Edwin I. Hatch Nuclear Plant - Notification of Inspection and Request for Information
ML060120021
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/11/2006
From: Lesser M S
NRC/RGN-II/DRS/EB3
To: Sumner H L
Southern Nuclear Operating Co
References
Download: ML060120021 (6)


Text

January 11, 2006Southern Nuclear Operating Company, Inc.ATTN:Mr. H. L. Sumner, Jr.Vice President - Hatch ProjectP. O. Box 1295 Birmingham, AL 35201-1295

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - NOTIFICATION OF INSPECTION ANDREQUEST FOR INFORMATION

Dear Mr. Sumner:

On February 21, 2006, the NRC will begin the baseline inservice inspection (NRC Procedure71111.08) at the Hatch Station Unit 1. Experience has shown that this inspection is resource intensive both for the NRC inspectorsand your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all ofthese documents are up to date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.We have discussed the schedule for these inspection activities with George Fechter of yourstaff via telephone conversation on January 10, 2006. If there are any questions about this inspection or the material requested, please contact the lead inspector Justin Fuller at (404) 562-4655.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC'sdocument system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/Mark S. Lesser, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-321, 50-366License Nos. DPR-57, NPF-5

Enclosure:

See next page 2SNC

Enclosure:

INSERVICE INSPECTION DOCUMENT REQUESTcc w/encl:J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionGeorge R. FrederickGeneral Manager, Plant Hatch Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionRaymond D. BakerManager Licensing - Hatch Southern Nuclear Operating Company, Inc.

Electronic Mail DistributionArthur H. Domby, Esq.Troutman Sanders Electronic Mail DistributionLaurence BergenOglethorpe Power Corporatioln Electronic Mail DistributionBentina C. TerrySouthern Nuclear Operating Company, Inc.

Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295DirectorDepartment of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334Manager, Radioactive Materials ProgramDepartment of Natural Resources Electronic Mail DistributionChairmanAppling County Commissioners 69 Tippins St., Suite 201 Baxley, GA 31513Resident ManagerOglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Electronic Mail DistributionSenior Engineer - Power SupplyMunicipal Electric Authority of Georgia Electronic Mail DistributionReece McAlisterExecutive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334

_________________________OFFICERII:DRSRII:DRSRII:DRPSIGNATURE/RA//RA//RA/NAMEJFuller:pmdMLesserMWidmannDATE1/11/061/11/061/11/06 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO INSERVICE INSPECTION DOCUMENT REQUESTInspection Dates:February 21, 2006 through February 24, 2006Inspection Procedures:IP 7111108 "Inservice Inspection Activities" Inspector:Justin Fuller (404) 562-4655A.Information Requested for the In-Office Preparation WeekThe following information should be sent to the Region II office in hard copy (orelectronic format CD - preferred), in care of Mr. Fuller by February 13, 2006, to facilitatethe selection of specific items that will be reviewed during the onsite inspection week.

The inspector will select specific items from the information requested below andrequest a list of additional documents needed on-site from your staff. This second request (Section B) is often not requested by the inspectors until they arrive on site. All information requests relate to Unit 1 unless otherwise stated. If you have any questions regarding this information, please call the inspector as soon as possible.1)A detailed schedule of :Nondestructive examinations (NDE) planned for Class 1 & 2 systems and containment,performed as part of your ASME Code ISI Program during the upcoming outage.

Please include FAC exams. 2)A copy of the NDE procedures used to perform the examinations identified in A.1(including calibration and flaw characterization/sizing procedures). A copy of your NDE written practice and welding program. For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, providedocumentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers). IF THESE DOCUMENTS ARE NOT AVAILABLE IN ELECTRONICFORMAT, THEN PLEASE PROVIDE DURING THE INSPECTION WEEK. 3)A copy of:a) ASME Section XI, Code Relief Requests applicable to the examinations identified inA(1).4)A list identifying NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,visual (VT-1, VT-2, VT-3)) which have identified recordable indications on Code Class 1

& 2 systems since the beginning of the last refueling outage. 5)List with short description of the welds in Code Class 1 and 2 systems whic h have beenfabricated due to component repair/replacement activities since the beginning of the last refueling outage or are planned to be fabricated this outage, and identify t he system,weld number and reference applicable documentation.

26)If reactor vessel weld examinations required by the ASME Code or BWRVIPcommitments are scheduled to occur during the outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. 7)List with description of ISI related issues (e.g. list based upon data base searches usingkey words related to piping, ASME Code, cracks, wear, thinning, leakage, rust, corrosion,BWRVIP, welding, etc.) entered into your corrective action system since the beginning ofthe last refueling outage (both Units).8)Copy of any 10 CFR Part 21 reports applicable to your structures systems orcomponents within the scope of Section XI of the ASME Code, that have been identifiedsince the beginning of the last refueling outage.9)Please also provide a copy of your most current revision of the ISI Program Manual andPlan for this Interval. IF THESE DOCUMENTS ARE NOT AVAILABLE IN ELECTRONICFORMAT, THEN PLEASE PROVIDE DURING THE INSPECTION WEEK. 10)List of any temporary non-code repairs in service.

11)List of known locations that have pin-hole leaks, ASME Class 1, 2, 3.

12)Documentation that demonstrates how you are meeting all BWRVIP guidancedocuments or documentation that supports deviation from guidelines.13)Please provide names and numbers for the following program leads:ISI contacts (Examination, planning)Containment Exams Snubbers and Supports Repair and Replacement program manager Site Welding Engineer Licensing contacts BWRVIPB.Information to be provided on-site to the inspector at the entrance meeting(February 21, 2005):1)For welds selected by the inspector from A.5 above, provide copies of the followingdocuments:a)Document of the weld number and location (e.g., system, train, branch);b)Document with a detail of the weld construction; c)Applicable Code Edition and Addenda for weldment; d)Applicable Code Edition and Addenda for welding procedures; e)Applicable weld procedures (WPS) used to fabricate the welds; f)Copies of procedure qualification records (PQRs) supporting the WPS onselected welds;g)Copies of mechanical test reports identified in the PQRs above; 3h)Copies of the nonconformance reports for the selected welds;i)Radiographs of the selected welds and access to equipment to allow viewingradiographs; andj)Copies of the preservice examination records for the selected welds.2)For the ISI related corrective action issues selected by the inspector from A.7 above,provide a copy of the corrective actions and supporting documentation.3)For the nondestructive examination reports with relevant indications on Code Class 1 &2 systems selected by the inspector from A.4 above, provide a copy of the examinationrecords and associated corrective action documents.4)Updated schedules for item A.1 (including schedule showing contingency repair plans ifavailable).5)Ready access to the Editions of the ASME Code (Sections III, V, IX and XI) applicableto the inservice inspection program and the repair/replacement program. (e.g. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location).Inspector Contact Information:Justin D. FullerNRC Region 2 - Reactor Inspector Metallurgical Engineer 404-562-4655 (office)

JDF@nrc.govMailing AddressUS NRC Region 2 Attn: Justin Fuller 61 Forsyth Street, SW Atlanta, GA 30303 Suite 23T84