Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 11 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 1 (ALL)
Title START A RECIRC ADJUSTABLE SPEED DRIVE (ASD) FROM THE CONTROL ROOM Author:
Anthony Ball Media Number:
CR-SIM 1 2015-301 Time 15.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Supervisor, Lead Instructor or Line Supervisor)
Date
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 11 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 1 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 16 02/22/02 Include initial Operator statement RAB RAB 17 05/03/02 Revise Simulator Setup DNM DHG 18 03/01/05 Deleted S from procedure numbers, changed Revision and Rev. numbers to Current Version, changed Reactor Operator to Nuclear Plant Operator, changed IC 121 to IC 127 for Simulator Setup, added new prompts, changed location of some steps and prompts.
BEB DHG 19 05/27/05 Revised Initial License statement for successful completion RAB RAB 20 03/30/06 Remove Response Cues RAB RAB 21 01/06/09 This revision is meant for initial training prior to implementation of ASDs on U2 during the 2009 U2 outage. It is the intent of Training & Operations to perform the best training possible gathering feedback from Operators during the process & feeding this information back to Operations prior to implementation to improve procedures prior to final implementation. (Note:
originally a new JPM 04.20 was written, however this JPM was revised to modify the task and TO for the equipment and JPM 04.20 not retained). Section for Unit One will be simulate in Main Control Room due to modification on simulator to reflect changes to Unit 2.
DNM CEB RAB 21.1 10/11/09 Revised for use on 2009-302 Exam FNF CME 21.2 Minor revision to match procedure and use on ILT-09 NRC Exam. Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to CR-Sim 1 and deleted Fundamental Review Question. Both will be added back to become new LR-JP-13.53-14.3 after NRC Exam.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 11 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors 14.1 MMG
CR-SIM 1 2015-301 Page 4 of 11 UNIT 1
()
UNIT 2 (X)
TASK TITLE:
START A RECIRC ADJUSTABLE SPEED DRIVE (ASD) FROM THE CONTROL ROOM JPM NUMBER:
CR-SIM 1 2015-301 TASK STANDARD:
The task shall be completed when the Adjustable Speed Drive (ASD) has been started and then secured.
TASK NUMBER:
004.002 OBJECTIVE NUMBER: 004.002.A, 004.002.E PLANT HATCH JTA IMPORTANCE RATING:
RO 3.50 SRO 3.22 K/A CATALOG NUMBER: 202001K6.02 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.1 SRO 3.2 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 34SO-B31-001-2 (current version) 34AB-B31-001-2 (current version)
REQUIRED MATERIALS:
Unit 2 34SO-B31-001-2 (current version) marked up to step 7.1.3.1.11 APPROXIMATE COMPLETION TIME: 15.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
SIMULATOR SETUP Simulator Initial Conditions:
1.
RESET the Simulator to IC #102 and leave in FREEZE.
2.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Secure both Recirc Pumps and Close their Discharge valves B. Raise RWL to >47 inches as indicated on GEMAC.
C. Use rfB31_29 and open Seal purge valve B31-F016A.
D. Open Reactor Recirc Pump Suction Valves, 2B31-F023A and 2B31-F023B.
E. Start up the 2A Recirc ASD up to step 7.1.3.1.10, with the breaker closed for the ASD, the ASD START pushbutton lit, and RWL > 32.
F.
Have a Marked up copy of 34SO-B31-001-2, Recirc system, marked up to step 7.1.3.1.10, G. Turn OFF the SPDS screens.
H. Acknowledge/Reset annunciators 3.
INSERT the following Event Trigger:
ET #
Description EGB31-1 Inserts the following alarms when F031A is fully open (Green light goes out):
- ASD A - Cooling Normal (White Light Off)
- ASD A Cooling Trouble (Annunciator On)
- + 2 seconds - ASD A Cooling Fault (Annunciator On)
- + 10 seconds - ASD A Fatal Fault (Annunciator On)
Event Trigger Contents:
- Activate ET B31-1 when 2A Recirc pump discharge valve is full open (green light out) loB31-F031AG1.algToPanel =0
- THEN (SCN Portion of ET)
IOR loB31-DS42AW1 f:0 d:0; ASD A - Cooling Normal (White Light Off)
IMF mf60211169 f:1 d:0; ASD A Cooling Trouble (Annunciator On)
+2IMF mf60211170 f:1 d:0; ASD A Cooling Fault (Annunciator On)
+10IMF mf60211146 f:1 d:0; ASD A Fatal Fault (Annunciator On) 4.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
5.
ESTIMATED Simulator SETUP TIME:
15 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
1.
Unit 2 is in cold shutdown 2.
SPDS is Out of Service and being worked.
3.
A Recirc Pump is required for forced circulation.
4.
CRD seal purge is in service with 1.9 gpm flow to the A seals.
5.
Maintenance has performed all applicable sections for venting/purging of the A Recirc Pump seals IAW 52CM-B31-003-0.
6.
34SO-B31-001-2, Recirc system, is complete up to step 7.1.3.1.10.
7.
34SO-B31-001-2 Attachment 5 Recirc Pump Startup Prerequisites was just completed and is SAT for a start of the A Recirc Pump.
INITIATING CUES:
Start 2A Recirc Pump IAW 34SO-B31-001-2, Reactor Recirculation System, Section 7.1.3., starting at step 7.1.3.1.10.
CR-SIM 1 2015-301 Page 7 of 11 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
NOTE:
Unless otherwise indicated, all actions are carried out at panel 2H11-P601.
PROMPT:
Once the applicant has identified the correct procedure, PROVIDE the applicant with a copy of 34SO-B31-001-2, Recirc system, marked up to step 7.1.3.1.10,
- 1. Operator obtains procedure and reviews the procedures precautions and limitations.
Operator has obtained 34SO-B31-001-2 and reviewed the precautions and limitations.
NOTE:
RWL indication on 2H11-P603 is not corrected. The operator must subtract 15 inches from the indicated RWL. Therefore RWL is required to be above 47 inches (32 + 15 = 47).
- 2. Confirm RWL is greater than +32 inches.
At panel 2H11-P603, the Operator VERIFIES that RWL is greater than +32 inches actual level (> 47 inches indicated).
PROMPT:
IF addressed by the Operator, INFORM the Operator that Attachment 5 was complete and acceptable within the last 15 minutes.
IF THEN PASS
Human performance tools, safety, PPE met (1), AND
For initial trg all steps completed correctly OR
For continuing trg, critical steps (if used) completed correctly
Above standards not met
Mark the JPM as a FAIL
CR-SIM 1 2015-301 Page 8 of 11 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
- 3. Confirm/Close Reactor Recirc Pump Discharge Valve, 2B31-F031A.
Operator confirms PUMP DISCH VLV 2B31-F031A is CLOSED, green light illuminated.
- 4. Confirm ASD A START pushbutton indicating lamp is illuminated.
Operator confirms ASD A START pushbutton indicating lamp is illuminated
- 5. Visually Confirm the ASD A startup temperature limits are still acceptable.
Operator confirms the ASD A startup temperature limits are still acceptable by observing temperatures on 2B31-R601 at Panel 2H11-P614.
NOTE:
The above step may not be performed, since the Initiating Cue states that Attachment 5 (checking startup temperatures) has just been performed and all temperatures are acceptable.
PROMPT: Once the applicant has identified the 2B31-R601 recorder, INFORM the applicant that all temperatures are acceptable.
- 6. DEPRESS the ASD A START pushbutton.
Operator depresses ASD A START PUSH BUTTON.
- 7. Confirm the following:
Operator confirms the following:
The ASD A STARTING light illuminates The ASD A STARTING light illuminates.
The ASD A START light extinguishes.
The ASD A START light extinguishes.
2B31-F031A, Recirc Pump A Disch Vlv, starts to JOG OPEN 2 seconds after the ASD A STARTING light illuminates.
2B31-F031A, Recirc Pump A Disch Vlv, starts to JOG OPEN 2 seconds after the ASD A STARTING light illuminates.
The ASD A speed increases to
~370 RPM on 2B31-R660A and
~22% on 2B31-R661A in about 4 seconds.
The ASD A speed increases to
~370 RPM on 2B31-R660A and ~22% on 2B31-R661A in about 4 seconds.
The ASD A RUNNING light illuminates.
The ASD A RUNNING light illuminates.
The ASD A STARTING light The ASD A STARTING light
CR-SIM 1 2015-301 Page 9 of 11 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step) extinguishes.
extinguishes.
2B31-F031A, Recirc Pump A Disch Vlv, is FULL OPEN <96 seconds after the Recirc ASD A STARTING light illuminates.
2B31-F031A, Recirc Pump A Disch Vlv, is FULL OPEN
<96 seconds after the Recirc ASD A STARTING light illuminates.
Recirc A Flow, indicates 11,000 -
13,000 GPM on 2B31-R617.
Recirc A Flow, indicates 11,000 - 13,000 GPM on 2B31-R617.
Acknowledge expected alarms Acknowledges expected alarm 602-227, Recirc Loop B Out Of Service PROMPT: WHEN the operator addresses Attachment 5, INFORM the operator that another operator will complete Attachment 5.
NOTE:
This step may not be done due to the cooling and fault alarms coming in on the ASD.)
- 8. Complete remainder of Attachment 5.
Operator has verified Attachment 5 will be completed.
NOTE This is where the ALTERNATE PATH starts.
Simulator Operator Confirm Event Trigger EGB31-1 ACTIVATES when the green light extinguishes on 2B31-F031A.
NOTE:
The following cooling fault automatically occurs based on 2B31-F031A being full open.
- 9. Respond to annunciators:
602-125 ASD A Cooling Trouble 602-126 ASD A Cooling Fault 602-102 ASD A FATAL FAULT Operator places the ASD A control switch to the STOP position OR DEPRESSES the ASD A Shutdown pushbutton within 5 minutes of receiving the alarms.
END TIME:__________
NOTE: The terminating cue shall be given to the Operator when:
CR-SIM 1 2015-301 Page 10 of 11 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
(** Indicates critical step)
With NO reasonable progress, the Operator exceeds double the allotted time.
Operator has tripped or shutdown ASD A.
TERMINATING CUE: We will stop here.
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
1.
Unit 2 is in cold shutdown 2.
SPDS is Out of Service and being worked.
3.
A Recirc Pump is required for forced circulation.
4.
CRD seal purge is in service with 1.9 gpm flow to the A seals.
5.
Maintenance has performed all applicable sections for venting/purging of the A Recirc Pump seals IAW 52CM-B31-003-0.
6.
34SO-B31-001-2, Recirc system, is complete up to step 7.1.3.1.10.
7.
34SO-B31-001-2 Attachment 5 Recirc Pump Startup Prerequisites was just completed and is SAT for a start of the A Recirc Pump.
INITIATING CUES:
Start 2A Recirc Pump IAW 34SO-B31-001-2, Reactor Recirculation System, Section 7.1.3., starting at step 7.1.3.1.10.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 20 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 2 (ALL)
Title LOWER RWL USING THE RHR SYSTEM (ALTERNATE PATH)
Author:
Anthony Ball Media Number:
CR-SIM 2 2015-301 Time 18.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 20 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 2 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 01 07/31/90 General revision and format change JEM DHG 02 06/04/91 Procedure revision JEM DHG 03 08/26/92 General revision and format change WMM SCB 04 08/01/96 General revision, format change, change simulator setup, word processor change RAB DHG 05 01/18/99 Revised malfunction numbers due to new simulator computer.
SCB DHG 06 02/03/00 Format modification, modify title, change time allowance based on running average RAB DHG 07 10/31/00 Include objective number RAB DHG 08 01/03/02 Minor correction (shift from PEO to SO)
RLS DHG 09 02/26/02 Include initial opertor statement RAB RAB 10 02/24/05 Deleted S from procedure numbers, changed Revision and Rev. numbers to Current Version, changed Reactor Operator to Nuclear Plant Operator, changed IC #131 for Simulator Setup, added 1E11-F028A(B) and 2E11-F028A(B) to step #2 for U1 and U2 JPMs due to valves listed in procedure.
BEB DHG 11 05/31/05 Revised Initial License statement for successful completion RAB RAB 12 04/05/06 Remove Response Cues RAB RAB 12.1 03/10/2015 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to Sim 5 and deleted Fundamental Review Question.
Both will be added back to become new LR-JP-06.11 (New Media Number) after NRC Exam.
ARB ELJ
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 20 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors
CR-SIM 2 2015-301 Page 4 of 20 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
LOWER RWL USING THE RHR SYSTEM (ALTERNATE PATH)
JPM NUMBER:
CR-SIM 2 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 31EO-EOP-106, Section 3.0, have been correctly performed to lower RWL.
TASK NUMBER:
006.011 OBJECTIVE NUMBER: 006.011.O PLANT HATCH JTA IMPORTANCE RATING:
RO 3.22 SRO 3.00 K/A CATALOG NUMBER: 295031EA101 K/A CATALOG JTA IMPORTANCE RATING:
RO 4.40 SRO 4.40 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 Unit 2 31EO-EOP-106-1 (current version) 31EO-EOP-016-1 (current version)
EOP Graph 4 (Maximum Core Uncovery Time Limit) 31EO-EOP-106-2 (current version) 31EO-EOP-016-2 (current version)
EOP Graph 4 (Maximum Core Uncovery Time Limit)
REQUIRED MATERIALS:
Unit 1 Unit 2 31EO-EOP-106-1 (current version)
EOP Graph Book 31EO-EOP-106-2 (current version)
EOP Graph Book APPROXIMATE COMPLETION TIME: 18.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
CR-SIM 2 2015-301 Page 5 of 20 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #131 or SNAP 612 and leave in FREEZE.
- 2.
ACTIVATE THE FOLLOWING EVENT TRIGGERS:
Trigger #
DESCRIPTION CONDITIONS Expert Command EGE11-24 2E11-C001B fails to work, but C001D will work, Use with EGE11-25.
EGE11-25 2E11-C001D fails to work, but C001B will work, Use with EGE11-24.
- 3.
INSERT the following MALFUNCTIONS:
Activator MALF #
TITLE FINAL VALUE RAMP RATE DELAY NONE
- 4.
INSERT the following OVERRIDES:
Activator TAG #
S/M/L DESCRIPTION Final Value Ramp Rate Delay ST-0 diE11-C002B S
RHR Pump 2B 1
1000 ST-0 diE11-C002D S
RHR Pump 2D 1
1000
- 5.
INSERT the following REMOTE FUNCTIONS:
Activator REM #
DESCRIPTION Final Value STATUS RB-1 rfE11_282 2E11-F028A/B Intk with F006A/C 1
ORIDE RB-2 rfE11_135 E11-F010 Breaker Rackout 0
RACKED IN
CR-SIM 2 2015-301 Page 6 of 20
- 6.
