Southern Nuclear Company Operations Training JPM FINAL CRISIM 1 RO ONLY

Title:

START A RECIRC ADJUSTABLE SPEED DRWE (ASD) FROM THE CONTROL ROOM Author: Media Number: Time Anthony Ball 2013-301 SIM 1 30 Minutes Reviewed By Date N/A N/A Reviewed by Instructional Technologist or designee Date N/A N/A Approved By Date C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

Course Number Pro2ram Name Media Number L OPERATIONS TRAINING 2013-301 SIM 1 Rev. No. Date Reason for Revisions Authors Sups Initials Initials 16 02/22/02 Include initial Operator statement RAB RAB 17 05/03/02 Revise Simulator Setup DNM DHG 18 03/01/05 Deleted S from procedure numbers, changed Revision and Rev, numbers BEB DHG to Current Version, changed Reactor Operator to Nuclear Plant Operator, changed IC 121 to IC 127 for Simulator Setup, added new prompts, changed location of some steps and prompts.

19 05/27/05 Revised Initial License statement for successful completion RAB RAB 20 03/30/06 Remove Response Cues RAB RAB 21 01/06/09 This revision is meant for initial training prior to implementation of ASDs DNM RAB on U2 during the 2009 U2 outage. It is the intent of Training & Operations CEB to perform the best training possible gathering feedback from Operators during the process & feeding this information back to Operations prior to implementation to improve procedures prior to final implementation. (Note:

originally a new JPM 04.20 was written, however this JPM was revised to modij the task and TO for the equipment and JPM 04.20 not retained).

Section for Unit One will be simulate in Main Control Room due to modification on simulator to reflect chanees to Unit 2.

22 4-19..1T Revise JPM to reflect Unit 1 modification completion to remove the Recire SDH DNM MG sets and associated equipment and their replacement with the Recirc ASD system. Revised Unit 2 jpm to match actual procedure steps.

23 Revised to match procedure and retitled 3PM to ARB CME 08/16/13 2013-301 CR-SIM 1 for use on ILT-8 NRC Exam.

Once NRC Exam is complete will return to original title.

Line Contributors ie following individuals contributed to the development of this lesson plan.

Rev. No. I List of Contributors

Page 1 of 10 UNIT1 () UNIT2 (X)

TASK TITLE: Start A Recirc Adjustable Speed Drive (ASP) From THE CONTROL ROOM JPM NUMBER 2013-301 SIM 1 TASK STANDARD: The task shall be completed when the Recirculation Motor Adjustable Speed Drive (ASD) has been started and Reactor Recirc Pump is operating at minimum speed, per 34S0-B31-001.

TASK NUMBER: 004.002 OBJECTIVE NUMBER: 004.002.A, 004.002.E PLANT HATCH JTA IMPORTANCE RATING:

RO 3.50 SRO 3.22 K/A CATALOG NUMBER: 202001A401 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.30 SRO 3.10 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL REFERENCES Umt 1 Umt 2 34S0-B3 1-001-2 (current version) 34AB-B3 1-001-2 (current version)

REQUIRED MATERIALS Umt 1 Umt 2 34S0-B3 1-001-2 &

Attachment 5 (current version APPROXIMATE COMPLETION TIME: 30 Minutes

( SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

Page 2 of 10 SIMULATOR SETUP Simulator Initial Conditions: This JPM can only be utilized for a perform for Unit 2.

1. RESET the Simulator to IC #102 and leave in FREEZE or to SNAP 611.
2. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Raise RWL to >47 inches as indicated on GEMAC.

B. Use rfl33 1_29 and open Seal purge valve B3 1-FO16A.

C. OPEN 2B31-FO31A for 10 seconds.

3. TURN SPDS Screens OFF.
4. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
5. ESTIMATED Simulator SETUP TIME: 5 Miiiutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The 2A Reactor Recirc Pump is ready to be started per 34S0-B31-OOl-2.
2. The 2A ASD Cooling Water System has has been running normally for greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
3. All required system/seal venting & purging has been completed.
4. SPDS is out of service.

INITIATG CUES:

Start 2A Recirc Pump, using the normal startup section of 34S0-B3 1-001-2.

2013-301 SIM 1 Page 4 of 10 I STEP I I SAT/UNSAT PERFORMANCE STEP STANDARD

  1. I I (COMMENTS)

For INITIAL Operator Programs:

For OJTIOJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN LI Human performance tools, safety, PPE met (1), AND LI Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI MarktheJPMasa FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:________

1. Operator reviews the procedures Operator has reviewed the precautions and limitations, precautions and limitations.
2. Confirm closed the following RPT At panel 2H1 1-P602, Operator breakers: (step 7.1.2.1.1) has confirmed RPT breakers
    • 3* Depress the ASD A Fault Reset At panel 2H1 1-P602, all pushbutton to reset all ASDfRecirc ASD/Recirc annunciators have annunciators whose conditions have cleared.

cleared. (step 7.1.2.1.2)

PROMPT: IF addressed by the Operator, INFORM the Operator that the ASD Cooling Water System has been in service for a minimum of two hours per Section 7.1.1.1, Startup Of The ASD A Cooling System. (step 7.1.2.1.6)

PROMPT: WHEN the Operator addresses Cooling Water Conductivity, INFORM the Operator, locally at ASD A Cooling Cabinet 2B3 1 -SOO2AG that cooling system conductivity is <1 j.tS. (step 7.1.2.1.7.1)

  • Indicates critical step)

2013-301 SIM 1 Page 5 of 10 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

PROMPT: WHEN the Operator addresses which NXG Computer is in control, INFORM the Operator, the B NXG Computer is in control. (7.1.2.1.7.3)

4. Confirm ASD A COOLING At panel 2H1 1-P602, ASD A NORMAL indicating lamp is COOLING NORMAL light is illuminated, 2H11-P602. illuminated..

(step 7.1.2.1.8)

PROMPT: WHEN the Operator addresses Bypassed Cells, INFORM the Operator there are NO Bypassed Cells. (step 7.1.2.1.9)

5. Confirm open OR open 2B3 1 -F023A, At panel 2H 11 -P602, PUMP Pump Suction Valve (step 7.1.2.1.11) SUCTION VLV, 2B31-F023A is OPEN, red light ONLY illuminated.
6. Confirm running Qstart 2T41-B012, At panel 2H1 l-P657, ASD A Room Cooler, at 2H1 1- CONFIRMS running QB..starts P657. (step 7.1.2.1.12) 2T42-B012, ASD A Room Cooler red light illuminated.

PROMPT: WHEN the Operator addresses ASD Room Cooler 2T41-B012, as the RO, INFORM the Operator that 2T41-B012 is operating.

    • 7 Confirm closed OR close 2B3l- At panel 2H1 1-P602, PUMP FO31A, Pump Discharge Valve. DISCH VLV 2B31-FO31A is (step 7.1.2.1.13) CLOSED, green light ONLY illuminated.
8. Depress the ASD A Shutdown At panel 2H1 1-P602, Depresses pushbutton, to reset the Run Request the ASD A Shutdown pushbutton.

logic. (step 7.1.2.1.14)

    • 9 Position the ASD A control switch, At panel 2H1 l-P602, ASD 2B3 1-SOO2A to START. STARTED, red light illuminated.

(step 7.1.2.1.15)

  • Indicates critical step)

2013-301 SIM 1 Page 6 of 10 I STEP I SAT/UNSAT PERFORMANCE STEP

  1. t STANDARD I (COMMENTS) 1
10. Confirm the following: At panel 2H1 1-P602, the Operator VERIFIES:

The ASD A PRE-CHARGING light The ASD A PRE-CHARGING illuminates. (step 7.1.2.1.16.1) light illuminates.

After 30 seconds, the ASD A PRE- After 30 seconds, the ASD A CHARGING light extinguishes. PRECHARGING light (step 7.1.2.1.16.2) extinguishes.

The ASD A Input Breaker CLOSES The ASD A Input Breaker (the red light above the ASD A CLOSES (the red light above the control switch illuminates and the ASD A control switch illuminates green light extinguishes). and the green light extinguishes).

(step 7.1.2.1.16.3)

The ASD A START pushbutton light The ASD A START pushbutton illuminates. (step 7.1 .2.1 .16.4) light illuminates.

RECIRC A FLOW LIMIT, (602-134) Acknowledges 602-134 alarm.

PROMPT: IF addressed by the Operator, INFORM the Operator that a CRD Pump is in service to supply Seal Purge Flow. (step 7.1.3.1.2)

PROMPT: IF addressed by the Operator, INFORM the Operator that Seal Purge Isolation Valve 2B31-FO16A is open. (step 7.1.3.1.3)

PROMPT: IF addressed by the Operator, INFORM the Operator it is not required to vent the Recirc pump seals. (step 7.1.3.1.4)

11. Confirm open OR open 2B3 l-F023A, At panel 2H1 l-P602, PUMP Pump Suction Valve. (step 7.1.3.1.6) SUCTION VLV, 2B31-F023A is OPEN, red light ONLY illuminated.

PROMPT: WHEN the Operator addresses the Seal Flow Regulator, as the SO, INFORM the Operator that it is set at 2 gpm. (step 7.1.3.1.7)

PROMPT: WHEN the Operator addresses the status of the other recirc loop, as the SS, INFORM the Operator that the other loop is in operation. (step 7.1.3.1.9)

  • Indicates critical step)

2013-301 SIM 1 Page 7 of 10 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

12. Confirm reactor water level is > +32 At panel 2H1 1-P603, the inches, panel 2H1 1-P603. Operator VERIFIES that RWL is (step 7.1.3.1.10) greater than +32 inches.
13. Operator completes required portions Attachment 5 has been completed of Attachment 5 of procedure. through step 7.1.

