performance measure was performed as scripted. See Enclosure 2 for additional details.

.5 Examination Security

a. Scope

The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.

b. Findings

No findings were identified.

During administration of the operating test scenarios, the examiners were informed of three issues affecting examination integrity. Because none of the issues resulted in replacing or modifying any test items, the issues were evaluated as not more than minor, but are identified here per guidance in NUREG-1021, ES-501, Section E.3.a.

Issue 1: Scenario #1: A book containing several abnormal (off-normal)procedures was not updated after the first scenario run but was returned to the simulator for use in subsequent runs. As a result, one BOP applicant discovered one event procedure was missing and in subsequent event, the same BOP applicant discovered a procedure that had place-keeping marks from the previous scenario run. NRC examiners determined the impact as minor since a replacement procedure was readily available to the BOP applicant and the place-keeping marks offered no discernable advantage to the applicant. The licensee wrote Condition Report 00101585 to address this issue.

Issue 2: Scenario #3: A cue was given by the booth operator to the CRS applicant without prior concurrence of the lead examiner. The cue was inappropriately given prior to the CRS applicant identifying that a load reduction was required. However, NRC examiners determined the impact as minor since the applicant had multiple other opportunities to be evaluated in the Directing Operations competency. The licensee wrote Condition Report 00101586 to address this issue.

Issue 3: Scenario #2: A laminated copy of EMG E-0, REACTOR TRIP OR SAFETY INJECTION, Foldout Page, grease pencil markings were not wiped clean between the 2 nd and 3 rd applicant crews. NRC examiners determined the impact as minor since the grease pencil markings offered no discernable advantage to the applicant who identified the markings. The licensee wrote Condition Report 00101587 to address this issue. In addition, the licensee wrote Condition Report 00101655, Trending CR for OPS Exam Security Issues, to track corrective actions for an adverse Operations examination security trend.

4OA6 Meetings, Including Exit

Exit Meeting Summary

The chief examiner presented the preliminary examination results to Mr. A. Heflin, President and Chief Executive Officer, and other members of his staff on November 19, 2015. A telephonic exit meeting was conducted on December 29, 2015, between Mr. B. Larson, Chief Examiner, and Mr. J. Knapp, Superintendent, Operations Training.

All proprietary information and materials used during the examination were returned to the

licensee.

A-1 Attachment

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Yunk, Manager, Training
W. Brandt, Exam Licensing Representative
J. Knapp, Superintendent, Operations Training
R. Meyer, Supervisor, Simulator and Exam Group
M. Mitchell, Exam Group
A. Servaes, Exam Group
W. Isom, Licensed Supervisor Instructor, Initial
L. Rockers, Licensing Engineer

NRC Personnel

D. Dodson, Senior Resident Inspector
F. Thomas, Resident Inspector

ADAMS DOCUMENTS REFERENCED

Accession No. ML16027A319 - [DO NOT RELEASE FOR TWO YEARS]

WC-2015-11-Final
Written Exams Accession No. ML16027A312 -
WC-2015-11-Final Operating Test
Accession No. ML16027A300 -
WC-2015-11-Post Exam Analysis
Attachment
ES-501 Simulator Fidelity Report Enclosure 2
Facility Licensee: __Wolf Creek Generating Station__
Facility Docket No.: __50-482__
Operating Tests Administered on: __November 16-23, 2015__
This form is to be used only to report observations.
These observations do not constitute audit or inspection findings and, without further verification and review in accordance with
IP 71111.11, are not indicative of noncompliance with 10
CFR 55.46, "Simulation Facilities."
No licensee action is required in response to these observations.
While conducting the simulator portion of the operating tests, examiners observed the following item:
Item Description SMP A16-008 NRC initial license examination administration (week of November 16, 2015):
During performance of Job Performance Measure (JPM) S5, it was observed that normal feeder breaker NB
HIS-4 failed to close

(tripping on the attempt) while performing actions to restore power to a dead vital bus following a loss of all AC power condition.

For JPM S5, the simulator setup was
IC 315 (see JPM for details).
Since the simulator performed without issue during NRC validation of this JPM, a possible hardware issue is suspected.