INSERT the following ORS OVERRIDES:
Activator TAG #
S/M/L DESCRIPTION Final Value Ramp Rate Delay ST-0 aoB21-R605 P
Reactor Level (0 - 400) 0 1000 0
ST-0 aoC32-R655 L
Reactor Level (0 - 200) 200 1000 0
- 7.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Take RHR out of shutdown cooling and close 2E11-F008 and 2E11-F009.
B. Close MSIVs, HPCI, RCIC isolations and open seven ADS valves. Start CS and RHR to flood the Reactor.
C. When R655 is UPSCALE, stop all ECCS.
D. Acknowledge all annunciators.
- 8.
PLACE the Simulator in FREEZE until the crew assumes the shift.
- 9.
ESTIMATED Simulator SETUP TIME:
20 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
An event has occurred on Unit 2 and Reactor flooding has been performed.
- 2.
Conditions have been satisfied for terminating injection and restoring RWL indication.
- 3.
31EO-EOP-016-2, (CP-2), is in progress.
INITIATING CUES:
Lower RWL with Loop B, of RHR System using 31EO-EOP-106-2.
CR-SIM 2 2015-301 Page 8 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
NOTE: If the operator starts first with the RHR pump 2B, perform Steps 1 - 19.
If the operator starts first with the RHR pump 2D, perform Steps 20 - 38.
PROMPT:
IF the operator addresses which RHR loop is to be used, as the Shift Supervisor, INFORM the operator that the RHR Loop B should be used.
- 1. Confirm Stopped RHR Loop B pumps (step 3.17).
At panel 2H11-P601, RHR PUMP, 2E11-C002B and D are stopped, GREEN light illuminated.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
CR-SIM 2 2015-301 Page 9 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 2. Confirm/Close the following valves (step 3.18):
2E11-F004B 2E11-F017B 2E11-F075B 2E11-F016B 2E11-F024B 2E11-F027B 2E11-F028B 2E11-F010 At panel 2H11-P601, the following valves are closed, GREEN light illuminated:
TORUS SUCTION VLV, 2E11-F004B RHR OUTBD INJ VLV, 2E11-F017B RHRSW VLV, 2E11-F075B CNMT SPRAY OUTBD VLV, 2E11-F016B FULL FLOW TEST LINE VLV, 2E11-F024B TORUS SPRAY VLV, 2E11-F027B TORUS SPRAY OR TEST VLV, TORUS SPRAY OR TEST VLV, 1E11-F028B RHR CROSSTIE VLV, 2E11-F010 NOTE: 2E11-F010 is normally closed and de-energized. If the operator indicates that this is the condition of 2E11-F010, that portion of Step 2 is acceptable.
PROMPT:
IF the operator requests the SO to verify the valve position, INFORM the operator the valve is closed.
IF the operator wants the valve energized, the Simulator operator TOGGLE RB-2 RFE11135, E11-F010 Breaker Rackout, to IN.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 10 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 3. Reset valve isolations (step 3.19).
GR ISOL RESET Switch has been momentarily placed in GR 2/5 RESET at the following panels:
Panel 2H11-P601 Panel 2H11-P602 NOTE: If the Group II isolation signal is NOT reset, then the 2E11-F008 and 2E11-F009 valves will NOT open.
At panel 2H11-P601, PLACES the control switch for SDC SUCTION VLV, 2E11-F008 to OPEN, RED light illuminated.
At panel 2H11-P602, PLACES the control switch for SDC SUCTION VLV, 2E11-F009 to OPEN, RED light illuminated.
- 6. Confirm open (step 3.21):
2E11-F003B 2E11-F047B At panel 2H11-P601,CONFIRMS the following valves are OPEN, RED light illuminated:
HX OUTLET VLV, 2E11-F003B HX INLET VLV, 2E11-F047B
- 7. Open valve 2E11-F006B (step 3.21).
At panel 2H11-P601, PLACES the control switch for SHUTDOWN COOLING VLV, 2E11-F006B to OPEN, RED light illuminated.
NOTE: Although it will NOT be necessary for the operator to override the LOCA signal or the 2/3 Core Height Interlock after RPV flooding, it is acceptable for the operator to override these logics.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 11 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 8. Place the Keylock Control Switch for 2E11-F028B to open (step 3.24).
At panel 2H11-P601, PLACES the control switch for TORUS SPRAY OR TEST VLV, 2E11-F028B, to OPEN, RED light illuminated.
- 9. By placing jumpers, open Torus Spray Or Test Vlv, 2E11-F028B (step 3.25).
Operator has CALLED the Shift Support Supervisor to INSTALL jumper NN77-NN78 at panel 2H11-P601C.
NOTE: The operator must successfully complete Steps 8 and 9 to open the valve.
NOTE: If Steps 8 and 9 were successful, have the Simulator operator TOGGLE RB-1 rfE11_282, 2E11-F028A/B Intk With F006A/C, to ORIDE to open F028B.
PROMPT:
WHEN the operator addresses the jumpers to allow opening of 2E11-F028B, as the Shift Support Supervisor, INFORM the operator that they are installed.
- 10. Confirm open 2E11-F028B (step 3.25).
At panel 2H11-P601, CONFIRMS TORUS SPRAY OR TEST VLV, 2E11-F028B is OPEN, RED light illuminated.
THE ALTERNATE PATH WILL START HERE NOTE: The first 2E11-C002B or D switch selected is failed.
Event Triggers EGE11-24 OR EGE11-25 will remove the other 2E11-C002B or D switch failure.
- 11. Start RHR pump 2B (step 3.26.1).
At panel 2H11-P601, PLACES the control switch for RHR PUMP, 2E11-C002B to START and recoginizes 2E11-C001B is NOT running, GREEN light illuminated.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 12 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 12. Responds to annunciator, RHR PUMP B TRIP, 601-202 Operator enters ARP, 601-202 and dispatches SO/Maintenance personnel to investigate the alarm.
NOTE: The operator may inform the Shift Supervisor of the pump failure at this time or may continue with placing the other RHR pump in service and then notify the Shift Supervisor. (EITHER is acceptable)
- 13. May confirm Open the following:
2E11-F008, SDC Suction Valve 2E11-F009, SDC Suction Valve 2E11-F003B, HX Outlet 2E11-F047B, HX Inlet These valves were previously confirmed at steps 4, 5, & 6.
- 14. Confirm/close the following valves (step 3.18):
2E11-F004D 2E11-F017B 2E11-F075B 2E11-F016B 2E11-F024B 2E11-F027B 2E11-F028B 2E11-F010 At panel 2H11-P601,CONFIRMS the following valves are closed, GREEN light illuminated:
TORUS SUCTION VLV, 2E11-F004D RHR OUTBD INJ VLV, 2E11-F017B RHRSW VLV, 2E11-F075B CNMT SPRAY OUTBD VLV, 2E11-F016B FULL FLOW TEST LINE VLV, 2E11-F024B TORUS SPRAY VLV, 2E11-F027B TORUS SPRAY OR TEST VLV, TORUS SPRAY OR TEST VLV, 1E11-F028B RHR CROSSTIE VLV, 2E11-F010
- 15. Open valve 2E11-F006D (step 3.21).
At panel 2H11-P601, PLACES the control switch for SHUTDOWN COOLING VLV, 2E11-F006D to OPEN, RED light illuminated.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 13 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 16. Start RHR pump 2D (step 3.26.1).
At panel 2H11-P601, PLACES the control switch for RHR PUMP, 2E11-C002D to START, RED light illuminated.
NOTE: Annunciator, RHR FLOW LOW, 601-222, will be received and then clear when RHR flow is increased.
- 17. Open/throttle open valve 2E11-F024B (step 3.26.2).
At panel 2H11-P601, PLACES the control switch for FULL FLOW TEST LINE VLV, 2E11-F024B to OPEN, RED light illuminated.
PROMPT:
AT this time, as Shift Supervisor, INFORM the operator that the Maximum Core Uncovery Time Limit has been reached and to secure pump down.
- 18. Close 2E11-F024B (step 3.27.1).
At panel 2H11-P601, PLACES the control switch for FULL FLOW TEST VLV, 2E11-F024B to CLOSED, GREEN light illuminated.
- 19. Stop RHR pump 2E11-C002D (step 3.27.2).
At panel 2H11-P601, PLACES the control switch for RHR PUMP, 2E11-C002D to STOP, GREEN light illuminated.
NOTE: GO to PROMPT after Step 36 to complete the JPM.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 14 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 20. Confirm Stopped RHR Loop B pumps (step 3.17).
At panel 2H11-P601, CONFIRMS RHR PUMP, 2E11-C002B and C002D are stopped, GREEN light illuminated.
- 21. Confirm/close the following valves (step 3.18):
2E11-F004D 2E11-F017B 2E11-F075B 2E11-F016B 2E11-F024B 2E11-F027B 2E11-F028B 2E11-F010 At panel 2H11-P601, the following valves are closed, GREEN light illuminated:
TORUS SUCTION VLV, 2E11-F004D RHR OUTBD INJ VLV, 2E11-F017(B)
RHRSW VLV, 2E11-F075B CNMT SPRAY OUTBD VLV, 2E11-F016B FULL FLOW TEST LINE VLV, 2E11-F024B TORUS SPRAY VLV, 2E11-F027B TORUS SPRAY OR TEST VLV, TORUS SPRAY OR TEST VLV, 1E11-F028B RHR CROSSTIE VLV, 2E11-F010 NOTE: 2E11-F010 is normally closed and de-energized. If the operator indicates that this is the condition of 2E11-F010, that portion of Step 2 is acceptable.
PROMPT:
IF the operator requests the SO to verify the valve position, INFORM the operator the valve is closed.
IF the operator wants the valve energized, the Simulator operator TOGGLE RB-2 RFE11_135, E11-F010 Breaker Rackout, to IN.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 15 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 22. Reset valve isolations (step 3.19).
GR ISOL RESET Switch has been momentarily placed in GR 2/5 RESET at the following panels:
Panel 2H11-P601 Panel 2H11-P602 NOTE: If the Group II isolation signal is NOT reset, then the 2E11-F008 and 2E11-F009 valves will NOT open.
At panel 2H11-P601, PLACES the control switch for SDC SUCTION VLV, 2E11-F008 to OPEN, RED light illuminated.
At panel 2H11-P602, PLACES the control switch for SDC SUCTION VLV, 2E11-F009 to OPEN, RED light illuminated.
- 25. Confirm open (step 3.21):
2E11-F003B 2E11-F047B At panel 2H11-P601, CONFIRMS the following valves are OPEN, RED light illuminated:
HX OUTLET VLV, 2E11-F003B HX INLET VLV, 2E11-F047B
- 26. Open valve 2E11-F006D (step 3.21).
At panel 2H11-P601, PLACES the control switch for SHUTDOWN COOLING VLV, 2E11-F006D to OPEN, RED light illuminated.
NOTE: Although it will NOT be necessary for the operator to override the LOCA signal or the 2/3 Core Height Interlock after RPV flooding, it is acceptable for the operator to override these logics.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 16 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 27. Place the Keylock Control Switch for 2E11-F028B to open (step 3.24).
At panel 2H11-P601, PLACES the control switch for TORUS SPRAY OR TEST VLV, 2E11-F028B, to OPEN, RED light illuminated.
- 28. By placing jumpers, open Torus Spray Or Test Vlv, 2E11-F028B (step 3.25).
Operator has CALLED the Shift Support Supervisor to INSTALL jumper NN77-NN78 at panel 2H11-P601C.
NOTE: The operator must successfully complete Steps 26 and 27 to open the valve.
NOTE: If Steps 26 and 27 were successful, have the Simulator operator TOGGLE RB-1 RFE11_282, 2E11-F028A/B Intk With F006A/C, to ORIDE to open F028B.
PROMPT:
WHEN the operator addresses the jumpers to allow opening of 2E11-F028B, as the Shift Support Supervisor, INFORM the operator that they are installed.
- 29. Confirm open 2E11-F028B (step 3.25).
At panel 2H11-P601, the operator has verified TORUS SPRAY OR TEST VLV, 2E11-F028B is OPEN, RED light illuminated.
THE ALTERNATE PATH WILL START HERE NOTE: The first 2E11-C002B or D switch selected is failed.
Event Triggers EGE11-24 OR EGE11-25 will remove the other 2E11-C002B or D switch failure.
- 30. Start RHR pump 2D (step 3.26.1).
At panel 2H11-P601, PLACES the control switch for RHR PUMP, 2E11-C002D to START and recoginizes 2E11-C002D is NOT running, GREEN light illuminated.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 17 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 31. Responds to annunciator, RHR PUMP D TRIP, 601-301.
Operator enters ARP, 601-301 and dispatches SO/Maintenance personnel to investigate the alarm.
NOTE: The operator may inform the Shift Supervisor of the pump failure at this time or may continue with placing the other RHR pump in service and then notify the Shift Supervisor. (EITHER is acceptable)
- 32. May confirm Open the following:
2E11-F008, SDC Suction Valve 2E11-F009, SDC Suction Valve 2E11-F003B, HX Outlet 2E11-F047B, HX Inlet These valves were previously confirmed at steps 22, 23, & 24.
- 33. Confirm/close the following valves (step 3.18):
2E11-F004B 2E11-F017B 2E11-F075B 2E11-F016B 2E11-F024B 2E11-F027B 2E11-F028B 2E11-F010 At panel 2H11-P601, CONFIRMS the following valves are closed, GREEN light illuminated:
TORUS SUCTION VLV, 2E11-F004B RHR OUTBD INJ VLV, 2E11-F017B RHRSW VLV, 2E11-F075B CNMT SPRAY OUTBD VLV, 2E11-F016B FULL FLOW TEST LINE VLV, 2E11-F024B TORUS SPRAY VLV, 2E11-F027B TORUS SPRAY OR TEST VLV, TORUS SPRAY OR TEST VLV, 1E11-F028B RHR CROSSTIE VLV, 2E11-F010
(** Indicates critical step)
CR-SIM 2 2015-301 Page 18 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 34. Open valve 2E11-F006B (step 3.21).
At panel 2H11-P601, PLACES the control switch for SHUTDOWN COOLING VLV, 2E11-F006B to OPEN, RED light illuminated.
- 35. Start RHR pump 2B (step 3.26.1).
At panel 2H11-P601, PLACES the control switch for RHR PUMP, 2E11-C002B to START, RED light illuminated.
NOTE: Annunciator, RHR FLOW LOW, 601-222, will be received and then clear when RHR flow is increased.
- 36. Open/throttle open valve 2E11-F024B (step 3.26.2).