(step 7.1.3.1.11)

PROMPT: INFORM the operator that another operator has completed the applicable portions of Attachment 5 and are acceptable, 2 minutes ago.

14. Confirm CLOSED 2B31-FO31A, At panel 2H1 1-P602, PUMP Pump Discharge Valve. DISCH VLV 2B3 1 -F03 1 A is (step 7.1.3.1.12) CLOSED, green light ONLY illuminated.
15. CONFIRM ASD A START At panel 2H1 1-P602, CONFIRM pushbutton indicating light is ASD A START pushbutton illuminated. (step 7.1.3.1.13) indicating light is illuminated.

PROMPT: WHEN the Operator addresses the status of the recirc loop startup temperatures, as the RO, INFORM the Operator that the temperatures are still acceptable. (step 7.1.3.1.14)

  • Indicates critical step)

2013-301 SIM 1 Page 8 oflO STEP PERFORMANCE STEP STANDARD I (COMMENTS)J

  • *16. Just prior to pump start, At panel 2H1 1-P602, ASD A visually (reference Special START PUSH BUTTON, is Requirement 4.3.6) confirm the Pump depressed.

Startup Temperature limits are still acceptable, THEN depress the ASD A START pushbutton indicating lamp AND (step 7.1.3.1.14)

(*

  • Indicates critical step)

2013-301 SIM 1 Page 9 of 10 I STEP I I PERFORMANCE STEP STANDARD SAT/UNSAT 1 I (COMMENTS) ]

17. Confirm the following: At panel 2H1 l-P602, the Operator VERIFIES:

The ASD A STARTING indicating The ASD A STARTING light lamp illuminates. (step 7.1.3.1.14.1) illuminates.

The ASD A START pushbutton The ASD A START pushbutton indicating lamp extinguishes light extinguishes.

(step 7.1.3.1.14.2) 2B3 1 -F03 1 A, Recirc Pump A 2B3 1-F03 1A, Recirc Pump A Disch Disch Vlv, starts to JOG OPEN 2 Vlv, starts to JOG OPEN 2 seconds seconds after the ASD A after the ASD A STARTING light STARTING light illuminates illuminates.

(step 7.1.3.1.14.3) The ASD A speed increases to 370 RPM on 2B31-R660A and 22% on 2B3 1 -R66 1 A in about 4 The ASD A speed increases to 370 seconds.

RPM on 2B3 I -R660A and -22% on 2B3 1 -R66 1 A in about 4 seconds.

(step 7.1.3.1.14.4) The ASD A RUNNING light illuminates.

The ASD A RUNNiNG indicating lamp illuminates The ASD A STARTING indicating light extinguishes.

(step 7.1.3.1.14.5)

Recirc A Flow, indicates 11,000 -

The ASD A STARTING indicating 13,000 GPM on 2B31-R617.

light extinguishes.

(step 7.1.3.1.14.6) 2B3 1 -F03 1 A, Recirc Pump A 2B31-FO31A, Recirc Pump A Disch Disch Vlv, is FULL OPEN <96 Vlv, is FULL OPEN <96 seconds seconds after the Recirc ASD A after the Recirc ASD A STARTING STARTING light illuminates.

light illuminates. (step 7.1.3.1.14.7)

Recirc A Flow, indicates 11,000 -

13,000 gpm on 2B31-R617, Drive Flow. (step 7.1.3.1.14.8)

(** Indicates critical step)

2013-301 SIM 1 Page 10 of 10 I STEP I I SAT!UNSAT I PERFORMANCE STEP STANDARD

  1. I I (COMMENTS
18. Complete remainder of Attachment 5. Attachment 5 has been completed (step 7.1.3.1.15) through Step 7.4.

PROMPT: IF addressed by the Operator, INFORM the Operator that the remaining portions of Attachment 5 have been completed.

19. Confirm 2B31-R603A, No. 1 Seal A At panel 2H1 1-P602, the pressure indicator, is WITHIN 50 psig Operator has VERIFIED that of reactor pressure. (step 7.1.3.1.16) Pump 2A No. 1 Seal pressure on 2B31-R603A is within 50 psig of Reactor pressure.
20. Confirm 2B31-R602A, No. 2 Seal A At panel 2H1 1-P602, the pressure indicator, is WITHIN 50 psig Operator VERIFIES that Pump of one half of reactor pressure. 2A No. 2 Seal pressure on (step 7.1.3.1.17) 2B31-R602A is within 50 psig of one half of Reactor pressure.

PROMPT: IF addressed by the Operator, INFORM the Operator the STA will perform applicable sections of 34SV-SUV-023-2 (step 7.1.3.1.18)

PROMPT: IF addressed by the Operator, INFORM the Operator the Single Loop Operation was never enabled for the APRMs. (step 7.1.3.1.20)

PROMPT: IF addressed by the Operator, INFORM the Operator the STA will evaluate core conditions per 34SV-SUV-020-0, AND verify Recirc Loop Active/Inactive status on the process computer. (step 7.1.3.1 .21)

END TIME:

NOTE: The terminating cue shall be given to the Operator when:

After JPM step #20 is complete.

With NO reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

Southern Nuclear Company Operations Training JPM FINAL CRISIM 2 ALL Title PERFORM A MANUAL STARTUP OF THE CORE SPRAY SYSTEM WITH 1ST VALVE FAILURE uthor: Media Number: Time Anthony BalI 2013-301 SIM 2 8.0 Minutes Reviewed By Date N/A N/A Reviewed by Instructional Technologist or designeed. Date N/A N/A Approved By Date C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

Course Number Program Name Media Number L OPERATIONS TRAINING 2013-301 SIM 2 Rev. No. Date Reason for Revisions Authors Sups Initials Initials This JPM was created from LR-JP-08.02 for ILT-8 00 08/16/13 ARB CME NRC Exam. Modified 1PM with failure of the 1st CS valve attempted to open. After this exam will be changed to a new LR JPM number.

Line Contributors The following individuals contributed to the development of this lesson plan.

Rev. No. List of Contributors

2013-301 SIM 2 Page 1 of8 UNIT1 ( ) UNIT2 (X)

TASK TITLE: PERFORM A MANUAL STARTUP OF THE CORE SPRAY SYSTEM WITH 1ST VALVE FAILURE JPM NUMBER: 2013-301 SIM 2 TASK STANDARD: The task shall be completed when the operator has started the second loop of the Core Spray System manually and the system is aligned for injection to the Reactor with loop flow greater than 950 gpm per 34S0-E21-001-2.

TASK NUMBER: 008.002 OBJECTiVE NUMBER: 008.002.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.80 SRO 3.42 K/A CATALOG NUMBER: 20900 1A405 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.80 SRO 3.60 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 34S0-E2 1-001-2 (current version) 31 EO-EOP-01 0-2 (current version)

REQUIRED MATERIALS: Unit 2 34S0-E21-001-2 (current version)

APPROXIMATE COMPLETION TIME: 8.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2013-301 SIM2 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to 75% RTP OR SNAP 612 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfB2l_123A Steam Line Break in the Drywell 00000 mfE2l_202A Core Spray LOCA Signal Failure 00000 mfEl 1_202B RHR LOCA Signal Failure 00000 mfN2l_79A Condensate Pump A Trip 00000 mfN2l_79B Condensate Pump B Trip 00000 mfN2l_79C Condensate Pump C Trip 00000 mfE4l_104 HPCI Turbine Trip 00000 mfE5l 110 RCIC Turbine Trip 00000 ACTIVATE THE FOLLOWING EVENT TRIGGERS:

Trigger # DESCRIPTION CONDITIONS Expert Command E21-7 2E21-FOO5B fails close, FOO5A works E21-8 2E21-FOO5A fails close, FOO5B works ORS OVERRIDES:

Activator TAG # S/MJL DESCRIPTION Final Ramp Delay Value Rate ST-O diE2 1 -FOO5A S Core Spray A Inboard Disch Valve Close ST-O diE2l-FOO5B S Core Spray B Inboard Disch Valve Close

3. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Allow to run until Reactor pressure is approximately 150 psig.

B. Acknowledge annunciators.

4. PLACE the Simulator in FREEZE until the crew assumes the shift.
5. ESTIMATED Simulator SETUP TIME: 10 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 has had a LOCA. RWL is less than -101 inches and Reactor pressure is less than 350 psig.
2. Core Spray Logic has failed.
3. 31E0-EOP-010-2 (RC) is in progress.

INITIATING CUES:

Start Core Spray AND Inject to the reactor to maintain

+3 to +50 inches RWL.

2013-301 SIM2 Page 4 of 8 i STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:

NOTE: If the operator starts first with the A Loop of Core Spray, perform Steps 1 10.

If the operator starts first with the B Loop of Core Spray, perform Steps 11 20.

1. Operator identifies the procedure Operator has identified the correct needed to perform the task. procedure as 34SO-E21-001-2 or placard.
2. Start Core Spray Pump 2A. At panel 2H1 1-P601, CORE (placard step 1) SPRAY PUMP, 2E21C001A, is RUNNING, red light illuminated.
3. Confirm Core Spray Pump discharge At panel 2H1 1-P601, operator pressure is greater than 265 psig. VERIFIES DISCH PRESS is (placard step 2) greater than 265 psig on indicator 2E2 1 -R600A.

(** Indicates critical step)

2013-30 1 SIM 2 Page 5 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

4. WHEN reactor pressure is less than or At panel 2H 11 -P601, Recognizes equal to 425 PSIG, fully open 2E21- the Core Spray Pump 2A FOO5A, Inbd Discharge Valve. Discharge Valve, 2E2 1 -FOO5A (placard step 3) will NOT OPEN when Reactor pressure is less than 425 psig, green light ONLY illuminated.

