Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24005A116 | 5 January 2024 | 301 Exam Comment 2 | |
ML23206A053 | 25 July 2023 | 2A, Exam Draft Items (Hatch 2021-301) | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Loop seal High Radiation Area Half scram Grab sample Water Inventory Control Squib Double blade guide Job Performance Measure Scram Discharge Volume Feedwater Controller Failure MELLLA Severe Accident Management Guideline Earthquake Fuel cladding Offsite Circuit Power change |
ML23206A033 | 25 July 2023 | 2B, Exam Administrative Items (Hatch 2021-301) | Job Performance Measure |
NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And. | 19 May 2023 | SNC Response to Regulatory Issue Summary 2023-01:Preparation And. | |
ML23123A222 | 1 May 2023 | Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 | |
ML21095A313 | 23 March 2023 | 301 Final SRO Written Exam | High winds Scram Discharge Volume Offsite Circuit Power change |
ML22213A050 | 1 August 2022 | 2022 Requalification Program Inspection Notification Letter - Hatch Nuclear Station | |
NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations | 31 March 2022 | SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations | |
ML21333A276 | 29 November 2021 | 302 Exam Approval Letter | |
ML21096A331 | 5 April 2021 | Corporate Notification Letter (Aka 210 Day) | |
ML21095A306 | 5 April 2021 | 301 Final RO Written Exam | High winds Scram Discharge Volume Power change |
ML21057A282 | 24 February 2021 | 301 Exam Approval Letter | |
ML21019A393 | 11 January 2021 | 1 GFE Annual Letter for Fy 2021 | Generic Fundamentals Examination COVID-19 |
NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations | 16 March 2020 | SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations | |
ML20007F757 | 7 January 2020 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 | Generic Fundamentals Examination |
ML19308A459 | 4 November 2019 | Exam Administrative Items (Normal Release) | |
ML19275K870 | 2 October 2019 | 301 Post Exam Comments | |
ML19218A379 | 6 August 2019 | Operator Licensing Written Examination Approval 05000321/2019301 and 05000366/2019301 | |
ML19099A287 | 9 April 2019 | 2019 Schedule Confirmation for Hatch | |
ML19018A088 | 17 January 2019 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 | Generic Fundamentals Examination |
NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations | 23 April 2018 | Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations | |
ML18057B045 | 26 February 2018 | NRC RO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) | Reactor Vessel Water Level High Radiation Area Locked High Radiation Area Power change |
ML18057B051 | 26 February 2018 | NRC SRO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) | Reactor Vessel Water Level Half scram Temporary Modification Overtravel Fire Watch Power change |
ML18086B044 | 16 February 2018 | Facility Cover Letter - Rii - March 2018 - GFE | |
ML18057B080 | 17 October 2017 | Operating Post Examination Comments | Job Performance Measure |
NL-17-1767, Hatch 2017 301 Operating Post Examination Comments | 17 October 2017 | Hatch 2017 301 Operating Post Examination Comments | |
ML17187A227 | 6 July 2017 | Hat 2016-301 Exam Final Items - Delay Release 2 Yrs | Loop seal High Radiation Area Half scram Double blade guide Job Performance Measure Scram Discharge Volume Earthquake Fuel cladding Power change |
ML17187A225 | 6 July 2017 | Hat 2016-301 Exam Draft Items - Delay Release 2 Yrs | Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Half scram Anticipated operational occurrence Water Inventory Control Hydrostatic Double blade guide Job Performance Measure Surveillance Frequency Control Program Scram Discharge Volume Overtravel Earthquake Deep Dose Equivalent Fuel cladding Power change |
ML17187A229 | 6 July 2017 | Hat 2016-301 Exam Administrative Items - Delay Release 2 Yrs | Shutdown Margin Reactor Vessel Water Level Water Inventory Control Fuel cladding |
ML17052A684 | 15 February 2017 | Notification of Licensed Operator Initial Examination 05000321/2017301 and 05000366/2017301 | |
ML17032A279 | 27 January 2017 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
IR 05000321/2016301 | 7 September 2016 | NRC Operator License Examination Report 05000321/2016301 and 05000366/2016301 | High Radiation Area Job Performance Measure |
ML16214A180 | 1 August 2016 | Initial Exam 2016-301 Final RO Written Exam - Delay Release | Reactor Vessel Water Level Fuel cladding |
ML16214A194 | 1 August 2016 | Initial Exam 2016-301 Post Exam Comments - Delay Release | High Radiation Area Locked High Radiation Area |
ML16214A189 | 1 August 2016 | Initial Exam 2016-301 Final SRO Written - Delay Release | Reactor Vessel Water Level Surveillance Frequency Control Program Overtravel Fuel cladding |
ML16166A439 | 13 June 2016 | E.I. Hatch - Operator Licensing Written Examination Approval 05000321/2016301 and 05000366/2016301 | |
ML15176A570 | 22 June 2015 | Initial Exam 2015-301 Final Simulator in Plant JPMs | Time Critical Operator Action |
ML15176A580 | 22 June 2015 | Initial Exam 2015-301 Final Administrative JPMs | Fuel cladding |
ML15176A543 | 22 June 2015 | Initial Exam 2015-301 Final Simulator Scenarios | Ultimate heat sink Grab sample Squib Scram Discharge Volume Power change |
ML15176A541 | 22 June 2015 | Initial Exam 2015-301 Final Administrative Documents | High Radiation Area Stroke time Water Inventory Control Job Performance Measure |
ML15175A463 | 22 June 2015 | Initial Exam 2015-301 Draft Administrative JPMs | Job Performance Measure Fuel cladding |
ML15175A462 | 22 June 2015 | Initial Exam 2015-301 Draft Simulator In-plant JPMs | Job Performance Measure Fuel cladding |
ML15175A458 | 22 June 2015 | Initial Exam 2015-301 Draft Simulator Scenarios | Grab sample Squib Scram Discharge Volume Power change |
ML15175A449 | 22 June 2015 | Initial Exam 2015-301 Draft SRO Written Exam | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Half scram Stroke time Squib Locked High Radiation Area Scram Discharge Volume Fuel cladding Pressure Boundary Leakage Power change Coast down |
ML15175A443 | 22 June 2015 | Initial Exam 2015-301 Draft RO Written Exam | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Half scram Stroke time Squib Locked High Radiation Area Scram Discharge Volume Power change Coast down |
ML15175A429 | 22 June 2015 | Initial Exam 2015-301 Draft Administrave Documents | Water Inventory Control |
ML15223B321 | 21 May 2015 | Initial Exam 2011-301 Draft Simulator Scenarios | Boric Acid Post Accident Monitoring Qualified Offsite Circuit Offsite Circuit |
ML15105A290 | 9 April 2015 | Initial Exam 2015-301 Final SRO Written Exam | High Radiation Area Half scram Stroke time Squib Scram Discharge Volume |
ML15105A284 | 9 April 2015 | Initial Exam 2015-301 Final RO Written Exam | High Radiation Area Half scram Stroke time Squib Scram Discharge Volume |
ML14344A371 | 8 December 2014 | Notification of Licensed Operator Initial Examination 05000321/05000321/2015301 and 05000366/2015301 |