At panel 2H11-P601, PLACES the control switch for FULL FLOW TEST LINE VLV, 2E11-F024B to OPEN, RED light illuminated.
PROMPT:
AT this time, as Shift Supervisor, INFORM the operator that the Maximum Core Uncovery Time Limit has been reached and to secure pump down.
- 37. Close 2E11-F024B (step 3.27.1).
At panel 2H11-P601, PLACES the control switch for FULL FLOW TEST VLV, 2E11-F024B to CLOSE, GREEN light illuminated.
- 38. Stop RHR pump 2E11-C002B (step 3.27.2).
At panel 2H11-P601, PLACES the control switch for RHR PUMP, 2E11-C002B to STOP, GREEN light illuminated.
PROMPT:
WHEN the operator addresses removing the jumpers to close the 2E11-F028B valve, as the Shift Support Supervisor, INFORM the operator that you will have someone else remove the jumpers and close the valve.
(** Indicates critical step)
CR-SIM 2 2015-301 Page 19 of 20 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
PROMPT:
IF the operator addresses System Restoration to the standby lineup, as the Shift Supervisor, INFORM the operator that it is NOT desired at this time.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
An event has occurred on Unit 2 and Reactor flooding has been performed.
- 2.
Conditions have been satisfied for terminating injection and restoring RWL indication.
- 3.
31EO-EOP-016-2, (CP-2), is in progress.
INITIATING CUES:
Lower RWL with Loop B, of RHR System using 31EO-EOP-106-2.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 12 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 3 (ALL)
Title ROLL THE MAIN TURBINE FROM 0 TO 1800 RPM (ALTERNATE PATH)
Author:
Anthony Ball Media Number:
CR-SIM 3 2015-301 Time 20.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 12 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 3 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 00 07/05/96 Initial development RAB SMC 01 03/05/99 Revised due to new simulator computer.
SCB DHG 02 02/07/00 Format modification RAB DHG 03 11/02/00 Include objective number, TLB comment, changed required oil temperature for Step 33 RAB DHG 04 01/03/02 Procedure changes RLS DHG 05 03/11/02 Include initial operator statement RAB RAB 06 03/08/05 Changed RO to NPO, added statement ensuring the procedure is the current version, changed procedure designations from -2S to -2, changed setup from IC 106 to IC 108.
ELJ RAB 07 06/13/05 Revised Initial License statement for successful completion RAB RAB 08 04/18/06 Remove Response Cues RAB RAB 8.1 10/11/09 Revised for use on 2009-302 Exam FNF CME 8.2 03/10/2015 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to CR-Sim 3 and deleted Fundamental Review Question.
Both will be added back to become new LR-JP-17.15-8.3 after NRC Exam.
ARB ELJ
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 12 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors
CR-SIM 3 2015-301 Page 4 of 12 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
ROLL THE MAIN TURBINE FROM 0 TO 1800 RPM (ALTERNATE PATH)
JPM NUMBER:
CR-SIM 3 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 34SO-N30-001-2, Section 7.1.5.49 through 7.1.5.56 and 34AR-650-152-2, section 5.0 have been correctly performed to raise Main Turbine speed from 800 to 1800 rpm and then respond to a Quill Shaft Failure.
TASK NUMBER:
017.015 OBJECTIVE NUMBER: 017.015.A PLANT HATCH JTA IMPORTANCE RATING:
NPO 2.25 SRO 2.83 K/A CATALOG NUMBER: 245000A4.06 K/A CATALOG JTA IMPORTANCE RATING:
NPO 2.7 SRO 2.6 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 34GO-OPS-001-2 (current version) 34SO-N30-001-2 (current version)
REQUIRED MATERIALS:
Unit 2 34SO-N30-001-2 (current version)
APPROXIMATE COMPLETION TIME: 20.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
CR-SIM 3 2015-301 Page 5 of 12 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #108 and place in RUN.
- 2.
INSERT the following OVERRIDES:
OR #
DESCRIPTION FINAL KEY loN34-C003G1 MOTOR SUCT PMP ON 1
loN34-C003R2 MOTOR SUCT PMP OFF 1
loN34-C005G1 TURN GEAR OIL PMP ON 1
loN34-C005R2 TURN GEAR OIL PMP OFF 1
- 3.
INSERT the following MALFUNCTION:
MALF #
DESCRIPTION FINAL RAMP DELAY KEY mfN34_140 Main Turbine Quill Shaft Oil Pump Fail 9999 2
mfN34_153 Loss of Turbine Bearing Oil Pres (Var) 100 10,000 9999 2
- 4.
Create the following EVENT TRIGGERS with the following information:
(NOTE: Use Windows Notepad to create blank *.scn and *.et files with the indicated names below. Copy the ET INFORMATION and SCN INFORMATION into the appropriate files.
Copy the 4 files into the simulators Hatch/Instr/ET directory).
SCN/ET NAME ET INFORMATION SCN INFORMATION EGN34-01.scn EGN34-01.et
- TG Oil Pump to RUN Deletes MF and OR diN34-C005.aivToPanel=2 DMF mfN34_153; DOR loN34-C005G1; DOR loN34-C005R2; EGN34-02.scn EGN34-02.et
- Motor Suction Pump to RUN Deletes MF and OR diN34-C003.aivToPanel=2 DMF mfN34_153; DOR loN34-C003G1; DOR loN34-C003R2;
- 5.
ACTIVATE event triggers EGN34-01 and EGN34-02.
- 6.
INCREASE Turbine Oil setpoint to 115 deg F.
- 7.
START Motor Suction Pump.
NOTE:
The Turbine will trip at 1300 RPM if the Motor Suction Pump is NOT running.
- 8.
SELECT a Turbine Speed of 800 RPM, Acceleration FAST.
CR-SIM 3 2015-301 Page 6 of 12
- 9.
AFTER Turbine is at 800 RPM select Acceleration MED.
- 10. SELECT the EX2100 screen and place Regulator Control in Auto.
- 11. SELECT the Control Speed screen (the normal Turbine Speed/Acceleration Screen).
- 12. WITH the Turbine at 800 RPM, PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 13. Markup 34SO-N30-001-2 up to, but not including, step 7.1.5.45. Ensure proper marking techniques are used for completed steps.
- 14. ENSURE HMI Screens are set up as follows:
Left DEPRESS:
CONTROL - SPEED - AND THEN - STATUS Right DEPRESS CONTROL, VIBRATION
- 14. ESTIMATED Simulator SETUP TIME:
15 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
A plant startup is in progress.
- 2.
The Turbine Vibration Trip Bypass switch is in NORMAL
- 3.
The Main Turbine is rolling at 800 RPM to increase lube oil temperatures.
- 4.
Lube Oil temperatures have increased sufficiently.
- 5.
34SO-N30-001-2, Main Turbine Operations, is complete up to Step 7.1.5.48.
INITIATING CUES:
Increase the Main Turbine speed to 1800 RPM and continue turbine startup IAW 34SO-N30-001-2, starting at Step 7.1.5.49.
CR-SIM 3 2015-301 Page 8 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
NOTE: All manipulations are performed at 2H11-P650 unless otherwise indicated.
- 1. Operator obtains the procedure needed to perform the task Operator has obtained 34SO-N30-001-2 and refers to section 7.1.5.49.
PROMPT: IF the operator asks about selection of an acceleration rate, THEN inform the operator to select MED.
PROMPT: It the operator asks about if it is desired to maintain the regulator in MANUAL and prevent autostart of the EX 2100, THEN inform the operator to maintain the regulator in MANUAL.
- 2. SELECT Speed of 1800 RPM.
(step 7.1.5.49.1)
SELECTS Speed Cmd RPM
- Rated (1800)**
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
CR-SIM 3 2015-301 Page 9 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 3. Once 900 rpm is reached STOP the Shaft Lift Pumps.
(step 7.1.5.49.1)
Operator, at 900 rpm, stops the Shaft Lift Pumps by placing the control switch in OFF PULL TO LOCK.
PROMPT: It is desired to maintain the regulator in MANUAL and prevent autostart of the EX 2100, THEN inform him to maintain the regulator in MANUAL.
- 4. SELECT **Manual** for Regulator Control on the EX2100 screen.
(step 7.1.5.49.1)
Operator SELECTS **Manual**
for Regulator Control on the EX2100 screen.
- 5. At 1000 rpm, select Acceleration RPM/min Fast (180).
(step 7.1.5.49.2)
Operator, at 1000 RPM, SELECTS Speed Control, Acceleration RPM/min Fast (180)
- 6. At 1200 rpm, SELECT Speed Control, Acceleration rpm/min desired rate:
Med (90) OR Fast (180).
(step 7.1.5.49.3)
Operator leaves Speed Control, Acceleration RPM/min selected to Fast (180) or changes Acceleration RPM/min to Med (90).
- 7. OBSERVE Turbine Speed increase and levels at approximately 1800 rpm.
(step 7.1.5.49.4)
Operator observes Turbine Speed increase and stabilize at approximately 1800 rpm on the DEHC screen.
- 8. CONFIRM annunciator 650-150, TURB SUPV TRIP BYPASS TURB VIB TRIP BYPASS, is clear.
(step 7.1.5.50)
Operator confirms annunciator 650-150, TURB SUPV TRIP BYPASS TURB VIB TRIP BYPASS, is clear and marks the step as N/A.
NOTE: May receive TURB SHAFT PUMP DISCH PRESS LOW, 651-104, alarm as the Main Turbine increases speed. It is acceptable AFTER the operator reviews the ARP to continue with the Main Turbine startup, if asked.
- 9. CONFIRM Main Shaft Pump Discharge pressure is between 210 and 250 PSIG.
(step 7.1.5.51)
Operator CONFIRMS Main Shaft Pump Discharge pressure is between 210 and 250 PSIG on the
- Monitor** **lube oil**
screen.
(** Indicates critical step)
CR-SIM 3 2015-301 Page 10 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 10. Stop 2N34-C003, Motor Suction Pump.(step 7.1.5.52)
Operator stops 2N34-C003, Motor Suction Pump by placing its control switch to OFF.
- 11. PLACE 2N34-C003 in the AUTO START position. (step 7.1.5.52)
Operator places control switch for 2N34-C003 in the AUTO START position.
- 12. STOP 2N34-C005, Turbine Turning Gear Oil Pump. (step 7.1.5.53)
Operator stops 2N34-C005, Turbine Turning Gear Oil Pump by placing its control switch to OFF.
- 13. PLACE 2N34-C005 in the AUTO START position. (step 7.1.5.53)
Operator places control switch for 2N34-C005 in the AUTO START position.
- 14. CONFIRM 2N39-C001, Turbine Turning Gear Motor control switch, is in the AUTO PULL position.
(step 7.1.5.54)
Operator confirms the control switch for 2N39-C001, Turbine Turning Gear Motor control switch, is in the AUTO PULL position.
- 15. PLACE the Shaft Lift Pumps control switch in the AUTO START Position.
(step 7.1.5.55)
Operator places the Shaft Lift Pumps control switch in the AUTO START Position.
- 16. CONFIRM 2P41-R610, Main Turbine Lube Oil Temp, is between 110°F and 120°F. (step 7.1.5.56)
Operator confirms on 2P41-R610, that Main Turbine Lube Oil Temp is between 110°F and 120°F.
THE ALTERNATE PATH STARTS HERE:
Simulator Instructor NOTE:
FIRST:
ENSURE oil pumps have been manually turned off by the operator, INCLUDING the Lift Pumps being OFF and Placed in AUTO, then ACTIVATE overrides (RB 1)/Event Triggers for the lube oil pumps are already activated.
SECOND:
ACTIVATE Quill Shaft Failure malfunction (RB 2)
- 17. Respond to Quill Shaft Failure annunciator.
Operator refers to annunciator procedure 650-152 for Quill Shaft Failure.
(** Indicates critical step)
CR-SIM 3 2015-301 Page 11 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 18. Confirm Turbine 200 psig oil pressure is below 60 psig.
(step 5.1)
Operator observes that Turbine 200 psig oil pressure is below 60 psig as indicated by 2N34-R601C.
- 19. Start TGOP. (step 5.2)
Operator starts the TGOP by placing its control switch to RUN.
NOTE: The TGOP is required for lift pump operation. IAW 34SO-N30-001-2 precaution 5.2.8, No more than two shaft lift pumps may be OFF WHEN turbine speed is < 900 RPM.
- 20. Start MSP. (step 5.2)
Operator starts the MSP by placing its control switch to RUN.
- 21. If Turbine Trips, enter 34SO-N30-001-2. (step 5.4)
Operator refers to 34SO-N30-001-2.
NOTE: If the Operator transitions to 34SO-N30-001-2, Main Turbine Operation, Section 7.2.2, Shutdown on Turbine Trip, prior to performing JPM steps 19 & 20 above, the JPM steps will be accomplished by 34SO-N30-001-2, steps 7.2.2.12 & 7.2.2.14.
PROMPT: WHEN operator refers to 34SO-N30-001-2, THEN inform the operator that another operator will carry out the actions for a Turbine Trip.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
With NO reasonable progress, the operator exceeds double the allotted time.
Operator has started lube oil pumps and has entered 34SO-N30-001-2 for a Turbine Trip.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
A plant startup is in progress.
- 2.
The Turbine Vibration Trip Bypass switch is in NORMAL
- 3.
The Main Turbine is rolling at 800 RPM to increase lube oil temperatures.
- 4.
Lube Oil temperatures have increased sufficiently.
- 5.
34SO-N30-001-2, Main Turbine Operations, is complete up to Step 7.1.5.48 INITIATING CUES:
Increase the Main Turbine speed to 1800 RPM and continue turbine startup IAW 34SO-N30-001-2, starting at Step 7.1.5.49.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 10 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 4 (ALL)
Title PLACE HPCI IN PRESSURE CONTROL MODE Author:
Anthony Ball Media Number:
CR-SIM 4 2015-301 Time 15.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 10 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 4 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 01 03/10/2015 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to CR-Sim 4 and deleted Fundamental Review Question.
Both will be added back to become new LR-JP-05.15-01 after NRC Exam.
ARB ELJ 2
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 10 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors 3
CR-SIM 4 2015-301 Page 4 of 10 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
PLACE HPCI IN PRESSURE CONTROL MODE JPM NUMBER:
CR-SIM 4 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 31EO-EOP-107, Section 3.2, have been correctly performed to place HPCI in pressure control mode and control reactor pressure between 500 and 900 psig.