NOTE: The operator may inform the Shift Supervisor of the valve failure at this time or may continue with placing the other ioop of Core Spray in service and then notify the Shift Supervisor. (EITHER is acceptable)

    • 5* Start Core Spray Pump 2B. At panel 2H1 1-P601, CORE (placard step 1) SPRAY PUMP, 2E21C001B, is RUNNING, red light illuminated.

PROMPT: WHEN the operator addresses discharge pressure, INDICATE for the operator that pump discharge pressure is greater than 265 psig.

6. Confirm Core Spray Pump discharge At panel 2H1 1-P601, operator pressure is greater than 265 psig. VERIFIES DISCH PRESS is (placard step 2) greater than 265 psig on indicator 2E21 -R600B.
    • 7 WHEN reactor pressure is less than or At panel 2H1 1-P601, INBD equal to 425 PSIG, fully open 2E21- DISCH VLV, 2E21-FOO5B, is FOO5B, Inbd Discharge Valve. OPEN, red light illuminated.

______ (placard step 3)

NOTE: If adequate core cooling exists, it is acceptable for the FOO5B valve to be left in mid position to prevent exceeding rated pump flow.

NOTE: Valve, 2E2l-FO31B, auto closes when flow exceeds 950 gpm.

8. Confirm the Minimum Flow Valve, At panel 2H1 1-P601, the operator 2E2 1 -F03 1 B closes when flow is VERIFIES when DISCH FLOW,

>950 gpm. 2E2l-R601 is greater than 950 (placard step 4) gpm, MIN FLOW VLV, 2E21-FO31B is CLOSED, green light ONLY illuminated.

9. Throttles 2E21-FOO5B as necessary At panel 2H1 l-P601, the operator (placard step 5) throttles 2E21-FOO5B to maintain RWL +3 to +50 inches.
  • Indicates critical step)

2013-301 SIM2 Page 6 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

NOTE: The operator may delay performing the following step due to controlling RWL.

10. Confirms a Core Spray and RHR At panel 2H1 1-P654, the operator room cooler automatically starts. has confirmed that a CORE (placard step 6) SPRAY and RHR ROOM COOLER have started, red light illuminated.

PROMPT: IF the operator addresses RWL, as the Shift Supervisor, INFORM the operator to maintain RWL between +3 to +50 inches.

PROMPT: IF the operator addresses shutting down the Core Spray System, as the Shift Supervisor, INFORM the operator that this is NOT desired at this time.

11. Operator identifies the procedure Operator has identified the correct needed to perform the task. procedure as 34SO-E21-00l-2.
12. Starts Core Spray Pump 2B. At panel 2H1 l-P601, CORE (placard step 1) SPRAY PUMP, 2E21C001B, is RUNNING, red light illuminated.
13. Confirm Core Spray Pump discharge At panel 2H1 l-P601, operator pressure is greater than 265 psig. VERIFIES DISCH PRESS is (placard step 2) greater than 265 psig on indicator 2E2 1 -R600B.
14. Recognizes the Core Spray Pump At panel 2H1 1-P601, INBD 2B Discharge Valve, 2E21-FOO5B DISCH VLV, 2E21-FOO5B, is will NOT OPEN when Reactor CLOSE, green light ONLY pressure is less than 425 psig. illuminated.

(placard step 3)

NOTE: The operator may inform the Shift Supervisor of the valve failure at this time or may continue with placing the other loop of Core Spray in service and then notify the Shift Supervisor. (EITHER is acceptable)

    • 15. Starts Core Spray Pump 2A. At panel 2H1 l-P601, CORE (placard step 1) SPRAY PUMP, 2E21C001A, is RUNNING, red light illuminated.
  • Indicates critical step)

2013-301 SIM2 Page 7 of 8 STEP

/ PERFORMANCE STEP STANDARD I (COMMENTS)

PROMPT: WHEN the operator addresses discharge pressure, INDICATE for the operator that pump discharge pressure is greater than 265 psig.

16. Confirm Core Spray Pump discharge At panel 2H11-P601, operator pressure is greater than 265 psig. VERIFIES DISCH PRESS is (placard step 2) greater than 265 psig on indicator 2E2 1 -R600A.
    • 17. Opens the Core Spray Pump 2A At panel 2H1 1-P601, 1NBD Discharge Valve, 2E21-FOO5A when DISCH VLV, 2E21-FOO5A, is Reactor pressure is less than 425 psig. OPEN, red light illuminated.

(placard step 3)

NOTE: If adequate core cooling exists, it is acceptable for the FOO5A valve to be left in mid position to prevent exceeding rated pump flow.

NOTE: Valve, 2E21-FO31A, auto closes when flow exceeds 950 gpm.

18. Verify the Minimum Flow Valve, At panel 2H1 l-P601, the operator 2E2 1 -F03 1 A closes when flow is VERIFIES when DISCH FLOW,

>95Ogpm. 2E21-R601 is greater than 950 (placard step 4) gpm, M1N FLOW VLV, 2E21-FO31A is CLOSED, green light ONLY illuminated.

19. Throttles 2E21-FOO5A as necessary At panel 2H1 1-P601, the operator (placard step 5) throttles 2E2l-FOO5A to maintain RWL +3 to +50 inches.

NOTE: The operator may delay performing the following step due to controlling RWL.

20. Confirms Core Spray and RHR room At panel 2H1 l-P657, the operator cooler automatically starts. has confirmed that a CORE (placard step 6) SPRAY and RHR ROOM COOLER have started, red light illuminated.

PROMPT: IF the operator addresses RWL, as the Shift Supervisor, INFORM the operator to maintain RWL between +3 to +50 inches.

(*

  • Indicates critical step)

2013-301 SIM 2 Page 8 of 8 STEP j PERFORMANCE STEP STANDARD I (COMMENTS) 1 PROMPT: IF the operator addresses shutting down the Core Spray System, as the Shift Supervisor, INFORM the operator that this is NOT desired at this time.

END TIME:________

NOTE: The terminating cue shall be given to the operator when:

When the operator completes through step 10 or through step 20.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

Operator is controlling RWL and slowly bringing RWL to

+3 to +50 inches.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM FINAL CRISIM 3 RO & SRO-I TITLE EMERGENCY DEPRESS THE REACTOR USING THE HEAD VENTS/DRYWELL COOLERS AUTHOR MEDIA NUMBER Anthony Ball 2013-301 SIM 3 10 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2013-301 SIM 3 Rev. No. Date Reason for Revision Authors Supvs Initials Initials 00 08/05/96 Initial development RAB DHG 01 03/05/99 Revised due to new simulator computer. SCB DHG 02 03/13/00 Format modification, change time allowance based on DHG running, modify title 03 11/06/00 Include objective number RAB DHG 04 03/19/02 Include initial operator statement RAB RAB 05 06/21/05 Revised Initial License statement for successful RAB RAB completion 06 05/08/06 Remove Response Cues RAB RAB 07 10/09/09 Revised for use on 2009-302 Exam FNF CME 08 08/16/13 Revised to match procedure and retitled for ILT-8 ARB CME NRC Exam. Once exam is complete will retitle back to LR-JP-20198.

2013-301 SIM 3 Page 1 of7 UNIT 1 ( ) UNIT2 (X)

TASK TITLE: EMERGENCY DEPRESS THE REACTOR USING THE HEAD VENTS/DRYWELL COOLERS JPMNUMBER: 2013-301 SIM3 TASK STANDARD: The task shall be complete when the operator has initiated the emergency depress process with the Head Vents/Drywell Coolers, per 31EO-EOP-108-2.

TASK NUMBER: 201.098 OBJECTIVE NUMBER: 201.098.A PLANT HATCH JTA IMPORTANCE RATING:

RO 4.57 SRO 3.66 K/A CATALOG NUMBER: 295025A1.01 K/A CATALOG JTA IMPORTANCE RATING:

RO 2.9 SRO 3.0 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 3 1EO-EOP-108-2 34S0-T47-00 1-2 34S0-T48-002-2 REQUIRED MATERIALS: Unit 2 31E0-EOP-108-2 34S0-T47-001 -2 34SO-T48-002-2 APPROXIMATE COMPLETION TIME: 10 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2013-301 SIM 3 Page 2 of 7 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to SNAP 613 OR IC #113 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL DELAY ACT.

VALUE TIME TIME mfB2ll29B Main Steam Relief Valve B Fails Stuck 00000 mfB2ll29C Main Steam Relief Valve C Fails Stuck 00000 mfB2ll29D Main Steam Relief Valve D Fails Stuck 00000 mfB2l_129E Main Steam Relief Valve B Fails Stuck 00000 mfB2ll29F Main Steam Relief Valve F Fails Stuck 00000 mfB2ll29G Main Steam Relief Valve G Fails Stuck 00000 mfB2ll29H Main Steam Relief Valve H Fails Stuck 00000 mfB2ll29K Main Steam Relief Valve K Fails Stuck 00000 mf132ll29L Main Steam Relief Valve L Fails Stuck 00000 mf1321_129M Main Steam Relief Valve M Fails Stuck 00000

3. INSERT the following OVERRIDES (SVO) & (10):

SVO # DESCRIPTION FINAL RAMP ACT.

VALUE RATE TIME svoT48 140 Water Level in Torus 1 15 100 00000 diB2 1 -FO 1 3A Auto Relief SRV A AUTO

4. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS rfP64_330 Drywell Chillers BOO6A & B LOCAILOSP Trip Links BYPASS rfP64_331 Drywell Chillers BOO6B LOCAILOSP Trip Links BYPASS

2013-301 SIM 3 Page3 of7

5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. On 2H1 1-P700 place the key switch for the Drywell Chillers to Override B. On 2H1 1-P654 and P657, place keyswitchs for Drywell Fans to Override C. Perform RC-l, RC-2, and TC-1 and RWL to the normal band.