TASK NUMBER:
005.015 OBJECTIVE NUMBER: 005.015.A PLANT HATCH JTA IMPORTANCE RATING:
RO 3.8 SRO 3.8 K/A CATALOG NUMBER: 206000A4.06 K/A CATALOG JTA IMPORTANCE RATING:
RO 4.3 SRO 4.3 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 31EO-EOP-107-2 REQUIRED MATERIALS:
Unit 2 31EO-EOP-107-2 APPROXIMATE COMPLETION TIME: 15.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
CR-SIM 4 2015-301 Page 5 of 10 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to a 100% IC or SNAP 614 and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS:
MALF #
TITLE FINAL VALUE RAMP RATE ACT.
TIME NONE
- 3.
INSERT the following SIMULATOR VALUE OVERRIDES (SVO):
SVO #
DESCRIPTION FINAL VALUE RAMP RATE ACT.
TIME NONE
- 4.
INSERT the following REMOTE FUNCTIONS:
REM #
DESCRIPTION STATUS NONE
- 5.
INSERT the following ORS OVERRIDES:
TAG #
P/L DESCRIPTION STATUS ACT.
TIME RFE41_153 HPCI TORUS SUCTION BYPASS OVRD 0000
- 6.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. From 100% power insert a manual scram.
B. Perform RC-1 and RC-2.
C. Allow the plant to stabilize with turbine bypass valves controlling reactor pressure and RFPTs controlling water level.
D. Ensure HPCI is in standby with NO initiation signal present.
E. RESET Scram.
- 7.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 8.
PLACE DANGER TAGS on the following equipment:
MPL #
COMPONENT TAGGED POSITION NONE
- 9.
ESTIMATED Simulator SETUP TIME:
15 5
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1. RFPTs are controlling reactor water level.
- 2. The HPCI High Torus Level Suction Swap has been over-ridden per 31EO-EOP-100-2.
INITIATING CUES:
Place HPCI in Pressure Control Mode per 31EO-EOP-107-2, ALTERNATE RPV PRESSURE CONTROL and control reactor pressure between 500 and 900 psig.
CR-SIM 4 2015-301 Page 7 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
1, Reset the HPCI initiation signal, IF the HPCI initiation cannot be reset, THEN do NOT perform this section.
(step 3.2.1)
CONFIRMS a HPCI initiation signal does NOT exist by verifying the HPCI auto initiation light is NOT illuminated on 2H11-P601.
- 2. IF HPCI system isolation has occurred and the isolation signal has cleared, THEN take HPCI Auto Isolation Signal A (B) switches to RESET.
OR IF HPCI system isolation has occurred and CANNOT be reset, DO NOT continue with this subsection.
(step 3.2.2)
CONFIRMS a HPCI isolation does NOT exist by verifying the HPCI isolation alarms are NOT illuminated and that 2E41-F002 and 2E41-F003 are OPEN, red lights illuminated on 2H11-P601.
- 3. To maintian HPCI suction source aligned to the CST, override the HPCI high torus level suction swap per 31EO-EOP-100-2, section 3.5.
(step 3.2.3)
Operator is informed in the turnover that this function has been overridden.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
CR-SIM 4 2015-301 Page 8 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 4. Confirm OPEN/OPEN 2E41-F029, Steam Line Drain 2E41-F003, Outbd Steam Isol 2E41-F028, Steam Line Drain (step 3.2.4)
VERIFYS the red light is illuminated for the following valves; 2E41-F029, panel 2H11-P601 2E41-F003, panel 2H11-P601 2E41-F028, panel 2H11-P602.
- 5. Confirm OPEN 2E41-F002, Inboard Steam Isolation Valve. (step 3.2.5)
On 2H11-P601, VERIFIES 2E41-F002 is open, red light illuminated.
On 2H11-P601, the operator places the switch for 2E41-F059 to open, red light illuminates.
- 7. START HPCI Vacuum Pump.
(step 3.2.7)
On 2H11-P601, the operator places the switch for the HPCI vacuum pump to start.
- 8. Confirm CLOSED 2E41-F006, Pump Discharge Valve. (step 3.2.8)
On 2H11-P601, the operator VERIFIES 2E41-F006 is closed, green light illuminated.
On 2H11-P601, the operator places the switch for 2E41-F008 to the open position, red light illuminates.
On 2H11-P601, the operator places the switch for 2E41-F011 to the open position, red light illuminates.
- 11. OPEN 2E41-F001, Turbine Steam Supply Valve. (step 3.2.10)
On 2H11-P601, the operator places the switch for 2E41-F001 to the open position, red light illuminates.
NOTE: If the Aux Oil Pump is NOT started until after the 2E41-F001 is full open the following annunciators will be received:
- 601-103, HPCI TURBINE TRIP
(** Indicates critical step)
CR-SIM 4 2015-301 Page 9 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 12. START the HPCI Auxiliary Oil Pump. (step 3.2.11)
On 2H11-P601, the operator places the switch for the HPCI Auxiliary Pump to start position, red light illuminates.
On 2H11-P601, the operator adjust HPCI flow controller 2E41-R612 and/or throttles 2E41-F008 to control reactor pressure.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
Reactor pressure is being controlled between 500 psig and 900 psig.
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE:
We will stop here.
(** Indicates critical step)
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1. RFPTs are controlling reactor water level.
- 2. The HPCI High Torus Level Suction Swap has been over-ridden per 31EO-EOP-100-2.
INITIATING CUES:
Place HPCI in Pressure Control Mode per 31EO-EOP-107-2, ALTERNATE RPV PRESSURE CONTROL and control reactor pressure between 500 and 900 psig.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 13 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 5 (ALL)
Title INITIATE EMERGENCY TORUS VENTING USING THE EMERGENCY VENT PATH (ALTERNATE PATH)
Author:
Anthony Ball Media Number:
CR-SIM 5 2015-301 Time 12.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 13 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 5 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 01 08/01/90 General revision and format change JEM DHG 02 05/24/91 General/procedure revision JLA DHG 03 08/18/92 General revision and format change WMM SCB 04 06/23/93 Task change, rename, procedure change, word processor change RAB RSG 05 12/02/93 Change initiating cue to a command, change valve naming to match the plant RAB SMC 06 06/17/96 Format change, modify time allowance RAB RSG 07 02/04/00 Format modification, title change, change time allowance based on running average RAB DHG 08 11/02/00 Include objective number RAB DHG 09 01/03/02 Change Unit 2 control pressure to 56 psig.
RLS DHG 10 03/07/02 Include initial operator statement RAB RAB 11 03/01/05 Update procedure numbers and operator applicability TFP DHG 12 06/02/05 Revised Initial License statement for successful completion RAB RAB 13 04/07/06 Remove Response Cues RAB RAB 14 09/21/09 Added HU steps, changed to add and identify critical steps to match procedure.
CLN/ADY ALD 14.1 08/02/11 Reviewed JPM against current procedure. Changed prompt for Unit 1 to pressure is 54 psig and decreasing which would require additional venting. Changed prompt for Unit 2 to pressure is 56 psig and decreasing which would require additional venting.
MMG ALS 14.2 03/10/2015 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to Sim 5, removed Unit 1 section and deleted Fundamental Review Question. ALL will be added back to become new LR-JP-13.53-14.3 after NRC Exam.
ARB ELJ 2
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 13 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors 14.1 MMG 3
CR-SIM 5 2015-301 Page 4 of 13 UNIT 1 (X)
UNIT 2 (X)
TASK TITLE:
INITIATE EMERGENCY TORUS VENTING USING THE EMERGENCY VENT PATH (ALTERNATE PATH)
JPM NUMBER:
CR-SIM 5 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 31EO-EOP-101-2, sections 3.1 and 3.2 have been correctly performed to Emergency Vent the Torus.
TASK NUMBER:
013.053 OBJECTIVE NUMBER: 013.053.O PLANT HATCH JTA IMPORTANCE RATING:
RO 4.14 SRO 4.50 K/A CATALOG NUMBER: 223001A207 K/A CATALOG JTA IMPORTANCE RATING:
RO 4.20 SRO 4.30 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 Unit 2 34SO-T48-002-1 31EO-EOP-101-1 31EO-EOP-012-1 34SO-T48-002-2 31EO-EOP-101-2 31EO-EOP-012-2 REQUIRED MATERIALS:
Unit 1 Unit 2 31EO-EOP-101-1 (current version)
Designated jumpers(2) in EOP jumper book Screwdriver or nutdriver 31EO-EOP-101-2 (current version)
Designated jumpers(2) in EOP jumper book Screwdriver or nutdriver APPROXIMATE COMPLETION TIME: 12.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
CR-SIM 5 2015-301 Page 5 of 13 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to 100% RTP IC or SNAP 615 and leave in FREEZE.
- 2.
INSERT the following Event Triggers:
ET #
Description EGT48-2 Modifies & increases Containment pressures when CAD B started and inserts EGT48-3 EGT48-3 Modifies & decreases Containment pressures when F082 is opened
- 3.
INSERT the following OVERRIDES:
Activator TAG #
S/M/L DESCRIPTION Final Value Ramp Rate Delay ST-0 aoB21-R623AP2 M
Post-Accident Mon Sys A - Rx Press 15 100 ST-0 aoB21-R623BP2 M
Post-Accident Mon Sys B - Rx Press 15 100 ST-0 aoT48-R601AP1 M
DW Press (Wide Range) 51 100 ST-0 aoT48-R601BP1 M
DW Press (Wide Range) 51 100 ST-0 aoT48-R607AP2 M
DW Press (Normal) 5 100 ST-0 aoT48-R607BP2 M
DW Press (Normal) 5 100 ST-0 aoT48-R608P1 M
DW Press Abnormal 58 100 ST-0 aoT48-R608P2 M
Torus Press Abnormal 56 100 ST-0 aoT48-R609P1 M
DW Press Abnormal 51 100 ST-0 aoT48-R609P2 M
Torus Press Abnormal 49 100 ST-0 aoT48-R631A M
DW Press 51 100 ST-0 aoT48-R631B M
DW Press 51 100 ST-0 aoT48-R632A M
Torus Press 49 100 ST-0 aoT48-R632B M
Torus Press 49 100
CR-SIM 5 2015-301 Page 6 of 13
- 3.
INSERT the following REMOTE FUNCTIONS:
REM #
DESCRIPTION STATUS rfT48_278 T48-F307, F308, F309, F324, F318, F319, F320, & F326 ORIDE
- 4.
INSERT the following Malfunctions:
Activator MALF #
TITLE FINAL VALUE RAMP RATE DELAY ST-0 mfB21_123A MSL A Break (before restrictor) 0.15 1000 0000
- 5.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Perform RC-1, 2, & 3 B. Start SBGT System 2A with suction from the Reactor Building.
C. Allow the Simulator to run until the plant is in the UNSAFE Region of the DSIL Curve.
D. When in the UNSAFE Region of the DSIL Curve, close the MSIVs and open the ADS valves.
E. Maintain RWL around 0 inches with Condensate.
F. TURN OFF THE SPDS SCREENS.
G. Acknowledge/Reset annunciators.
- 6.
RUN SCENARIO FILE and EVENT TRIGGER (current rev) 2015-301-615
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
Unit 2 Torus pressure is above the Pressure Suppression Pressure.
- 2.
31EO-EOP-012-2 (PC) is in progress.
- 3.
Standby Gas Treatment is in operation, taking suction from the Reactor Building and Refueling Floor.
- 4.
Normal AC Power has just been restored.
- 5.
Torus Venting with CAD is desired and Torus pressure is 48 psig and increasing slowly.
- 6.
CAD Loop A is unavailable and can NOT be used.
- 7.
SPDS is out of service.
INITIATING CUES:
Reduce Primary Containment pressure by performing Torus venting with CAD Loop B using 31EO-EOP-101-2, Emergency Containment Venting, Step 3.1.
CR-SIM 5 2015-301 Page 8 of 13 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
- 1.
Operator identifies the materials that are required.
Operator identifies the required materials and where to obtain them.
- 2. Defeat the High Drywell Pressure Isolation signal. (step 3.1.3.1)
At panel 2H11-P654, the operator PLACES the keylock PCIS Override Switches to OVERRIDE for:
High Drywell Press, 2T48-F332B High Drywell Press, 2T48-F333B
- 3. Defeat the Low RPV Level Isolation signal. (step 3.1.3.1)
At panel 2H11-P654, the operator PLACES the keylock PCIS Override Switches to OVERRIDE for:
Low RPV Level, 2T48-F332B Low RPV Level, 2T48-F333B IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
CR-SIM 5 2015-301 Page 9 of 13 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 4. Defeat the Reactor Building High Radiation Isolation signal.
(step 3.1.3.1)
At panel 2H11-P654, the operator PLACES the keylock PCIS Override Switches to OVERRIDE for:
Rx Bldg High Radn, 2T48-F332B Rx Bldg High Radn, 2T48-F333B
- 5. Defeat the Refuel Floor High Radiation Isolation signal.
(step 3.1.3.1)
At panel 2H11-P654, the operator PLACES the keylock PCIS Override Switches to OVERRIDE for:
Refuel Flr High Radn, 2T48-F332B Refuel Flr High Radn, 2T48-F333B
- 6. Open Torus 2 Vent valve, 2T48-F332B. (step 3.1.3.2)
At panel 2H11-P654: TORUS VENT ISOL VLV, 2T48-F332B is OPEN, red light illuminated.
- 7. Open Torus 2 Vent valve, 2T48-F333B. (step 3.1.3.2)
At panel 2H11-P654: TORUS VENT ISOL VLV, 2T48-F333B is OPEN, red light illuminated.
- 8. Using Torus Flow Controller, 2T48-R616B, Open Torus Vent Flow Control Valve, 2T48-F337B.
(step 3.1.3.3)
At panel 2H11-P654, the operator Operates 2T48-R616B, Torus Vent Flow Cntl Vlv 2T48-F337B, as required to maintain Suppression Chamber pressure below 56 psig.
- 9. Monitor Torus Pressure indication At panel 2H11-P657 (P654),
Torus pressure is being monitored by the operator.
THE ALTERNATE PATH STARTS HERE:
PROMPT:
WHEN the operator addresses Torus pressure, INDICATE for the operator that Torus pressure is 57 psig and slowly increasing.
(** Indicates critical step)
CR-SIM 5 2015-301 Page 10 of 13 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 10. Operator evaluates the need to transition to step 3.2 to use the Torus emergency vent path. (step 3.1.4)
Operator transitions to step 3.2 to use the Torus emergency vent path PROMPT:
IF addressed by the operator, as the Shift Supervisor, INFORM the operator that another operator is monitoring the NPSH curves for RHR and Core Spray.
PROMPT:
IF addressed by the operator, INFORM the operator that normal AC power and Non-interruptible air are available.
At panel 2H11-P654, the operator CLOSES 2T48-F081, SBGT INLET ISOL VLV, green light illuminated.
(step 3.2.2)
At panel 2H11-P654, the operator verifies closed 2T48-F083, SBGT INLET ISOL BYP VLV, green light illuminated.
- 13. Place 2T46-D001A, SBGT A Fan to OFF and verify that 2T46-F002A, SBGT A Filter Discharge closes.
(step 3.2.3)
At panel 2H11-P657, the operator PLACES 2T46-D001A, SBGT A FAN/FILTER to OFF, green light illuminated and VERIFIES that 2T46-F002A, FLTR DISCH CLOSES, green light illuminated.
- 14. Place 2T46-D001B, SBGT B Fan to OFF and verify that 2T46-F002B, SBGT B Filter Discharge closes.
(step 3.2.4)
At panel 2H11-P654, the operator PLACES 2T46-D001B, SBGT B FAN/FILTER to OFF, green light illuminated and VERIFIES that 2T46-F002B, FLTR DISCH CLOSES, green light illuminated.
NOTE:
Jumpers were inserted at the beginning of the JPM setup.
PROMPT:
WHEN the operator addresses installing jumpers for valves 2T48-F326 &
2T48-F318, INDICATE for the operator that the jumpers are installed.
(** Indicates critical step)
CR-SIM 5 2015-301 Page 11 of 13 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 15. Install jumper from UU-45 to UU-61 in panel 2H11-P601D for valve 2T48-F326. (step 3.2.5)
Operator has CALLED the Shift Support Supervisor to INSTALL jumper from UU-45 to UU-61at Panel 2H11-P601D, for valve 2T48-F326.
- 16. Install jumper from AA-70 to AA-73 in panel 2H11-P602A for valve 2T48-F318. (step 3.2.5)
Operator has CALLED the Shift Support Supervisor to INSTALL jumper from AA-70 to AA-73, at Panel 2H11-P602A, for valve 2T48-F318.
- 17. Open Torus Vent Valve, 2T48-F326.
(step 3.2.6)
At panel 2H11-P601, the operator OPENS 2T48-F326, TORUS VENT VLV, red light illuminated.
- 18. Open Torus Vent Valve, 2T48-F318.
(step 3.2.6)
At panel 2H11-P602, the operator OPENS 2T48-F318, TORUS VENT VLV, red light illuminated.
- 19. Close or confirm closed Torus Emergency Vent Path Drain Valve, 2T48-F085. (step 3.2.7)
At panel 2H11-P654, the operator VERIFIES that 2T48-F085, SUPP CHMBR EMERG VENT Path DRN VLV, is CLOSED.
PROMPT:
IF the operator addresses TSC HP Supervisor, INDICATE for the Operator that they have been informed of the rad release.
- 20. Open Torus Emergency Vent Valve, 2T48-F082. (step 3.2.9)
At panel 2H11-P654, the operator OPENS 2T48-F082, SUPP CHMBR EMERG VENT VLV, red light illuminated.
- 21. Closes Torus Emergency Vent Valve, 2T48-F082. (step 3.2.10)
At panel 2H11-P654, the operator CLOSES 2T48-F082, SUPP CHMBR EMERG VENT VLV, green light illuminated.
PROMPT:
IF the operator addresses a pressure band, as the Shift Supervisor, INFORM the operator to maintain 50 psig to 55 psig.
(** Indicates critical step)
CR-SIM 5 2015-301 Page 12 of 13 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
PROMPT:
IF the operator addresses System Restoration, as the Shift Supervisor, INFORM the operator that it is NOT desired at this time.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
Unit 2 Torus pressure is above the Pressure Suppression Pressure.
- 2.
31EO-EOP-012-2 (PC) is in progress.
- 3.
Standby Gas Treatment is in operation, taking suction from the Reactor Building and Refueling Floor.
- 4.
Normal AC Power has just been restored.
- 5.
Torus Venting with CAD is desired and Torus pressure is 48 psig and increasing slowly.
- 6.
CAD Loop A is unavailable and can NOT be used.
- 7.
SPDS is out of service.
INITIATING CUES:
Reduce Primary Containment pressure by performing Torus venting with CAD Loop B using 31EO-EOP-101-2, Emergency Containment Venting, Step 3.1.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 10 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 6 (ALL)
Title POWER A DEENERGIZED BUS FROM A DIESEL GENERATOR, (ALTERNATE PATH)
Author:
Anthony Ball Media Number:
CR-SIM 6 2015-301 Time 10.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 10 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 6 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 00 06/01/07 Initial development DHG BKW 01 6/26/07 Modify The Malfunction Numbers DHG RAB 02 10/23/08 Removed critical step requirement from step to lower voltage to 57 Hz; Clarified action required to complete critical task to match procedure step.
ADY RSG 02.1 10/09/09 Modified to use for 2009-302 FNF CME 2.2 03/10/15 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to Sim 5 and deleted Fundamental Review Question.
Both will be added back to become new LR-JP-28.06A-2.2 after NRC Exam.
ARB ELJ
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 10 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors
CR-SIM 6 2015-301 Page 4 of 10 UNIT 1
( )
UNIT 2 (X)
TASK TITLE:
POWER A DEENERGIZED BUS FROM A DIESEL GENERATOR, (ALTERNATE PATH)
JPM NUMBER:
CR-SIM 6 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 34AB-R43-001-2, Section 4.4, and 4.7 have been correctly performed to power the 4160 VAC Emergency Bus 2E from the 2A Emergency Diesel.
TASK NUMBER:
028.006 AND 028.023 OBJECTIVE NUMBER: 028.006.C PLANT HATCH JTA IMPORTANCE RATING:
RO 4.14 SRO 3.30 K/A CATALOG NUMBER: 262001A2.07 K/A CATALOG JTA IMPORTANCE RATING:
RO 4.2 SRO 4.3 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 2 34AR-652-102-2 34SO-R43-001-2 34AB-R43-001-2 (current versions)
REQUIRED MATERIALS:
Unit 2 34AB-R43-001-2 (current version)
APPROXIMATE COMPLETION TIME: 10.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE
CR-SIM 6 2015-301 Page 5 of 10 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to 100% Power and leave in FREEZE.
- 2.
INSERT the following MALFUNCTIONS:
MALF #
TITLE FINAL VALUE KEY DELAY TIME mfR22_182 4KV Bus 2E Fault 1
99999 mfR43_62A DIESEL GEN FAILURE TO Auto START 2A 0000 mfR43_239A DG A Output Brk One Shot Fail to Auto Tie
- 2.
INSERT the following OVERRIDES:
MALF #
TITLE FINAL VALUE KEY ACT.
TIME loR43-S251 Diesel 2A Mode Sel SW (note: this is the System Operative Light)
OFF
- 3.
Create the following EVENT TRIGGERS with the following information:
(NOTE: Use Windows Notepad to create blank *.scn and *.et files with the indicated names below. Copy the ET INFORMATION and SCN INFORMATION into the appropriate files.
Copy the 2 files into the simulators Hatch/Instr/ET directory).
SCN/ET NAME ET INFORMATION SCN INFORMATION EGR43-01.scn EGR43-01.et
- DIESEL 2A SHUTDOWN RELAY ACTIVATES SYS OP LIGHT diR43-S57.aivToPanel=1 DOR loR43-S251;
- 4. ACTIVATE event triggers EGR43-01.
- 5.
Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:
A. Activate malfunction mfR22_182 with Key 1.
B. Hold the A EDG speed switch to slower for approximately 5 seconds.
C. Remove malfunction mfR22_182.
- 4.
PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 5.
ESTIMATED Simulator SETUP TIME:
10 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
The 4160 VAC 2E Bus is de-energized.
- 2.
The 2A Emergency Diesel Generator has failed to start.
- 3.
Normal AC power is available to all other electrical distribution switchgear.
- 4.
34AR-652-102, LOSS OF OFFSITE POWER, is in progress.
- 5.
Conditions are met to energize 4160 VAC 2E Bus.
INITIATING CUES:
Start the 2A Emergency Diesel Generator and Energize the 2E 4160 VAC Bus, per 34AB-R43-001-2.
CR-SIM 6 2015-301 Page 7 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
NOTE:
The JPM uses the steps from 34AB-R43-001-2, (Att. 2), Diesel Generator Operating Instructions, PLACARD. The operator may select to use the procedure steps from the body of the procedure which is allowable.
NOTE:
All actions are performed on Panel 2H11-P652.
- 1. Confirms EDG 2A is NOT running.
The operator verifies CLEAR Diesel Auto Start Sys Operative light is illuminated and the Red Diesel Start light is extinguished.
- 2. Verify the Auto Start System Operative Light is lit. (step 4.4.1.1)
The operator determines the Auto Start System Operative Light is NOT lit.
- 3. Depress the Diesel Shutdown Relay pushbutton. (step 4.4.1.2)
The operator DEPRESSES the Diesel Shutdown Relay pushbutton.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
CR-SIM 6 2015-301 Page 8 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
NOTE:
When the Diesel Shutdown Relay pushbutton is depressed, the Diesel 2A Mode Sel SW WHITE light will illuminate after 110 seconds has passed.
- 4. Place the EDG START/STOP switch to START. (step 4.4.1.3)
The operator momentarily places the 2A EDG START/STOP switch to start.
THE ALTERNATE PATH WILL START HERE
- 5. Verify the EDG has started.
(step 4.4.1.4)
The operator verifies the CLEAR Diesel Auto Start Sys Operative light extinguishes and the Red Diesel Start light illuminates.
- 6. Verify the E 4160 VAC bus is energized. (step 4.4.1.4)
The operator observes voltage on the E 4160 VAC bus equals 0 VAC and answers procedure step with NO.
NOTE:
If the operator uses the body of the procedure then step 4.4.1.5 will direct them to step 4.6. Step 4.6.2 then transitions the operator to Section 4.7.
- 7. Confirm Normal and Alternate Supply Breakers open. (step 4.7.1.1)
The operator CONFIRMS ACB 135554 and ACB 135544 are open, green light illuminated.
- 8. Using Diesel Gen 2A Speed Adjust, lower frequency to 57 Hz.
(step 4.7.3.4)
At panel 2H11-P652, the Diesel Gen 2A SPEED ADJUST switch has been taken to LOWER until frequency is 57 Hz (+ or - 1 hz).
- 9. Using Diesel Gen 2A Speed Adjust, raise frequency to 60 Hz.
(step 4.7.3.4.1)
At panel 2H11-P652, the Diesel Gen 2A SPEED ADJUST switch has been taken to RAISE until frequency is 60 Hz (+ or - 1 hz).
(Critical action is EDG output breaker closing).
PROMPT: IF the operator answers NO to the flowchart question Did the Emerg Bus Energize?,
INFORM the operator that the DG Building is NOT accessible.
(** Indicates critical step)
CR-SIM 6 2015-301 Page 9 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 10. Verify the E bus is energized.
The operator observes voltage on the E 4160 VAC bus equals 4160 VAC and answers procedure step with Yes.
PROMPT: IF the opeator used the placard for energizing 2E Bus, when the operator goes to get to 34AB-R43-001-2, INFORM the operator that another operator will verify actions IAW 34AB-R43-001-2.
END TIME:__________
NOTE: The terminating cue shall be given to the Operator when:
With NO reasonable progress, the Operator exceeds double the allotted time.
4160 Bus 2E is energized with frequency at 59 - 61 Hz.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
The 4160 VAC 2E Bus is de-energized.
- 2.
The 2A Emergency Diesel Generator has failed to start.
- 3.
Normal AC power is available to all other electrical distribution switchgear.
- 4.
34AR-652-102, LOSS OF OFFSITE POWER, is in progress.
- 5.
Conditions are met to energize 4160 VAC 2E Bus.
INITIATING CUES:
Start the 2A Emergency Diesel Generator and Energize the 2E 4160 VAC Bus, per 34AB-R43-001-2.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 15 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 7 (ALL)
Title LOSS OF AIR ACTIONS FOR RX BLDG VENTILATION (ALTERNATE PATH)
Author:
Anthony Ball Media Number:
CR-SIM 7 2015-301 Time 20.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 15 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 7 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 00 05/18/09 Initial development FNF CME 0.1 03/10/2015 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to Sim 7 and deleted Fundamental Review Question.
Both will be added back to become new LR-JP-13.53-14.3 after NRC Exam.
ARB ELJ
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 15 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors
CR-SIM 7 2015-301 Page 4 of 15 UNIT 1
()
UNIT 2 (X)
TASK TITLE:
LOSS OF AIR ACTIONS FOR RX BLDG VENTILATION (ALTERNATE PATH)
JPM NUMBER:
CR-SIM 7 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 34AB-P51-001-2, Section 4.14-4.14.3, have been correctly performed to align ventilation in the Secondary Containment for a loss of air.
TASK NUMBER:
H-OPR0200.025 OBJECTIVE NUMBER: 200.025.C from SG50273 PLANT HATCH JTA IMPORTANCE RATING:
RO 3.93 SRO 3.61 K/A CATALOG NUMBER: 295019AK2.08 K/A CATALOG JTA IMPORTANCE RATING:
RO 2.8 SRO 2.9 OPERATOR APPLICABILITY: RO GENERAL
REFERENCES:
Unit 1 & 2 34AB-P51-001-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air System REQUIRED MATERIALS:
Unit 1 & 2 34AB-P51-001-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air System completed through step 4.13.
APPROXIMATE COMPLETION TIME: 20 Minutes SIMULATOR SETUP: See the next sheet.
CR-SIM 7 2015-301 Page 5 of 15 SIMULATOR SETUP Simulator Initial Conditions:
- 1.
RESET the Simulator to IC #113 and place in RUN.
- 2.
INSERT the following MALFUNCTIONS:
MALF #
TITLE FINAL VALUE RAMP RATE ACT.
TIME mfP51_222A Service Air Compressor 2A Trip mfP51_222B Service Air Compressor 2B Trip mfP51_222C Service Air Compressor 2C Trip mfP52_191 Instrument Air Leakage mfC71_59 Spurious Reactor Scram
- 3.
INSERT the following OVERRIDES:
OVERIDE #
TITLE FINAL VALUE diT46-D001A-1 SBGTS A Fan/Filter AUTO diT46-D001B-1 SBGTS B Fan/Filter AUTO diP52-F565 Rx Bldg Inst. N2 to Noninter. Ser. Vlv.
CLOSED
- 4.
Create the following EVENT TRIGGERS with the following information:
(NOTE: Use Windows Notepad to create blank *.scn and *.et files with the indicated names below. Copy the ET INFORMATION and SCN INFORMATION into the appropriate files.
Copy the 4 files into the simulators Hatch/Instr/ET directory).