D. Reset the Group 2 isolation.

E. Prevent a further Group 2 by starting RCIC to maintain level >3 (SRV A will be cycling)

F. Close the MSIVs G. Place ALL SRV switches to OPEN H. Place HPCI in service in Auto, injecting at 750 gpm.

The SIMULATOR OPERATOR WILL CONTROL HPCI INJECTION TO MAINTAIN

+3 TO +50 INCHES RWL.

I. Acknowledge annunciators.

6. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
7. ESTIMATED Simulator SETUP TIME: 20 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A seismic event has caused a small steam leak in the drywell and an unisolable leak in the Torus.
2. Attempts to raise Torus water level have been unsuccessful.
3. 31 EO-EOP-O 12-2 (PC) is in progress.
4. The Reactor has been shutdown.
5. The Shift Supervisor has determined that the plant cannot be maintained in the SAFE Region of the Heat Capacity Temperature Limit and decided to Emergency Depress the Reactor.
6. 31E0-EOP-015-2 (CP-1) is in progress.
7. An attempt was made to Emergency Depress with the SRVs, but they have failed to open.
8. Other methods of Alternate Emergency Depress have been unsuccessful.
9. Drywell Chillers and Fans have been placed in service per 34S0-P64-OO1-2 with the LOCA trips overridden.
10. The Group 2 isolation has been reset.
11. Standby Gas Treatment System is running with suction from the Reactor Building & Refueling Floor per 34SO-T46-OO1-2.

INITIATING CUES:

Depressurize the Reactor using the Head Vents/Drywell Coolers per 31 EO-EOP-1 08-2.

2013-301 SIM 3 Page 5 of 7 I STEP I PERFORMANCE STEP I SATIUNSAT I # I STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN LI Human performance tools, safety, PPE met(1), AND LI Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:________

1. Obtain the procedure needed to Operator obtains 31E0-EOP-108-2. SAT / UNSAT perform the task.
2. Place all available DW Chillers and Recognizes that all DW Chillers SAT I UNSAT Fans in service and Fans in service from initial (31EO-EOP-108-2 step 3.9.1) conditions or by observing red lights illuminated on 2H1 1-P654 and 2H1 1-P657.
3. Obtain the procedure needed to Operator obtains 34SO-T48-002-2 SAT / IJNSAT perform the task. or placard to vent the drywell.

( 31E0-EOP-108-2 step 3.9.3)

NOTE: Only one ioop is critical and needs to be vented.

Steps 4-6 are for the A side and steps 7-9 are for the B side.

NOTE: The operator may use the placard or 34SO-T48-002-2 to vent the Drywell.

    • 4 OPEN 2T48-F334A, Drywell Vent At 2H1 1-P657, the operator places SAT! UNSAT / NA Isol Vlv. the control switch for 2T48-F334A, (34S0-T48-002-2 step 7.1.3.2.1.1) Drywell Vent Isol Vlv to OPEN.
  • Indicates critical step)

2013-301 SIM 3 Page 6 of 7 STEP PERFORMANCE STEP I SAT/UNSAT STANDARD I (COMMENTS)

    • 5 OPEN 2T48-F335A, Drywell Vent At 2H1 1-P657, the operator places SAT / UNSAT / NA Isol Vlv. the control switch for 2T48-F335A, (34S0-T48-002-2 step 7.1.3.2.1.2) Drywell Vent Isol Vlv to OPEN.
    • 6 OPEN 2T48-F336A, Drywell Vent At 2H11-P657, the operator SAT / UNSAT / NA Flow Cntl Vlv. increases the controller output on (34S0-T48-002-2 step 7.1.3.2.1.3) 2T48-R615A, Drywell Flow Controller for F336A with demand greater than zero.
    • 7 OPEN 2T48-F334B, Drywell Vent At 2H1 1 -P654, the operator places SAT/UNSAT/NA Isol Vlv. the control switch for 2T48-F334B, Drywell Vent Isol Vlv to OPEN.

(34S0-T48-002-2 step 7.1.3.2.2.1)

    • 8 OPEN 2T48-F335B, Drywell Vent At 2H1 1-P654, the operator places SAT /UNSAT/NA Isol Vlv. the control switch for 2T48-F335B, (34S0-T48-002-2 step 7.1.3.2.2.2) Drywell Vent Isol Vlv to OPEN.
    • 9 OPEN 2T48-F336B, Drywell Vent At 2H1 1-P654, the operator SAT / UNSAT I NA Flow Cntl Vlv. increases the controller output on (34SO-T48-002-2 step 7.1.3.2.2.3) 2T48-R6 1 5B, Drywell Flow Controller for F336B with demand greater than zero.
10. At 2H1 1-P602, Place the following At 2H1 1-P602, DRYWELL SUMP pump control switches to PULL TO CONTROLS, the operator places LOCK: the following pump control (31EO-EOP-108-2 step 3.9.4) switches are in PULL TO LOCK:

. D/W Equipment Drain pump

  • DIW Equipment Drain pump SAT I IJNSAT 2G1 1-COO6A 2G1 1-COO6A
  • DIW Equipment Drain Pump
  • D/W Equipment Drain Pump SAT I UNSAT 2G1 l-COO6B 2G1 1-COO6B e D/W Floor Drain Pump

. D/W Floor Drain Pump

  • Indicates critical step)

2013-301 SIM 3 Page 7 of 7 I STEP I I SAT/UNSAT PERFORMANCE STEP I#1 STANDARD I (COMMENTS)

    • 11. At 2H1 1-P602, OPEN Reactor Head At 2H1 l-P602, RX HEAD SAT / UNSAT Vent valve, 2B21-F004. VENTS, VENT VLV,

( 31E0-EOP-108-2 step 3.9.5) 2B21-F004 is OPEN, red light ONLY illuminated.

( 31EO-EOP-108-2 step 395) 2B21-F003 is OPEN, red light ONLY illuminated.

PROMPT: IF system restoration is addressed by the operator, as the Shift Supervisor, INFORM the operator that system restoration is not desired at this time.

END TIME:________

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 12.

With NO reasonable progress, the operator exceeds double the allotted time.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM FINAL CR/SIM 4 RO & SRO4 TITLE PERFORM A MANUAL INITIATION OF LPCI (IF IN SHUTDOWN COOLING)

AUTHOR MEDIA NUMBER TIME Anthony BalI 20 13-301 SIM 4 15 Minutes RECOMMEN1ED BY N/R C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

SOUThERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2013-301 SIM 4 Rev. No. Date Reason for Revision Authors Supvs Initials Initials 01 08/16/13 Renumbered to 2013-301 Sim 4 for 1LT-8 NRC ARB CME Exam. This JPM will be renumbered after NRC Exam.

2013-301 SIM 4 Page 1 of 8 UNIT 1 () UNIT2 (X)

TASK TITLE PERFORM A MANUAL INITIATION OF LPCI (IF IN SHUTDOWN COOLING)

JPM NUMBER: 2013-301 S1M4 TASK STANDARD: The task shall be completed when the RHR ioop previously in the shutdown cooling mode is aligned for LPCI, with both pumps running and injecting to the Reactor at approximately 17,000 gpm, as indicated on 2E1 1-R603A, per 34S0-E11-010.

TASK NUMBER: 006.008 OBJECTIVE NUMBER: 006.008.O PLANT HATCH JTA IMPORTANCE RATING:

RO 4.33 SRO 3.76 K/A CATALOG NUMBER: 203000A405 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.30 SRO 4.10 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)/Senior Reactor Operator (SRO)

GENERAL

REFERENCES:

Unit 2 34S0-E1 1-010-2 (current version)

REQUIRED MATERIALS: Unit 2 34S0-E1 1-010-2 (current version)

APPROXIMATE COMPLETION TIME: 15 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2013-301 SIN 4 Page 2 of 8 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to SNAP 614 OR IC #102 and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mfG3l_242 RWCU Non-Isol Leak 5 100 99999 mfEl i_i 15B RHR Pump B Trip 00000 mfEll_115D RHRPumpD Trip 00000 mfE2l_202A Core Spray LOCA Signal Failure 00000

3. INSERT the following ORS OVERRIDES:

TAG # P/L DESCRIPTION STATUS diE2l-COOIA P Core Spray Pmp IA STOP 00000 diE2l-COO1B P Core Spray Pmp B STOP 00000 diEl 1-FOO7A P Mm Flow Bypass Valve CLOSE 00000 diEl 1-F028A P RHR A Torus Spray/Test Vlv CLOSE 00000 diEl 1-FO16A P Contmt Spray Outboard Drywell CLOSE 00000 loEl 1-FOO7AG1 L Mm Flow Bypass Valve OFF 00000 loEl 1-FOO7AR2 L Mm Flow Bypass Valve OFF 00000 loEl 1-FO28AG1 L RHR A Torus Spray/Test Vlv OFF 00000 loEl 1-F028AR2 L RHR A Torus Spray/Test Vlv OFF 00000 loEl 1-FO16AG1 L Contmt Spray Outboard Drywell OFF 00000 loEl 1-FO16AR2 L Contmt Spray Outboard Drywell OFF 00000

4. INSERT the following REMOTE FUNCTIONS:

DESCRIPTION STATUS 2E1 1-FO15A/B Override Jumper And Links Override

(*

  • Indicates critical step)

2013-301 SIM 4 Page 3 of 8

5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Place RHR Loop A into Shutdown Cooling.