SCN/ET NAME ET INFORMATION SCN INFORMATION EGT46-11.scn EGT46-11.et
- SBGT A in RUN doesn't work, B works diT46-D001A-1.iivPanel=3 DOR diT46-D001B-1; CET EGT46-12; EGT46-12.scn EGT46-12.et
- 5.
ACTIVATE event triggers EGT46-11 and EGT46-12.
CR-SIM 7 2015-301 Page 6 of 15
- 6.
Place Rx Mode Switch to Shutdown.
- 7.
Place RCIC in service, injecting into the vessel, with level slowly rising (this is to prevent the auto start of SBGT).
- 8.
Allow the simulator to run until the SBGT air operated valves (F001/2/3) fail open (~4 minutes)
- 9.
Mark up 34AB-P51-001-2 up to, but NOTincluding, step 4.14.
- 10. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
- 11. ESTIMATED Simulator SETUP TIME:
10 Minutes
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1. Unit 2 has lost all Service Air Compressors and they can not be restarted.
- 2. Electrical Maintenance and I&C are checking all air system electrical circuits.
- 3. The reactor has been scrammed and 34AB-C71-001-2, Scram Procedure is being carried out.
- 4. 34AB-P51-001-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air System has been partially completed.
INITIATING CUES:
Complete procedure 34AB-P51-001-2 starting at step 4.14.
CR-SIM 7 2015-301 Page 8 of 15 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
PROMPT:
Provide the operator with 34AB-P51-001-2 completed up to step 4.13.
- 1. The operator starts at the correct step.
Operator refers to 34AB-P51-001-2 and starts at step 4.14.
On panel 2H11-P650, Control Air Pressure, 2P52-R600, the operator observes pressure is less then 45 psig and NOTincreasing.
NOTES:
- If the operator attempts to first start the A SBGT, complete steps 3-9 and skip steps 10-16.
- If the operator attempts to first start the B SBGT, complete steps 10-16 and skip steps 3-9.
- All A controls are located on 2H11-P657.
- All B controls are located on 2H11-P654.
- SBGT air operated valves F001/2/3 fail in the OPEN position.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
CR-SIM 7 2015-301 Page 9 of 15 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
NOTE:
JPM steps 3 - 9 BELOW are for starting SBGT A first.
NOTE: The operator may use 34SO-T46-001-2, SBGT System, Att. 6, (Placard) to start SBGT A or the system operating procedure, either is acceptable.
- 3. OPEN 2T46-F003A, Fltr Inlet from Refuel Flr. (Placard step 1)
AND The operator places the keylock switch for 2T46-F003A, Fltr Inlet from Refuel Flr, to OPEN.
Open 2T46-F001A, Fltr Inlet from Rx Bldg. (Placard step 1)
The operator places the keylock switch for 2T46-F001A, Fltr Inlet from Rx Bldg, to OPEN.
- 4. PLACE SBGT A in RUN position (Placard step 2)
The operator places the control switch for SBGT A to RUN.
THE ALTERNATE PATH WILL START HERE NOTE: The operator should note that SBGT A does NOT start and continue with SBGT B start.
- 5. OPEN 2T46-F003B, Fltr Inlet from Refuel Flr. (Placard step 1)
AND Open 2T46-F001B, Fltr Inlet from Rx Bldg. (Placard step 1)
The operator places the keylock switch for 2T46-F003B, Fltr Inlet from Refuel Flr, to OPEN.
The operator places the keylock switch for 2T46-F001B, Fltr Inlet from Rx Bldg, to OPEN.
- 6. PLACE SBGT B in RUN position (Placard step 2)
The operator places the control switch for SBGT B in RUN.
- 7. CONFIRM 2T46-F002B OPENS.
(Placard step 3)
The operator observes 2T46-F002B red light ILLUMINATED.
(** Indicates critical step)
CR-SIM 7 2015-301 Page 10 of 15 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 8. CONFIRM SBGT B HTR Red Light ILLUMINATES (Placard step 4)
The operator observes SBGT B HTR Red Light ILLUMINATED.
The operator observes SBGT flow between 1500-4000 scfm on 2U41-R600.
NOTES:
- If the operator attempts to first start the A SBGT, complete steps 3-9 and skip steps 10-16.
- If the operator attempts to first start the B SBGT, complete steps 10-16 and skip steps 3-9.
- All A controls are located on 2H11-P657.
- All B controls are located on 2H11-P654.
- SBGT air operated valves F001/2/3 fail in the OPEN position.
NOTE:
JPM steps 10 - 16 BELOW are for starting SBGT B first.
NOTE: The operator may use 34SO-T46-001-2, SBGT System, Att. 6, (Placard) to start SBGT B.
- 10. OPEN 2T46-F003B, Fltr Inlet from Refuel Flr. (Placard step 1)
AND The operator places the keylock switch for 2T46-F003B, Fltr Inlet from Refuel Flr, to OPEN.
Open 2T46-F001B, Fltr Inlet from Rx Bldg. (Placard step 1)
The operator places the keylock switch for 2T46-F001B, Fltr Inlet from Rx Bldg, to OPEN.
- 11. PLACE SBGT B in RUN position (Placard step 2)
The operator places the control switch for SBGT B in RUN.
THE ALTERNATE PATH WILL START HERE NOTE: The operator should note that SBGT B does NOT start and continue with SBGT A start.
(** Indicates critical step)
CR-SIM 7 2015-301 Page 11 of 15 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 12. OPEN 2T46-F003A, Fltr Inlet from Refuel Flr. (Placard step 1)
AND Open 2T46-F001A, Fltr Inlet from Rx Bldg. (Placard step 1)
The operator places the keylock switch for 2T46-F003A, Fltr Inlet from Refuel Flr, to OPEN.
The operator places the keylock switch for 2T46-F001A, Fltr Inlet from Rx Bldg, to OPEN.
- 13. PLACE SBGT A in RUN position (Placard step 2)
The operator places the control switch for SBGT A to RUN.
- 14. CONFIRM 2T46-F002A OPENS.
(Placard step 3)
The operator observes 2T46-F002A red light LLUMINATED.
- 15. CONFIRM SBGT A HTR Red Light ILLUMINATES (Placard step 4)
The operator observes SBGT A HTR Red Light ILLUMINATED.
The operator observes SBGT flow between 1500-4000 scfm on 2T41-R618.
NOTE: The operator may NOT check the next step until after all are other steps of this JPM are complete.
- 17. Checks the Rx bldg and RF Floor Diff pressures are negative.
(Placard step 6)
On panel 2H11-P700 the operator checks the RF Floor to Outside Air dp and the Rx Bldg to Outside Air dp on recorders 2T46-R604A and 2T46-R604B.
The dp will be approximately (negative) -0.25 inches.
NOTE: For the fans listed below, if a fan is NOT running and does NOT auto start, then the step is NOT critical. The step is to be marked SAT if, after the operator is done, the fan is NOT running (green light illuminated).
- 18. TRIP 2U41-C001A, Turb Bldg Vent Supply Fan (step 4.14.2)
On panel 2H11-P654 the operator places control switch for 2U41-C001A, Turb Bldg Vent Supply Fan, to the OFF position, green light illuminated.
(** Indicates critical step)
CR-SIM 7 2015-301 Page 12 of 15 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 19. TRIP 2U41-C001B, Turb Bldg Vent Supply Fan (step 4.14.2)
On panel 2H11-P654 the operator places control switch for 2U41-C001B, Turb Bldg Vent Supply Fan, to the OFF position, green light illuminated.
- 20. TRIP 2U41-C002A, Turb Bldg Vent Exhaust Fan (step 4.14.2)
On panel 2H11-P654 the operator places control switch for 2U41-C002A, Turb Bldg Vent Exhaust Fan, to the OFF position, green light illuminated.
- 21. TRIP 2U41-C002B, Turb Bldg Vent Exhaust Fan (step 4.14.2)
On panel 2H11-P654 the operator places control switch for 2U41-C002B, Turb Bldg Vent Exhaust Fan, to the OFF position, green light illuminated.
- 22. TRIP 2T41-C001A, Rx Bldg Vent Supply Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-C001A, Rx Bldg Vent Supply Fan, to the OFF position, green light illuminated.
- 23. TRIP 2T41-C001B, Rx Bldg Vent Supply Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for to the OFF position, green light illuminated.
- 24. TRIP 2T41-C007A, Rx Bldg Vent Exhaust Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-C001B, Rx Bldg Vent Supply Fan, to the OFF position, green light illuminated.
- 25. TRIP 2T41-C007B, Rx Bldg Vent Exhaust Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-C007B, Rx Bldg Vent Exhaust Fan, to the OFF position, green light illuminated.
(** Indicates critical step)
CR-SIM 7 2015-301 Page 13 of 15 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 26. TRIP 2T41-B017 Fan 1, Rx Bldg Recirc Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-B017 Fan 1, Rx Bldg Recirc Fan, to the OFF position, green light illuminated.
- 27. TRIP 2T41-B017 Fan 2, Rx Bldg Recirc Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-B017 Fan 2, Rx Bldg Recirc Fan, to the OFF position, green light illuminated.
- 28. TRIP 2T41-C002A, Refuel Flr Vent Supply Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-C002A, Refuel Flr Vent Supply Fan, to the OFF position, green light illuminated.
- 29. TRIP 2T41-C002B, Refuel Flr Vent Supply Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-C002B, Refuel Flr Vent Supply Fan, to the OFF position, green light illuminated.
- 30. TRIP 2T41-C005A, Refuel Flr Vent Exh Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-C005A, Refuel Flr Vent Exh Fan, to the OFF position, green light illuminated.
- 31. TRIP 2T41-C005B, Refuel Flr Vent Exh Fan (step 4.14.2)
On panel 2H11-P657 the operator places control switch for 2T41-C005B, Refuel Flr Vent Exh Fan, to the OFF position, green light illuminated.
- 32. Confirm OPEN/OPEN 2N21-F014, Condensate Demineralizer Bypass Valve.
(step 4.14.3)
The operator sends an SO to confirm OPEN/OPEN 2N21-F014, Condensate Demineralizer Bypass Valve, at panel 2N21-P001.
(** Indicates critical step)
CR-SIM 7 2015-301 Page 14 of 15 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
PROMPT:
WHEN the operator sends an SO to confirm the valve is open, INFORM the operator that another operator will complete the remainder of 34AB-P51-001-2.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
With NO reasonable progress, the operator exceeds double the allotted time.
Operator is prompted that another operator will complete 34AB-P51-001-2.
Operator states the task is complete.
(** Indicates critical step)
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1. Unit 2 has lost all Service Air Compressors and they can not be restarted.
- 2. Electrical Maintenance and I&C are checking all air system electrical circuits.
- 3. The reactor has been scrammed and 34AB-C71-001-2, Scram Procedure is being carried out.
- 4. 34AB-P51-001-2 Loss Of Instrument And Service Air System Or Water Intrusion Into The Service Air System has been partially completed.
INITIATING CUES:
Complete procedure 34AB-P51-001-2 starting at step 4.14.
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 9 Southern Nuclear Company Operations Training JPM FINAL CR-SIM 8 (RO ONLY)
Title PLACE THE CONTROL ROOM HVAC SYSTEM IN THE PURGE MODE Author:
Anthony Ball Media Number:
CR-SIM 8 2015-301 Time 15.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 9 Course Number Program Name OPERATIONS TRAINING Media Number CR-SIM 8 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 00 11/20/97 Initial Development based on needs indicated from the PRA analysis.
SCB DHG 01 03/20/00 Format modification, change time allowance based on running average, update K/As, correct typos RAB DHG 02 11/03/00 Include objective number RAB DHG 03 03/19/02 Include initial Operator statement RAB RAB 04 06/25/05 Revised Initial License statement for successful completion RAB RAB 05 06/23/06 Remove Response Cues RAB RAB 06 05/19/07 Correct Step 10 to start instead of stop.
DHG RAB 07 10/14/08 Added 1Z41-B003C to fans secured in step 3 to match procedure.
JWP RAB 07.1 10/17/11 Reviewed JPM against current procedure. Added pass / fail criteria.
Added Fundamental question to new Attachment 1.
MMG ALS 7.2 03/10/2015 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Updated General References.
Changed Media Number to CR-Sim 8 and deleted Fundamental Review Question. Both will be added back to become new LR-JP-25026-7.3 after NRC Exam.
ARB ELJ 2
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 9 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors 07.1 MMG 3
CR-SIM 8 2015-301 Page 4 of 9 UNIT 1 (X)
UNIT 2
( )
TASK TITLE:
PLACE THE CONTROL ROOM HVAC SYSTEM IN THE PURGE MODE JPM NUMBER:
CR-SIM 8 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 34SO-Z41-001-1, Section 7.1.4, have been correctly performed to place the Control Room Ventilation System in the Purge Mode.
TASK NUMBER:
037.010 OBJECTIVE NUMBER: 037.010.O PLANT HATCH JTA IMPORTANCE RATING:
RO 3.00 SRO 2.63 K/A CATALOG NUMBER: 290003G2.1.30 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.90 SRO 3.40 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 34SO-Z41-001-1 (current version) 34AB-T41-001-1 (current version)
REQUIRED MATERIALS:
Unit 1 34SO-Z41-001-1 (current version)
APPROXIMATE COMPLETION TIME: 15.0 Minutes SIMULATOR SETUP: N/A
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
Unit 1 and Unit 2 have both been scrammed due to a loss of Plant Service Water.
- 2.
The Main Control Room Ventilation System has been operating in a Normal Ventilation configuration for several days with the following alignment:
1Z41-B003A, HVAC Unit, RUN 1Z41-B003B, HVAC Unit, STBY 1Z41-B003C, HVAC Unit RUN
- 3.
No cooling water is available for the Main Control Room Air Handling Units.
- 4.
34AB-T41-001-1, Loss of Area Ventilation, is in progress.
INITIATING CUES:
Purge the Unit 1 Main Control Room with the Main Control Room Ventilation System per 34SO-Z41-001-1, Step 7.1.4.
CR-SIM 8 2015-301 Page 6 of 9 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:_________
- 1. Operator identifies the procedure needed to perform the task.
Operator has obtained the correct procedure, 34SO-Z41-001-1, Section 7.1.4.
- 2. Operator reviews the procedures precautions and limitations.
Operator has REVIEWED the precautions and limitations.
- 3. Operator notifies SS to declare one MCREC system INOPERABLE and enter into the associated RAS.
(NOTE before step 7.1.4.1.1)
Operator has notified the SS to declare one MCREC system INOPERABLE and enter into the associated RAS.
(** Indicates critical step)
CR-SIM 8 2015-301 Page 7 of 9 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
NOTE: Operating the fan AND opening 1Z41-F018A, Suction Damper, presents a single failure concern regarding isolation of the exhaust duct in the event a pressurization mode actuation occurs.