B. Activate malfunction mfG31242 and allow to run until LOCA Signal is received.

C. Allow Sim to run until 2E1 1-F048A LOCA timer times out, then place 2E1 1-F048A control switch to close to close valve. Once closed reposition switch to mid position.

D. MODIFY mfG3 1_242 to Final 1 to limit the RWL reduction.

E. Acknowledge annunciators.

6. PLACE the Simulator in FREEZE until the crew assumes the shift.
7. PLACE DANGER TAGS on the following equipment:

MPL # COMPONENT TAGGED POSITION 2E1 l-FOO7A Mm Flow Bypass Valve CLOSED 2E1 1-F028A Torus Spray Or Test Vlv CLOSED 2E1 1-FO16A Cmt Spray Outboard Vlv CLOSED

8. ESTIMATED Simulator SETUP TIME: 20 Minutes

(*

  • Indicates critical step)

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 is shutdown.
2. RHR loop 2A was in the Shutdown Cooling mode with RHR Pump 2A in service.
3. Both Core Spray System Pumps are inoperable.
4. HPCI and RCIC are isolated on low steam supply pressure.
5. A LOCA has occurred and 3 1EO-EOP-O1O-2 (RC) is in progress.
6. RHR Pumps 2B and 2D are inoperable.

INITIATING CUES:

Place RHR Loop A in the LPCI Mode and inject to the Reactor.

2013-301 SIM4 Page 5 of 8 I STEP 1 I SAT/UNSAT 1 PERFORMANCE STEP I#1 STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Mark the JPM as a PASS For initial trg all steps completed correctly OR PASS 1 For continuing trg, critical steps (if used) completed correctly FAIL Above standards not met IJ Markthe JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-01 -0685 Section 6.5.3 provides examples)

START TIME:________

1. Operator identifies the procedure Operator has identified the correct needed to perform the task. procedure as 34SO-E1 1-010-2.
2. Confirm RHRSW pumps are tripped At panel 2H 11 -P601, SERVICE (step 7.4.9.2). WATER PUMPS, 2El 1-COO 1A/B/CID are TRIPPED, green lights illuminated.

NOTE: IF the RHR Pumps AUTO trip, with an Auto Initiation Signal present, the pumps Anti-Pumping Logic, will result in NO light indication for the pumps.

3. Confirm RHR pumps are tripped At panel 2Hl 1-P601, the (step 7.4.9.4.1). following pumps are TRIPPED, neither green nor red lights are illuminated: RHR PUMPS, 2E1 1-COO2A/C
4. Confirm/close Shutdown Cooling At panel 2H1 l-P601, SDC Suction Valve, 2E1 1-FOO8 SUCTION VLV, 2E1 1-FOO8, is (step 7.4.9.4.2). CLOSED, green light ONLY illuminated.

(** Indicates critical step)

STEP PERFORMANCE STEP STANDARD I (COMMENTS)

5. Confirm/close Shutdown Cooling At panel 2H1 1-P602, SDC Suction Valve, 2E1 1-F009 SUCTION VLV, 2E1 1-F009, is (step 7.4.9.4.3). CLOSED, green light ONLY illuminated.
    • 6. Close Shutdown Cooling Suction At panel 2H1 1P60l, the Valve, 2E1 l-FOO6A following valve is CLOSED, (step 7.4.9.4.4). green light ONLY illuminated:

SHUTDOWN COOLING VLV, 2E1 l-FOO6A

    • 7 Close Shutdown Cooling Suction At panel 2H11-P601, the Valve, 2E1 1-FOO6C following valve is CLOSED, (step 7.4.9.4.4). green light ONLY illuminated:

SHUTDOWN COOLING VLV, 2E1 l-FOO6C

8. Confirm/open Torus Suction Valve, At panel 2H11-P601, TORUS 2E11-F065A (step 7.4.9.4.5). SUCTION VLV, 2E11-F065A, is OPEN, red light ONLY illuminated.
9. Confirm/open Torus Suction Valve, At panel 2H1 lP60l, TORUS 2E1 1-F065C (step 7.4.9.4.5). SUCTION VLV, 2E1 1-F065C, is OPEN, red light ONLY illuminated.

NOTE: Valve in Step 6 must be closed, green light ONLY, before valve in Step 10 will open.

Valve in Step 7 must be closed, green light ONLY, before valve in Step 11 will open.

  • *10. Open Torus Suction Valve, At panel 2H1 1-P601, the 2E1 1-FOO4A (step 7.4.9.4.6). following valve is OPEN, red light ONLY illuminated:

TORUS SUCTION VLV, 2E1 l-FOO4A

    • .11. Open Torus Suction Valve, At panel 2H1 1-P601, the 2E1 1-FOO4C (step 7.4.9.4.6). following valve is OPEN, red light ONLY illuminated:

TORUS SUCTION VLV, 2E1 1-FOO4C

(*

  • Indicates critical step)

2013-301 SIM4 Page 6 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

5. Confirm/close Shutdown Cooling At panel 2H1 1-P602, SDC Suction Valve, 2E1 1-F009 SUCTION VLV, 2E1 1-F009, is (step 7.4.9.4.3). CLOSED, green light ONLY illuminated.
    • 6. Close Shutdown Cooling Suction At panel 2H1 1-P601, the Valve, 2E1 1-FOO6A following valve is CLOSED, (step 7.4.9.4.4). green light ONLY illuminated:

SHUTDOWN COOLING VLV, 2E1 1-FOO6A

    • 7 Close Shutdown Cooling Suction At panel 2H11-P601, the Valve, 2E1 1-FOO6C following valve is CLOSED, (step 7.4.9.4.4). green light ONLY illuminated:

SHUTDOWN COOLING VLV, 2E1 1-FOO6C

8. Confirm/open Torus Suction Valve, At panel 2H1 1-P601, TORUS 2E1 l-F065A (step 7.4.9.4.5). SUCTION VLV, 2E1 1-F065A, is OPEN, red light ONLY illuminated.
9. Confirm/open Torus Suction Valve, At panel 2H1 l-P601, TORUS 2E1 l-F065C (step 7.4.9.4.5). SUCTION VLV, 2E1 1-F065C, is OPEN, red light ONLY illuminated.

NOTE: Valve in Step 6 must be closed, green light ONLY, before valve in Step 10 will open.

Valve in Step 7 must be closed, green light ONLY, before valve in Step 11 will open.

    • 1O. Open Torus Suction Valve, At panel 2H11-P601, the 2E1 l-FOO4A (step 7.4.9.4.6). following valve is OPEN, red light ONLY illuminated:

TORUS SUCTION VLV, 2E1 1-FOO4A

    • 11. Open Torus Suction Valve, At panel 2H1 l-P601, the 2E1 1-FOO4C (step 7.4.9.4.6). following valve is OPEN, red light ONLY illuminated:

TORUS SUCTION VLV, 2E1 1-FOO4C

(*

  • Indicates critical step)

2013-301 SIM 4 Page 7 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

NOTE: The control switch for each pump must be taken to STOP before the RHR pump will start on the ioop that was in Shutdown Cooling.

  • 92. Start RHR Pump 2A by placing the At panel 2H1 1-P601, control control switch to STOP, then to switch for the following pump START (step 7.4.9.4.7). has been taken to STOP and then to START, red light illuminated:

RHR PUMP, 2E1 1-COO2A

  • *13. Start RHR Pumps 2C by placing the At panel 2H1 1-P601, control control switch to STOP, then to switch for the following pump START (step 7.4.9.4.7). has been taken to STOP and then to START, red light illuminated:

RHR PUMP, 2E1 1-COO2C NOTE: At least one RHR pump must be started to satisfy the critical step in step 12 or step 13.

NOTE: 2E1 1-FO15A has failed to AUTO open. The operator will be required to MANUALLY open 2E1 1-FO15A

NOTE: 2E1 1-FO15A will close on a Group II Signal level signal if 2E1 1-F008 and 2E1 1-F009 are open and Reactor pressure is less than 138 psig.

NOTE: 2E1 1-F048A has failed to AUTO open. The operator will be required to MANUALLY open 2E1 1-F048A

    • 15. Open Heat Exchanger Bypass Valve, At panel 2H1 1-P601, HX 2E11-F048A (step 7.4.9.4.9). BYPASS VLV, 2E11-F048A, is OPEN, red light illuminated.

(*

  • Indicates critical step)

2013-301 S1M 4 Page 8 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

16. Throttle the RHR Outboard Injection At panel 2H1 1-P601, the Vlv, 2E11-FO17A, to obtain following has been performed:

17,000 gpm (step 7.4.9.4.10). RHR OUTBD INJ VLV, 2E1 1-FO17A, has been ThROTTLED, red and green lights illuminated.

Operator has OBTAINED approximately 17,000 gpm as indicated on RHR FLOW, 2E1 1-R603A (accept +/-2,000 gpm).

NOTE: If a LOCA signal is present, the 2E1 1-FO17A is interlocked open and the operator will be unable to throttle flow for five minutes. Due to the stroke times of the 2E1 1-FOO6A & 6C along with the 2E1 1-FOO4A & 4C, the interlock for 2E11-FO17A will be timed out.

PROMPT: IF the operator addresses additional steps in the procedure, INFORM the operator that another operator will complete the remainder of the procedure.

PROMPT: IF the operator addresses shutting down LPCI, as the Shift Supervisor, INFORM the operator that shutdown of RHR is not required at this time.

END TIME:________

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 16.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(** Indicates critical step)

Southern Nuclear Company Operations Training JPM FINAL CRISIM 5 ALL Title VERIFY AN AUTOMATIC ISOLATION OF PCIS GROUP II uthor: Media Number: Time Anthony Ball 2013-301 SIM 5 15 Minutes Reviewed By Date N/A N/A Reviewed by Instructional Technologist or designeed. Date N/A N/A Approved By Date C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

Course Number Program Name Media Number OPERATIONS TRAINII%G 2013-301 SIM 5 Rev. No. Date .

Reason for Revisions . Authors Sups Initials Initials 00 06/28/95 Initial development RAB SMC 01 06/17/96 Format change, modif time allowance RAB RSG on annual exam comments & changed valves 02 10/07/97 :eed SCB DHG 03 10/23/97 Fixed some typographical errors. SCB DHG 04 03/02/99 Revised due to new simulator computer. SCB DHG 05 02/04/00 Format modification, correct simulator setup RAB DHG 06 11/02/00 Include objective number RAB DHG 07 12/27/01 Added valve not referenced in JPM DNM DHG 08 03/07/02 Include initial operator statement RAB RAB

/ Update procedure numbers, operator applicability and 09 .,

TFP RAB Simulator IC number Revised Initial License statement for successful completion 10 06/02/05 RAE RAB 11 04/07/06 Remove Response Cues RAB RAB 11.1 10/17/11 Reviewed JPM against current procedure. Added pass / fail MMG ALS criteria. Added CLOSED to 2G1 1-F020, 2D1 1-F071, 2P33-F605, 2D1 1-F072 descriptions. Deleted CLOSED from all valves that failed to close. Added These valves can also be checked using the Isolation Valve Display on 2H1 1-P601 to the prompt dealing with verif,ring 2E1 l-FO79AJB and 2E1 1-FO8OAJB on panels 2H21-P018 and 2H21-P021.

11.2 08/16/13 Revised to match procedure and retitled for ILT-8 ARB CME NRC Exam. Once exam is complete will be retitled back to LR-JP-13.46.

Line Contributors The following individuals contributed to the development of this lesson plan.

Rev. No. List of Contributors 11.1 MMG

2013-301 SIM 5 Page 1 of 13 UNIT 1 ( ) UNIT2 (X)

TASK TITLE: VERIFY AN AUTOMATIC ISOLATION OF PCIS GROUP II JPM NUMBER: 2013-301 SIM 5 TASK STANDARD: The task shall be completed when the operator has verified Group II isolation per 34AB-C71-001-2 and isolated those valves that have failed to close.

TASK NUMBER: 013 .046 OBJECTWE NUMBER: 013.046.A PLANT HATCH JTA IMPORTANCE RATING:

RO 3.57 SRO Not Available KJA CATALOG NUMBER: 223002A302 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.50 SRO 3.50 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 34AB-C7 1-001-2 REQUIRED MATERIALS: Unit 2 34AB-C7l-00l-2 (current version)

APPROXIMATE COMPLETION TIME: 15 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2013-301 SIM 5 Page 2 of 13 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to 100% RTP and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME mf70014376 Ann Fail PCIS iNBOARD H202/FPM SYS 00000 OVERRIDE mf70024414 Ann Fail PCIS OUTBOARD H2O2IFPM 00000 SYS OVERRIDE

3. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS rfP33237 H2 02 Analyzer A OFF rfP33238 H2 02 Analyzer B OFF

4. INSERT the following ORS OVERRIDES:

TAG # P/L DESCRIPTION STATUS diP33-S16 P H202 Analyzer Isol LOCA Override BYPASS 00000 diP33-S17 P H2O2 Analyzer Isol LOCA Override BYPASS 00000

5. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Perform RC-l, RC-2, and TC-1. Ensure that RWL drops below +3 inches before recovering.

B. Restore RWL to the normal level band and stabilize the plant.

6. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
7. ESTIMATED Simulator SETUP TIME: 20 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. The Reactor has scrammed.
2. RWL dropped to approximately -10 inches before the operators restored it to the normal level band.

INITIATING CUES:

Verify Group II Isolations.

2013-301 SIM 5 Page 4 of 13 I STEP I PERFORMANCE STEP SAT/UNSAT I # I STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Li Human performance tools, safety, PPE met (1), AND Li Mark the JPM as a PASS Li For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator obtains the procedure needed Operator has obtained procedure to perform the task. 34AB-C71-001-2 OR may use Group Isolation placard.

NOTE: It is the intent of the JPM that the operator verifies Group II isolations and determines which valves have failed to isolate. The action to close the unisolated valves is necessary to complete the critical portion of the step.

Steps 2 through 13 may be performed in any order.

NOTE: In the following steps, the parts of the Standard marked with are the critical portions of that step.

  • Indicates critical step)

2013-301 SIM 5 Page 5 ofl3 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

2. Operator confirms or performs the At panel 2H1 1-P602, the operator following automatic actions has CONFIRMED OR (Attachment. 1 step 2.2): PERFORMED the following:

2G1 l-F003, FLOOR DRAIN 2G1 1-F003, CLOSED, VLV, CLOSED, green light illuminated.

2G11-F019, CLOSED, 2G11-F019, EQUIP DRAIN VLV, green light illuminated.

2E1 l-F040, RHR TO 2E1 1-F040, CLOSED, RADWASTE VLV, CLOSED, green light illuminated.

2T48-Fl 18B, CLOSED, 2T48-F118B, N 2 MAKEUP TO TORUS VLV, CLOSED, green 2T48-F309, CLOSED, light illuminated.

2T48-F309, TORUS AIR 2T48-F307, CLOSED. PURGE VLV, CLOSED, green light illuminated.

2T48-F307, DRWL AIR PURGE VLV, CLOSED, green light illuminated.

3. Operator confirms the following At panel 2H1 1-P602, the operator automatic actions has CONFIRMED the following:

(Attachment. 1 step 2.2): 2T48-F341, DRWL VENT &

RELIEF VLV, CLOSED, green 2T48-F341, CLOSED, light illuminated.

2T48-F339, TORUS VENT &

2T48-F339, CLOSED, RELIEF VLV, CLOSED, green light illuminated.

2T48-Fl 18A, N 2 MAKEUP TO 2T48F1 18A, CLOSED, DRWL VLV, CLOSED, green light illuminated.

2T48-F318, CLOSED, 2T48-F318, TORUS VENT VLV, CLOSED, green light 2T48-F3 19, CLOSED. illuminated.

2T48-F319, DRWL VENT VLV, CLOSED, green light illuminated.

  • Indicates critical step)

2013-301 SIM 5 Page 6 of 13 I STEP I SAT/UNSAT I# I PERFORMANCE STEP STANDARD I (COMMENTS)

4. Operator confirms or performs the At panel 2H1 1-P601, the operator following automatic actions has CONFIRMED OR (Attachment. 1 step 2.2): PERFORMED the following:

2G1 1-F004, FLOOR DRAIN 2G1 1-F004, CLOSED, VLV, CLOSED, green light illuminated.

2G1 1-F020, CLOSED, 2G1 1-F020, EQUIP DRAiN VLV, CLOSED green light illuminated.

2E1 1-F049, CLOSED, 2E1 l-F049, RHR TO RADWASTE VLV, CLOSED, 2T48-F324, CLOSED. green light illuminated.

2T48-F324, TORUS AIR PURGE VLV, CLOSED, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 7 of 13 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

5. Operator confirms the following At panel 2H1 l-P601, the operator automatic actions has CONFIRMED the following:

(Attachment. 1 step 2.2): 2T48-F308, DRYWELL AIR 2T48-F308, CLOSED, PURGE VLV, CLOSED, green light illuminated.

2T48-F340, CLOSED, 2T48-F340, DRWL VENT &

RELIEF VLV, CLOSED, green light illuminated.

2T48-F338, CLOSED, 2T48-F338, TORUS VENT &

RELIEF VLV, CLOSED, green 2T48-F 104, CLOSED, light illuminated.

2T48-F 104, NITROGEN 2T48-F103, CLOSED, MAKEUP VLV, CLOSED, green light illuminated.

2T48-F326, CLOSED, 2T48-F103, NITROGEN PURGE VLV, CLOSED, green light illuminated.

2T48-F320, CLOSED, 2T48-F326, TORUS VENT VLV, CLOSED, green light 2E1 1-FO15A, CLOSED, illuminated.

2T48-F320, DRYWELL VENT 2E1 1-FO15B, CLOSED, VLV, CLOSED, green light illuminated.

2E1 1-F122B, CLOSED, 2E1 1-FO15A, RHR INJECTION VALVE, CLOSED, green light illuminated.

2El 1-F122A, CLOSED.

2E1 1-FO15B, RHR INJECTION VALVE, CLOSED, green light illuminated.

2E1 1-F122B, TESTABLE CHECK FO5OB BYPASS VLV, CLOSED, green light illuminated.

2E1 1-F122A, TESTABLE CHECK FO5OA BYPASS VLV, CLOSED, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 8 of 13 E9 I PERFORMANCE STEP STANDARD I SAT/UNSAT (COMMENTS)

    • 6. Operator confirms or performs the At panel 2H1 l-P700, the operator following automatic actions: has CONFIRMED the following:

2D11-F051, PRI CNMT FIS PROD MON INBD ISOL, 2D 11 F05 1, CLOSED, CLOSED, green light illuminated.

2D1 l-F050, CLOSED, 2D1 1-F050, PRI CNMT FIS PROD MON INBD ISOL, CLOSED, green light 2E41-F122, CLOSED, illuminated.

2E41-F122, POST ACC RX 2B21-F11l, CLOSED, COOL/CNMT ATMOS SMPLG INBD ISOL, CLOSED, green 2P70-F002, CLOSED, light illuminated.