- 4. Start Exhaust Fan, 1Z41-C011A.
(step 7.1.4.1.1)
At panel 1H11-P657, PLACES the control switch for 1Z41-C011A in START, RED light illuminated.
- 5. Confirms suction damper 1Z41-F018A opens. (step 7.1.4.1.1.1)
At panel 1H11-P657, CONFIRMS 1Z41-F018A OPENS, RED light illuminated.
NOTE: 1Z41-F018A automatically opens when the 1Z41-C011A fan is started.
- 6. Open Inlet Control vane, 1Z41-F017A.
(step 7.1.4.1.1.2)
Have SSS send a SO to the 180 elevation of the Control Building to OPEN inlet control damper 1Z41-F017A.
PROMPT:
WHEN asked to send someone to open 1Z41-F017A, INFORM the Operator that 1Z41-F017A is open.
PROMPT:
IF the Operator asks the status of Main Control Room Ventilation, per the initial conditions, INFORM the Operator that it is operating in the normal configuration.
- 7. Confirm OPERATING or START 1Z41-B003A HVAC unit.
(step 7.1.4.1.2)
At panel 1H11-P657, CONFIRMS 1Z41-B003A control switch in RUN, RED light illuminated.
- 8. Confirm STOPPED or STOPS 1Z41-B003C HVAC unit.
(step 7.1.4.1.3)
At panel 1H11-P654, PLACES 1Z41-B003C control switch in STOP (OFF), GREEN light illuminated.
PROMPT:
IF the Operator asks if 1Z41-B003B is required for additional temperature control, INFORM the Operator that it is NOT needed for additional temperature control.
(** Indicates critical step)
CR-SIM 8 2015-301 Page 8 of 9 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 9. Confirm STOPPED or STOP 1Z41-B003B HVAC unit.
(step 7.1.4.1.4)
At panel 1H11-P654, CONFIRMS 1Z41-B003B control switch in STOP (OFF), GREEN light illuminated.
- 10. Confirm OPEN the following dampers:
1Z41-F009A 1Z41-F030A (step 7.1.4.1.5)
At panel 1H11-P657, CONFIRMS 1Z41-F009A &
1Z41-F030A, OPENS, RED light illuminated.
NOTE: 1Z41-F009A & 1Z41-F030A will open when AHU 1Z41-B003A is started.
- 11. Confirm CLOSE the following dampers:
1Z41-F009C 1Z41-F030C (step 7.1.4.1.6)
At panel 1H11-P654, CONFIRMS 1Z41-F009C &
1Z41-F030C, CLOSES, GREEN light illuminated.
NOTE: 1Z41-F009C & 1Z41-F030C will close when AHU 1Z41-B003C is stopped.
- 12. CLOSE the following dampers:
1Z41-F028A 1Z41-F028B (step 7.1.4.1.6)
At panel 1H11-P654, PLACES control switch for 1Z41-F028A &
1Z41-F028B in CLOSE, GREEN light illuminated.
NOTE: It is only critical to close ONE of the above two valves.
- 13. CLOSE the following dampers:
1Z41-F010A 1Z41-F010B (step 7.1.4.1.6)
At panel 1H11-P654, PLACES control switch for 1Z41-F010A &
1Z41-F010B in CLOSE, GREEN light illuminated.
NOTE: It is only critical to close ONE of the above two valves.
(** Indicates critical step)
CR-SIM 8 2015-301 Page 9 of 9 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 14. Confirm CLOSE 1Z41-F009B, Recirc Line Isol Damper.
(step 7.1.4.1.6)
At panel 1H11-P654, CONFIRMS 1Z41-F009B closes, GREEN light illuminated.
- 15. Confirm CLOSE the following dampers:
1Z41-F014A, Recirc Inlet 1Z41-F014B, Recirc Inlet (step 7.1.4.1.6)
At panel 1H11-P654, PLACES control switch for 1Z41-F014A &
1Z41-F014B in CLOSE, GREEN light illuminated.
- 16. OPEN Roll Filter Bypass, 1Z41-F015.
(step 7.1.4.1.7)
At MCR Door C70, ROLL FILTER BYPASS, 1Z41-F015 control switch is in OPEN, RED light illuminated.
At panel 1H11-P657, CONFIRMS FILTER INLET control switch, 1Z41-F016, is in OPEN position, RED light illuminated.
- 18. Confirm OPEN or OPENS 1Z41-F011, Filter Bypass. (step 7.1.4.1.9)
At panel 1H11-P657, FILTER BYPASS control switch, 1Z41-F011, is in OPEN position, RED light illuminated.
- 19. Confirm OPEN or OPENS 1Z41-F012, Filter Bypass. (step 7.1.4.1.10)
At panel 1H11-P654, FILTER BYPASS control switch, 1Z41-F012, is in OPEN position, RED light illuminated.
PROMPT:
IF the Operator asks if additional smoke removal is required, INFORM the Operator that additional smoke removal is NOT required at this time.
END TIME:__________
NOTE: The terminating cue shall be given to the Operator when:
With NO reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE:
We will stop here.
(** Indicates critical step)
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 7 Southern Nuclear Company Operations Training JPM FINAL PLANT 1 (ALL)
Title ACTUATE THE DIESEL GENERATOR ROOM CO2 SYSTEM Author:
Anthony Ball Media Number:
Plant 1 2015-301 Time 10.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 7 Course Number Program Name OPERATIONS TRAINING Media Number Plant 1 2015-301 Rev.
No.
Date Reason for Revisions Authors Initials Sups Initials 00 10/28/99 Initial development RAB DHG 01 11/03/00 Include objective number RAB DHG 02 03/19/02 Include initial operator statement RAB RAB 03 06/16/05 Revised Initial License statement for successful completion RAB RAB 04 05/05/06 Remove Response Cues RAB RAB 05 08/05/10 Added HU tools. Added procedure number to Initiating Cue.
ELJ CME 05.1 10/17/11 Reviewed JPM against current procedure. Added Fundamental question to new Attachment 1.
MMG ALS 5.2 03/10/2015 Reviewed JPM against current procedure, changed Media Number to Plant 1, and removed Fundamental Question. Both will be added back to become new LR-JP-20024-5.3 after NRC Exam restored after ILT-9 NRC Exam.
ARB ELJ
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 7 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors 05.1 MMG
Plant 1 2015-301 Page 4 of 7 UNIT 1 (X)
UNIT 2
( )
TASK TITLE:
ACTUATE THE DIESEL GENERATOR ROOM CO2 SYSTEM JPM NUMBER:
Plant 1 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 34SO-X43-005-0, Section 7.2.1-7.2.3, have been correctly performed to actuate the 1C D/G Room CO2 fire protection system.
TASK NUMBER:
200.024 OBJECTIVE NUMBER: 200.024.A PLANT HATCH JTA IMPORTANCE RATING:
RO 3.15 SRO 3.90 K/A CATALOG NUMBER: 286000A208 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.20 SRO 3.30 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 34SO-X43-005-0 (current version)
REQUIRED MATERIALS:
Unit 1 34SO-X43-005-0 (current version)
APPROXIMATE COMPLETION TIME: 10.0 Minutes SIMULATOR SETUP: N/A
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
A fire is burning in the 1C D/G Room.
- 2.
The 1C D/G Room CO2 System did NOT automatically actuate.
INITIATING CUES:
Actuate the 1C D/G Room CO2 fire protection system per 34SO-X43-005-0, Diesel Generator Building Carbon Dioxide System.
Plant 1 2015-301 Page 6 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01-0685 Section 6.5.3 provides examples)
START TIME:__________
PROMPT:
WHEN addressed, INFORM the operator the RED light is ILLUMINATED.
- 1. Depress and hold the START pushbutton switch.
(step 7.2.1)
In the hallway outside the 1C Diesel Generator Room, the operator DEPRESSES and HOLDS the START pushbutton PROMPT:
AFTER the pushbutton is depressed, INFORM the operator that the RED light remained ILLUMINATED and there was NO response.
- 2. PLACE the 1C Diesel Generator Room CARDOX Pilot Control Valve in OPEN.
(step 7.2.2)
In the hallway outside the 1C Diesel Generator Room, the operator OPENS the 1C Diesel Generator Room CARDOX Pilot Control Valve.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
Plant 1 2015-301 Page 7 of 7 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 3. PLACE the Master Pilot for the Diesel Generator Building in OPEN.
(step 7.2.3)
On the Diesel Generator Building West Wall, the operator OPENS 1X43-P007, Master Pilot for Diesel Generator Bldg.
PROMPT:
AFTER the system is actuated, INFORM the operator that another person will shut down the system after 1 minute.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 10 Southern Nuclear Company Operations Training JPM FINAL PLANT 2 (ALL)
Title Align Emergency Nitrogen To Drywell Pneumatics Author:
Anthony Ball Media Number:
Plant 2 2015-301 Time 16.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 10 Course Number Program Name OPERATIONS TRAINING Media Number Plant 2 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 00 11/20/97 Initial development as a result of PRA vs training analysis.
SCB RSG 01 02/11/98 Revised typographical errors.
SCB DHG 02 01/20/99 Revised based on evaluator comments.
SCB DHG 03 03/20/00 Format modification, change time allowance based on running average RAB DHG 04 11/03/00 Include objective number RAB DHG 05 03/19/02 Incorporate ADY comment, correct Nitrogen pressure readings to agree with procedural requirement, add step to review the procedure, include initial operator statement RAB RAB 06 02/24/05 Changed procedure numbers and corrected step reference in initial conditions section of page 2 and 5.
TFP DHG 07 06/27/05 Revised Initial License statement for successful completion RAB RAB 08 06/23/06 Remove Response Cues RAB RAB 09 09/29/10 Added HU Pass/Fail criteria. Updated Southern Company logo.
Added an evaluator note to move to a low dose rate area after the operator identifies the components locations.
ELJ CME 09.1 10/17/11 Reviewed JPM against current procedure. Added Fundamental question to new Attachment 1.
MMG ALS 09.2 03/10/2015 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to Plant 2 and deleted Fundamental Review Question.
Both will be added back to become new LR-JP-25028-09.3 after NRC Exam. Added step 7.3.1.3 to the Initiating Cue.
ARB ELJ
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 10 Line Contributors The following individuals contributed to the development of this lesson plan.
Ver. No.
List of Contributors 09.1 MMG
Plant 2 2015-301 Page 4 of 10 UNIT 1 (X)
UNIT 2 (X)
TASK TITLE:
Align Emergency Nitrogen To Drywell Pneumatics JPM NUMBER:
Plant 2 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 34SO-P70-001-1/2, Section 7.3.1.1 through 7.3.1.3.5, have been correctly performed to align nitrogen to SRVs from emergency temporary nitrogen bottles.
TASK NUMBER:
042.005 OBJECTIVE NUMBER: 042.005.O PLANT HATCH JTA IMPORTANCE RATING:
RO 2.86 SRO Not Available K/A CATALOG NUMBER: 223001A411 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.10 SRO 3.00 OPERATOR APPLICABILITY: Systems Operator (SO)
GENERAL
REFERENCES:
Unit 1 Unit 2 34AB-X43-001-1 34SO-P70-001-1 (current versions) 34AB-X43-001-2 34SO-P70-001-2 (current version)
REQUIRED MATERIALS:
Unit 1 Unit 2 34SO-P70-001-1 (current version) 34SO-P70-001-1 (current version)
APPROXIMATE COMPLETION TIME: 16.0 Minutes SIMULATOR SETUP: N/A
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
A fire has occurred on Unit 1
- 2.
Unit 1 has been scrammed and all rods are inserted
- 3.
The crew is addressing 34AB-X43-001-1, Fire Procedure, step 8.4.7 INITIATING CUES:
Align Nitrogen to SRVs from emergency temporary Nitrogen bottles per 34SO-P70-001-1, Drywell Pneumatics System, starting at step 7.3.1.3.
Plant 2 2015-301 Page 6 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.
Reference:
NMP-TR-111, On-The-Job Training and Task Performance Evaluation START TIME:__________
NOTE: IAW the Unit 1 FSAR, this procedure section is a Time Critical Operator Action for a specific set of plant conditions. The initial plant conditions of this JPM do NOT meet the FSAR conditions; therefore this JPM is NOT a Time Critical JPM.
PROMPT:
IF ASKED by the operator, INFORM the operator that this JPM is NOT Time Critical.
- 1. Operator reviews the procedure.
The Operator REVIEWS the procedure.
PROMPT:
IF ASKED by the operator, as the Shift Supervisor, INFORM the operator that 1P70-F004 and 1P70-F066 have been verified in the closed position on the 1H11-P700 panel.
NOTE: 1P70-A002A is on top of the Nitrogen bottle.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
Plant 2 2015-301 Page 7 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 2. Open Emergency Nitrogen bottle 1P70-A002A outlet valve 1P70-F138A.
(step 7.3.1.3.1)
On elev. 130RLR09, Nitrogen Bottle outlet valve 1P70-F138A handwheel is TURNED counter clockwise until it stops.
- 3. Confirm correct Nitrogen pressure on 1P70-PCV-F140.
(step 7.3.1.3.2)
At 130RLR09, the operator CONFIRMS 1P70-PCV-140 indicates between 100-110 psig.
(step 7.3.1.3.3)
At 130RLR09, the operator TURNS 1P70-F141, Emergency Nitrogen Supply Header Inboard Isolation valve, parallel with the pipe.
(step 7.3.1.3.4)
At 130RLR09, the operator TURNS 1P70-F084, Emergency Nitrogen Supply Header Inboard Isolation valve, counter clockwise until it stops.
- 6. Confirm and monitor correct Nitrogen pressure on 1P70-PCV-F140.
(step 7.3.1.3.5)
At 130RLR09, the operator CONFIRMS 1P70-PCV-140 indicates between 100-110 psig.
PROMPT:
INFORM the operator that another operator will continuously monitor nitrogen pressure and replace bottles as necessary.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
A fire has occurred on Unit 2.
2 Unit 2 has been scrammed and all rods are inserted.
- 3.
The crew is addressing 34AB-X43-001-2, Fire procedure, step 8.3.7 INITIATING CUES:
Align nitrogen to SRVs from emergency temporary Nitrogen bottles per 34SO-P70-001-2, Drywell Pneumatics System, starting at step 7.3.1.3.
Plant 2 2015-301 Page 9 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
(1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.
Reference:
NMP-TR-111, On-The-Job Training and Task Performance Evaluation Note to evaluator: Radiation dose rates are elevated in the vicinity of these Nitrogen bottles. Minimize time in this area. There is a posted low dose area close to this area that is in line-of-sight. After the component locations are identified by the operator, move to a low dose rate area to discuss performance of the procedural steps.