2B21-F11l, POST ACC RX COOL/CNMT ATMOS SMPLG

    • 2p33F002, CLOSED, INBD ISOL, CLOSED, green light illuminated.
    • 2p33FOO7, CLOSED, 2P70-F002, DRWL PNEU INBD SUCTION ISOL, CLOSED, green light illuminated.
    • 2p33..F004, CLOSED, **2p33..F002, PRI CNMT ATMOS H2O2 ANLY INBD
    • 2p33..F003, CLOSED, ISOL CH B, switch taken to CLOSE, green light illuminated.
    • 2p33.F005, CLOSED.

ATMOS H2O2 ANLY INBD ISOL CH A switch to CLOSE, green light illuminated.

    • 2p33...F004, PRI CNMT ATMOS H202 ANLY A RTN LINE INBD ISOL, switch taken to CLOSE, green light illuminated.
    • 2p33F003, PRI CNMT ATMOS H202 ANLY INBD ISOL CH A, CLOSED, green light illuminated.
    • 2p33..F005, PRI CNMT ATMOS 11202 ANLY INBD ISOL CH B RETURN LINE, switch taken to CLOSE green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 9 ofl3 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

    • 7* Operator confirms or performs the At panel 2H1 1-P700, the operator following automatic actions: has CONFIRMED OR 2D 11 -F07 1, CLOSED, PERFORMED the following:

2D1 1-F071, PRI CNMT ATMOS

    • 2p33...F006 CLOSED FIS PROD MON SAMPLE LiNE ISOL, CLOSED, green light illuminated.

2G51-F011, CLOSED, **2p33.F006, PRI CNMT ATMOS H202 ANLY LNBD 2G51-F017, CLOSED, ISOL CH B, CLOSED, green light illuminated.

2D11-F052, CLOSED, 2G51-F011, TORUS WATER CLEANUP 1NBD ISOL, CLOSED, green light 2D1 1F053, CLOSED, illuminated.

2G51-F017, TORUS WATER 2B2 1-Fl 12, CLOSED, MAKEUP OUTBD ISOL, CLOSED, green light 2E4 1-Fl 21, CLOSED. illuminated.

2D1 1-F052, PRI CNMT FIS PROD MON OUTBD ISOL, CLOSED, green light illuminated.

2D1 1-F053, PRI CNMT FIS PROD MON OUTBD ISOL, CLOSED, green light illuminated.

2B2 1-Fl 12, POST ACC RX COOL/CNMT ATMOS SMPLG OUTBD ISOL, CLOSED, green light illuminated.

2E41-F121, POST ACC RX COOL/CNMT ATMOS SMPLG OUTBD ISOL, CLOSED, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 10 of 13 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1 Operator confirms or performs the At panel 2H1 1-P700, the operator following automatic actions: has CONFIRMED OR PERFORMED the following:

    • 2p33..F015, CLOSED, **2p33.F015, PRI CNMT ATMOS H202 ANLY OUTBD ISOL CH A, switch to CLOSE,
    • 2p33..FO1O, CLOSED, green light illuminated.
    • 2p33..F013, CLOSED, green light illuminated.

2P70-F003, DRWL PNEU

    • 2p33..FO1 1 CLOSED OUTBD SUCTION ISOL, CLOSED, green light illuminated.
    • 2p33..F012, CLOSED **2p33.F013, PRI CNMT ATMOS H202 ANLY OUTBD 2P33-F605, CLOSED, ISOL CH B RETURN LINE, switch to CLOSE, green light illuminated.

2D11-F072, CLOSED.

    • 2p33F011, PRI CNMT ATMOS H2O2 ANLY OUTBD ISOL CH A, CLOSED, green light illuminated.
    • 2p33...F012, H202 ANLY CH A RTN LN OUTBD ISOL, switch to CLOSE, green light illuminated.

2P33-F605, 02 Analyzer Isol Valve, CLOSED, green light illuminated 2D1 1-F072, PRI CNMT ATMOS H202 ANLY FIS PROD MON RTN LN ISOL, CLOSED, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 11 of 13 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

    • 9 Operator confirms or performs the At panel 2H1 1-P700, the operator following automatic actions: has CONFIRMED the following:
    • 2p33.F014, CLOSED, ATMOS H202 ANLY OUTBD ISOL CH B, CLOSED, green light illuminated.

2G51-F013, CLOSED, 2G51-F013, TORUS WATER MAKEUP INBD ISOL, 2G51-F012, CLOSED. CLOSED, green light illuminated.

2G51-F012, TORUS DRN/PURIF TORUS WATER CLEANUP OUTBD ISOL, CLOSED, green light illuminated.

10. Operator confirms that At panel 2H1 1-P607, the operator 2C51-JOO4A-D are CLOSED has CONFIRMED that 2C51-JOO4A-D, TIP BALL VLVS, CLOSED, green light illuminated.
11. Operator confirms the following At panel 2H1 1 -P657, the operator automatic actions: has CONFIRMED the following:

2T48-F334A, CAD A 2T48-F334A, CLOSED, DRYWELL VENT ISOL VLV, CLOSED, green light illuminated.

2T48-F335A, CLOSED, 2T48-F335A, CAD A DRYWELL VENT ISOL VLV, 2T48-F332A, CLOSED, CLOSED, green light illuminated.

2T48-F333A, CLOSED. 2T48-F332A, CAD A TORUS VENT ISOL VLV, CLOSED, green light illuminated.

2T48-F333A, CAD A TORUS VENT ISOL VLV, CLOSED, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM 5 Page 12 of 13 STEP PERFORMANCE STEP I STANDARD SATIUNSAT (COMMENTS)

12. Operator confirms the following At panel 2H1 1-P657, the operator automatic actions: has CONFIRMED the following:

2T48-F209, DRWL TO TORUS 2T48-F209, CLOSED, DP SYS INBD ISOL, CLOSED, green light illuminated.

2T48-F211 CLOSED 2T48-F211, DRWLTO TORUS DP SYS INBD ISOL, CLOSED, green light illuminated.

13. Operator confirms the following At panel 2Hl l-P657, the operator automatic actions: has CONFIRMED the following:

2T48-F334B, CAD B 2T48-F334B, CLOSED, DRYWELL VENT ISOL VLV, CLOSED, green light illuminated.

2T48-F335B, CLOSED, 2T48-F335B, CAD B DRYWELL VENT ISOL VLV, 2T48-F332B, CLOSED, CLOSED, green light illuminated.

2T48-F333B, CLOSED, 2T48-F332B, CAD B TORUS VENT ISOL VLV, CLOSED, 2T48-F210, CLOSED, green light illuminated.

2T48-F333B, CAD B TORUS VENT ISOL VLV, CLOSED, 2T48-F2l2, CLOSED. green light illuminated.

2T48-F2l0, DRWL TO TORUS DP SYS OUTBD ISOL, CLOSED, green light illuminated.

2T48-F212, DRWL TO TORUS DP SYS OUTBD ISOL, CLOSED, green light illuminated.

PROMPT: IF the operator addresses 2E1 1-F079A/B and 2El 1-FO8OAJB on panels 2H21-P018 and 2H21-P021, INFORM the operator that another operator has verified these valves are closed. These valves can also be checked using the Isolation Valve Display on 2Hl l-P601.

(** Indicates critical step)

2013-301 SIM 5 Page 13 of 13 STEP PERFORMANCE STEP SATJUNSAT STANDARD (COMMENTS PROMPT: IF the operator addresses resetting the Group Isolation, INFORM the operator that it is NOT desired at this time.

END TIME:

NOTE: The terminating cue shall be given to the operator when:

After JPM step #13 is complete.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

  • Indicates critical step)

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM FINAL CR/SIM 6 RO & SRO-I TITLE PERFORM A DIESEL GENERATOR MANUAL START SURVEILLANCE (TRIP FAILURE)

AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2013-301 SIM 6 15 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 08/16/2013 SOUTHERN COMPANY A

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2013-301 SIM 6 Rev. I Date Reason for Revision Authors I Supvs No. Inthals Initials 00 10/18/10 Initial development, removed first 31 steps of LR-JP-25034 to time ELi CME considerations.

01 08/16/13 Revised to match procedure and retitled to 2013-301 Sim 6 ARB CME for ILT-8 NRC Exam. Added Event Triggers to actuate the malfunctions when the DIG kW is increased to -46OO kW.

This JPM will be retitled to LR-JP-25034A after NRC Exam.

2013-301 SIM 6 Page 1 of6 UNIT1 ( ) UNIT 2 (X)

TASK TITLE: PERFORM A DIESEL GENERATOR MANUAL START SURVEILLANCE (TRIP FAILURE)

JPM NUMBER: 2013-301 SIM6 TASK STANDARD: The task shall be completed when the Operator has tied the 2A Diesel Generator to the 2E 4160 VAC Bus per 34SV-R43-004-2. Then following a failure to auto trip, shutdown the Diesel Generator.