START TIME:__________
- 1. Operator reviews the procedure.
The Operator REVIEWS the procedure.
(step 7.3.1.1)
At 130RBR23, the operator TURNS 2P70-F023, Drywell Pneumatic Header Isolation valve handwheel, clockwise until it stops.
PROMPT:
IF the operator sends a SO to check 2P70-F021, INFORM the operator that the valve has been closed. 2P70-F021 is located approximately 10 feet behind the Drywell Air Receiver tank, against the wall opposite the Drywell, 5 feet above the floor.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the JPM as a PASS FAIL Above standards not met Mark the JPM as a FAIL
(** Indicates critical step)
Plant 2 2015-301 Page 10 of 10 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
At 158RBR16, the operator TURNS 2P70-F021, Drywell Pneumatic Header Isolation valve handwheel, clockwise until it stops.
NOTE: 2P70-F138A is on top of the Nitrogen bottle.
- 4. Open Emergency Nitrogen bottle 2P70-A002A outlet valve 2P70-F138A. (step 7.3.1.3.1)
At 130RBR23, the operator TURNS 2P70-F138A, Nitrogen Bottle outlet valve handwheel, counter clockwise until it stops.
- 5. Confirm correct Nitrogen pressure on 2P70-PCV-F140. (step 7.3.1.3.2)
On elev. 130RBR23, confirms 2P70-PCV-140 indicates between 100-110 psig.
At 130RBR23, the operator TURNS 2P70-F141, Nitrogen Bottles Pressure Control Valve Isolation valve handle, until it is parallel with the pipe.
At 130RBR23, the operator TURNS 2P70-F084, Emergency Nitrogen To Drywell Pneumatic Header Isolation handwheel, counter clockwise until it stops.
- 8. Confirm and monitor correct Nitrogen pressure on 2P70-PCV-F140.
(step 7.3.1.3.5)
On elev. 130RBR23, confirms 2P70-PCV-140 indicates between 100-110 psig.
PROMPT:
INFORM the operator that another operator will continuously monitor nitrogen pressure and replace bottles as necessary.
END TIME:__________
NOTE: The terminating cue shall be given to the operator when:
With NO reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 1 of 12 Southern Nuclear Company Operations Training JPM FINAL PLANT 3 (ALL)
Title TRANSFER 600 VAC ESSENTIAL (LPCI BUS) FROM NORMAL TO ALTERNATE Author:
Anthony Ball Media Number:
Plant 3 2015-301 Time 23.0 Minutes Line Technical Review By (N/A for minor revisions)
Date:
Reviewed by Instructional Technologist or designee Date Approved By (Training Program Manager or Lead Instructor)
Ed Jones Date 03/10/2015
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 2 of 12 Course Number Program Name OPERATIONS TRAINING Media Number Plant 3 2015-301 Ver. No.
Date Reason for Revisions Authors Initials Sups Initials 00 10/28/99 Initial development RAB DHG 01 04/24/00 Made Step 4 for both units non-critical, correct Operator title (SO)
RAB DHG 02 11/02/00 Include objective number, change time allowance based on running average RAB DHG 03 03/11/02 Include initial Operator statement RAB RAB 04 03/08/05 Documentum revision DNM RAB 05 05/27/05 Revised Initial License statement for successful completion RAB RAB 06 04/18/06 Remove Response Cues RAB RAB 07 10/09/09 Added that 2R24-S018A (B) Alt Supply Bkr position can be determined in the CR or locally as stated in the procedure. Added HU steps.
GHC ALD 07.1 10/17/11 Reviewed JPM against current procedure. Added pass / fail criteria.
Added Fundamental question to Attachment 1. U-2 requires the following, Confirm 2R24-S048 Diesel Bldg MCC 2D is ENERGIZED via the 2S11-S012 transformer AND 2R22-S006 2F 4160 VAC Bus. (2H11-P652). I changed the wording to reflect this.
MMG ALS 7.2 03/10 Reviewed JPM against current procedure to be used on ILT-9 NRC Exam. Changed Media Number to Plant 3, removed steps for S018B and deleted Fundamental Review Question. All will be added back to become new LR-JP-27.18-7.3 after NRC Exam.
ARB ELJ 2
Southern Nuclear Operating Company Nuclear Management Form Training Material Cover/Revision Sheet NMP-TR-214-F01 Version 2.1 Page 3 of 12 Line Contributors The following individuals contributed to the development of this lesson plan.
Rev. No.
List of Contributors 07.1 MMG 3
Plant 3 2015-301 Page 4 of 12 UNIT 1 (X)
UNIT 2
( )
TASK TITLE:
TRANSFER 600 VAC ESSENTIAL (LPCI BUS) FROM NORMAL TO ALTERNATE JPM NUMBER:
Plant 3 2015-301 TASK STANDARD:
This task shall be successfully completed when all of the JPM Critical Steps corresponding to 34SO-R24-003-1:
(1) Section 7.1.2 have been correctly performed to transfer LPCI Bus, 1R24-S018A, from its Normal to Alternate source. OR (2) Section 7.1.4 have been correctly performed to transfer LPCI Bus, 1R24-S018B, from its Normal to Alternate source.
TASK NUMBER:
027.018 OBJECTIVE NUMBER: 027.018.O PLANT HATCH JTA IMPORTANCE RATING:
RO 3.43 SRO 3.53 K/A CATALOG NUMBER: 262001A403 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.20 SRO 3.40 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
GENERAL
REFERENCES:
Unit 1 Unit 2 34SO-R24-003-1 (current version) 34SO-R24-003-2 (current version)
REQUIRED MATERIALS:
Unit 1 Unit 2 34SO-R24-003-1 (current version) 34SO-R24-003-2 (current version)
APPROXIMATE COMPLETION TIME: 23.0 Minutes SIMULATOR SETUP: N/A
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
The Normal Supply Breaker for the 1A LPCI Bus, 1R24-S018A, must be replaced by maintenance.
- 2.
Electrical power distribution for both units is aligned in a normal full power lineup.
INITIATING CUES:
Transfer 1R24-S018A from its Normal to its Alternate supply per 34SO-R24-003-1.
Plant 3 2015-301 Page 6 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
START TIME:__________
1 Operator identifies the materials that are required.
Operator identifies the required materials and where to obtain them.
- 2. Operator reviews the procedures precautions and limitations.
Operator has reviewed the precautions and limitations.
PROMPT:
IF the Operator asks if 1R24-S018A has been de-energized, INFORM the Operator that 1R24-S018A has NOT been de-energized.
- 3. Open 1R24-S018A normal supply breaker.
(step 7.2.1.1)
The Operator CALLS the Control Room and REQUESTS that a Control Room Operator OPEN the 1R24-S018A normal supply breaker on 1H11-P601.
PROMPT:
AS the Control Room Operator, INFORM the Operator that 1R24-S018A normal supply breaker is open.
- 4. Confirm OFF/Place to OFF 1R26-M108 Disconnect switch.
(step 7.2.1.2)
In the 600V 1CD Transformer Room, the Operator CONFIRMS the 1R26-M108 disconnect switch is in the OFF position.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the task as a PASS, sign, and date record FAIL Above standards not met Mark the task as a FAIL, sign, and date Notify the dept training coordinator for initial trg and applicable continuing trg
(** Indicates critical step)
Plant 3 2015-301 Page 7 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 5. Confirm OFF/Place to OFF 1R26-M077 Disconnect switch.
(step 7.2.1.3)
In the 600 VAC 2C Bus Room, the Operator PLACES the 1R26-M077 disconnect switch to the OFF position.
- 6. Verify that 1R24-S048 is energized.
(step 7.1.2.2)
At 1R22-S006, 1F 4160 VAC Bus (1H11-P652), the Operator CONFIRMS 1R24-S048 is ENERGIZED.
PROMPT:
AS the Control Room Operator, INFORM the Operator that 1R24-S048 has been verified to be energized.
- 7. Confirm the 1R24-S018A Alternate Supply Breaker is CLOSED.
(step 7.1.2.3)
At 1H11-P601 OR in the 1F Switchgear Room, the Operator CONFIRMS that 1R24-S018A Alternate Supply Breaker is CLOSED.
PROMPT:
AS the Control Room Operator or an SO, INFORM the Operator that 1R24-S018A Alternate Supply Breaker has been verified CLOSED.
- 8. Confirm disconnect switch 1R26-M108 is in the OFF position.
(step 7.1.2.4)
In the 1CD 600VAC Transformer Room, the Operator CONFIRMS the 1R26-M108 Disconnect Switch is in the OFF position.
- 9. Confirm disconnect switch 1R26-M109 is in the OFF position.
(step 7.1.2.4)
In the 1CD 600VAC Transformer Room, the Operator CONFIRMS the 1R26-M109 disconnect switch is in the OFF position.
- 10. Confirm 1R24-S048 is energized.
(step 7.1.2.4)
In the 1CD 600VAC Transformer Room, at the 1R26-M107 transfer switch, the Operator CONFIRMS 1R24-S048 Power Available light is ILLUMINATED.
- 11. Place 1R26-M107 transfer switch to 1R24-S018A position.
(step 7.1.2.4)
In the 1CD 600VAC Transformer Room, the Operator PLACES 1R26-M107 transfer switch to 1R24-S018A position.
(** Indicates critical step)
Plant 3 2015-301 Page 8 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 12. Secure the 1R26-M107 transfer switch.
(step 7.1.2.4)
The Operator SECURES 1R26-M107 transfer switch in the correct position using the lock.
- 13. Place to ON 1R26-M108 Disconnect switch.
(step 7.1.2.4)
In the 1CD 600VAC Transformer Room, the Operator PLACES the 1R26-M108 Disconnect switch to the ON position.
- 14. Verify 1R24-S018A is energized.
(step 7.1.2.5)
CONFIRM 1R24-S018A is energized by observing an ILLUMINATED position indication lights (red or green) for 1E11-F015A AND/OR 1E11-F007A.
END TIME:__________
NOTE: The terminating cue shall be given to the Operator when:
With NO reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
(** Indicates critical step)
UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
- 1.
The Normal Supply Breaker for the 1B LPCI Bus, 1R24-S018B, must be replaced by maintenance.
- 2.
Electrical power distribution for both units is aligned in a normal full power lineup.
INITIATING CUES:
Transfer 1R24-S018B from its Normal to its Alternate supply per 34SO-R24-003-1.
Plant 3 2015-301 Page 10 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
START TIME:__________
- 1. Operator identifies the materials that are required.
Operator identifies the required materials and where to obtain them.
- 2. Operator reviews the procedures precautions and limitations.
Operator has reviewed the precautions and limitations.
PROMPT:
IF the Operator asks if 1R24-S018B has been de-energized, INFORM the Operator that 1R24-S018B has NOT been de-energized.
- 3. Open 1R24-S018B normal supply breaker.
(step 7.2.2.1)
The Operator CALLS the Control Room and REQUESTS that a Control Room Operator OPEN the 1R24-S018B normal supply breaker on 1H11-P601.
PROMPT:
AS the Control Room Operator, INFORM the Operator that 1R24-S018B normal supply breaker is open.
- 4. Confirm OFF/Place to OFF 1R26-M109 Disconnect switch.
(step 7.2.2.2)
In the 600V 1CD Transformer Room, the Operator CONFIRMS the 1R26-M109 disconnect switch is in the OFF position.
IF THEN PASS Human performance tools, safety, PPE met (1), AND For initial trg all steps completed correctly OR For continuing trg, critical steps (if used) completed correctly Mark the task as a PASS, sign, and date record FAIL Above standards not met Mark the task as a FAIL, sign, and date Notify the dept training coordinator for initial trg and applicable continuing trg
(** Indicates critical step)
Plant 3 2015-301 Page 11 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 5. Confirm OFF/Place to OFF 1R26-M078 Disconnect switch.
(step 7.2.2.3)
In the 600 VAC 2D Bus Room, the Operator PLACES the 1R26-M078 disconnect switch to the OFF position.
- 6. Verify that 1R24-S048 is energized.
(step 7.1.4.2)
At 1R22-S006, 1F 4160 VAC Bus (1H11-P652), the Operator CONFIRMS 1R24-S048 is ENERGIZED.
PROMPT:
AS the Control Room Operator, INFORM the Operator that 1R24-S048 has been verified to be energized.
- 7. Confirm the 1R24-S018B Alternate Supply Breaker is CLOSED.
(step 7.1.4.3)
At 1H11-P601 OR in the 1F Switchgear Room, the Operator CONFIRMS that 1R24-S018B Alternate Supply Breaker is CLOSED.
PROMPT:
AS the Control Room Operator or an SO, INFORM the Operator that 1R24-S018B Alternate Supply Breaker has been verified CLOSED.
- 8. Confirm disconnect switch 1R26-M108 is in the OFF position.
(step 7.1.4.4)
In the 1CD 600VAC Transformer Room, the Operator CONFIRMS the 1R26-M108 Disconnect Switch is in the OFF position.
- 9. Confirm disconnect switch 1R26-M109 is in the OFF position.
(step 7.1.4.4)
In the 1CD 600VAC Transformer Room, the Operator CONFIRMS the 1R26-M109 disconnect switch is in the OFF position.
- 10. Confirm 1R24-S048 is energized.
(step 7.1.4.4)
In the 1CD 600VAC Transformer Room, at the 1R26-M107 transfer switch, the Operator CONFIRMS 1R24-S048 Power Available light is ILLUMINATED.
- 11. Place 1R26-M107 transfer switch to 1R24-S018B position.
(step 7.1.4.4)
In the 1CD 600VAC Transformer Room, the Operator PLACES 1R26-M107 transfer switch to 1R24-S018B position.
(** Indicates critical step)
Plant 3 2015-301 Page 12 of 12 STEP PERFORMANCE STEP STANDARD SAT/UNSAT (COMMENTS)
- 12. Secure the 1R26-M107 transfer switch.
(step 7.1.4.4)
The Operator SECURES 1R26-M107 transfer switch in the correct position using the lock.
- 13. Place to ON 1R26-M109 Disconnect switch.
(step 7.1.4.4)
In the 1CD 600VAC Transformer Room, the Operator PLACES the 1R26-M109 Disconnect switch to the ON position.
- 14. Verify 1R24-S018B is energized.
(step 7.1.4.5)
CONFIRM 1R24-S018B is energized by observing an ILLUMINATED position indication lights (red or green) for 1E11-F015B AND/OR 1E11-F007B.
END TIME:__________
NOTE: The terminating cue shall be given to the Operator when:
With NO reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
TERMINATING CUE: We will stop here.