TASK NUMBER: 028.016 OBJECTIVE NUMBER: 028.016.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.22 SRO 2.93 K/A CATALOG NUMBER: 264000A404 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.70 SRO 3.70 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 2 34SV-R43-004-2 (current version) 34AR-652-1 11-2 (current version) 34AR-652-129-2 (current version)

REQUIRED MATERIALS: Unit 2 34SV-R43-004-2 (current version) 34AR-652-l 11-2 (current version) 34AR-652-129-2 (current version)

Stopwatch APPROXIMATE COMPLETION TIME: 15 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWiNG PAGE

2013-301 SIM 6 Page 2 of 6 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to SNAP 616 OR to IC#113.
2. INSERT the following MALFUNCTIONS:

Key # MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME R43-3 mf6521 1665 Spur Arm LUBE OIL PRESS LOW 9999 R43-3 mf6521 1683 Spur Ann EMERGENCY ENGINE 9999 SHUTDOWN

3. INSERT the following REMOTE FUNCTIONS:

REM # DESCRIPTION STATUS rfR43294 DG 2A Engine Remote Speed Droop (0 100) 50

4. ACTIVATE THE FOLLOWING EVENT TRIGGERS:

Trigger # DESCRIPTION CONDITIONS Expert Conunand R43-3 Inserts DG 2A oil break alarms aoR43-A_k-WATTanvToPanel >.33

4. Perform all steps of 34SV-R43-004-2, up to and including step 7.2.3.18.
5. ESTIMATED Simulator SETUP TIME: 20 Minutes NOTE To monitor Diesel Generator A engine speed, governor setting, frequency, perform the following steps at the instructor station.
1. Click on any screen, off of any list.
2. Type ALT-P.
3. Select TABLES.
4. Select TABLES (below cancel).
5. Select TABLE DIESEL GENERATORS.
6. Select OPEN

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. 34SV-R43-004-2, Diesel Generator 2A Semi-Annual Test is in progress.
2. All steps of 34SV-R43-004-2, up to and including step 7.2.3.18, have been completed.
3. No other testing or maintenance is in progress.
4. A SO is in the Diesel Building
5. The NPO originally performing this task was called away (personal emergency).

INITIATING CUES:

Continue the Diesel Generator 2A Semi-Annual Test, per 34SV-R43-004-2, at step 7.2.3.19.

1ST is NOT being performed.

2013-301 SIM 6 Page 4 of 6 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Mark the JPM as a PASS EJ For initial trg all steps completed correctly OR PASS I For continuing trg, critical steps (if used) completed correctly FAIL Above standards not met I Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation NOTE To Evaluator: Perform the turn-over for this JPM prior to entering the simulator when possible (i.e. allow the student to review the procedure in the Virtual Simulator or Simulator Assessment Room, etc.), doing this will minimize the time the simulator is NOT being actively used.

START TIME:_______

1. Operator identifies the procedure Operator has OBTAINED needed to perform the task. procedure 34SV-R43-004-2.
2. Operator identifies the materials that Operator OBTAINS a stopwatch.

are required.

3. Operator reviews the procedures Operator has REVIEWED the precautions and limitations, precautions and limitations.

PROMPT: WHEN the Operator addresses obtaining permission from the Shift Supervisor, INFORM the Operator that permission has been granted.

PROMPT: IF ASKED inform the Operator to assume a Pre-Job brief has been performed.

(*

  • Indicates critical step)

2013-301 SIM 6 Page 5 of 6 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

4. Observe the voltage on each phase of At panel 2H1 1-P652, the 4160V Bus 2E and record the highest Operator OBSERVES the voltage voltage (step 7.2.3.19). on each phase of 4160V Bus 2E, as indicated on VOLTMETER, 2R43-R904, and RECORDS the highest voltage.
5. Using Diesel Generator 2A Voltage At panel 2H1 1-P652, the Adjust switch, increase diesel output Operator uses Diesel Generator voltage to match the highest phase 2A VOLTAGE ADJUST switch, voltage on 4160V Bus 2E iNCREASES diesel output (step 7.2.3.20). voltage to match the highest phase voltage on 4160V Bus 2E.
    • 6. When the syncbroscope indicates 2 At panel 2H1 1-P652, the minutes to 12 and when the Operator, when the synchroscope syncbroscope lights are at the dimmest indicates 2 minutes to 12 and point, CLOSE ACB 135530 when the synchroscope lights are (step 7.2.3.21). at the dimmest point, CLOSES EMERGENCY SUPPLY ACB 135530, red light illuminated.

NOTE: IF during the performance of the following two steps, the Operator trips the diesel, these steps become critical and the JPM is failed.

7. Using the Diesel Gen 2A Speed At panel 2H1 1-P652, the Operator Adjust switch, adjust the load on the uses the Diesel Gen 2A SPEED diesel to 500 to 1000 kW ADJUST switch, ADJUSTS the (step 7.2.3.22). load on the diesel to 500 to 1000 kW, as indicated on KILOWAlT, 2R43-R61 5A.

Using the Diesel Gen 2A Voltage At panel 2H1 1-P652, the Operator Adjust switch, adjust reactive load to uses the Diesel Gen 2A between 500 to 1000 KVAR. VOLTAGE ADJUST switch, (step 7.2.3.23). ADJUSTS the reactive load on the diesel to 500 to 1000 KVAR, as indicated on KVAR, 2R43-R616A.

8. Gradually increase load to between At panel 2H 11 -P652, the Operator 1750 and 2000 kW uses the Diesel Gen 2A SPEED (step 7.2.3.24). ADJUST switch, ADJUSTS the load on the diesel to 1750 and 2000 kW, as indicated on KILOWATI, 2R43-R6 1 5A.
  • Indicates critical step)

2013-301 SIM 6 Page 6 of 6 STEP f PERFORMANCE STEP STANDARD I (COMMENTS)

SIMULATOR OPERATOR: AS the Operator is increasing the diesel loading to 1750 kW, ENSURE EVENT TRIGGER R43-3 ACTWATES MALFUNCTIONS mf65211665, Spur Ann- LUBE OIL PRESS LOW.

5 10 seconds later, mf65211683, Spur Aim EMERGENCY ENGINE SHUTDOWN.

PROMPT: SIMULATOR OPERATOR: IF the Operator contacts the SO in the Diesel Building, REPORT as the SO: An oil line has split and is spewing hot oil and I have left the Diesel Building.

    • 9* Opens the Emergency Supply ACB. At panel 2H1 1-P652, the Operator, OPENS EMERGENCY SUPPLY ACB 135530, green light illuminated.
    • 10. Take the Diesel Gen 2A Start switch At panel 2H1 1-P652, the to the STOP position. Operator TAKES the Diesel Gen 2A START switch to the STOP position.

PROMPT: ONCE the Operator has stopped the diesel, INFORM the Operator that another Operator will complete the shutdown, contact Maintenance, and place the diesel into Standby configuration.

END TIME:

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 10.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

Southern Nuclear E. I, Hatch Nuclear Plant Operations Training JPM FINAL CRISIM 7 RO & SRO4 TITLE PERFORM RC-1, ALTERNATE PATH AUTHOR MEDIA NUMBER TIME Anthony Ball 2013-301 S1M7 10 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

z f

cc c

C C-)

0 cc oou CD 0QO 0 O c

0 CD CD

t. C CD -CfJ C

._) 0 QC()

C_)_ C C, jj- D O C

j_

CD CI)

C CCD

-a. .

CD

. 0

=)

-2 CD CD C

)-

>Tj t

CD C C 0 ttl LTj M

2013-301 SIM7 Page 1 of6 UNIT1 () UNIT2 (X)

TASK TITLE: PERFORM RC-1, ALTERNATE PATH JPM NUMBER: 2013-301 SIM7 TASK STANDARD: The task shall be completed when the operator has completed all the steps of the RC- 1 Placard.

TASK NUMBER: 300.046 OBJECTIVE NUMBER: H-OPOO1.013.A PLANT HATCH JTA IMPORTANCE RATING:

RO 4.0 SRO 4.3 K/A CATALOG NUMBER: 2.4.43, 201001A2.04 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.6,3.8 SRO 4.6,3.9 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 & 2 34AB-C71-001-2 REQUIRED MATERIALS: Unit 1 & 2 34AB-C7 1-001-2 APPROXIMATE COMPLETION TIME: 10 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE

2013-301 SIM 7 Page 2 of 6 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to SNAP 617 OR 60% RTP and leave in FREEZE.
2. INSERT the following MALFUNCTIONS:

Key # MALF # TITLE FINAL RAMP ACT.

VALUE RATE TIME ST-O mfC7l_60B Reactor protection system fails to scram- 0000 complete RB-i mfC5ll4A APRM A Failure (Inoperative) 9999 RB-i mfC5l_14B APRM B Failure (Inoperative) 9999

3. PLACE the Simulator in FREEZE until the INITIATING CUE is given.
4. ESTIMATED Simulator SETUP TIME: 6 minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit Two is operating at 57% RTP.
2. You are the Operator At The Controls (OATC).

INITIATING CUES:

Respond to Plant conditions.

2013-301 SIM 7 Page 4 of 6 STEP PERFORMANCE STEP STANDARD I (COMMENTS) I For iNITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN LI Human performance tools, safety, PPE met (1), AND LI Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation START TIME:________

PROMPT: WHEN the operator assumes the shift, SIMULATOR OPERATOR, DEPRESS RB-i.

The following alarms will be received:

e REACTOR NEUTRON MONITORING SYS TRIP, (603-109),

  • REM UPSCALE OR INOPERATiVE, (603-202),
  • APRMIOPRM TRIP, (603-2 10),
  • ROD OUT BLOCK, (603-238)
1. Operator identifies APRMs A & B At 2H1 1-P603, the operator have tripped, monitors APRM ODAs to identify APRMs A & B have tripped.
2. Inserts a manual scram by depressing At 2Hl 1-P603, the operator the scram push buttons. DEPRESSES at least one scram pushbutton in both A and B channels.

(*

  • Indicates critical step)

2013-301 SIM 7 Page 5 of 6 f STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

    • 3 Places the Mode Switch to At 2H1 1-P603, the operator SHUTDOWN. TRANSFERS the Mode Switch to the SHUTDOWN position.
4. Confirms the BLUE scram lights are At 2H1 1-P603, the operator illuminated. OBSERVES the blue scram lights are NOT illuminated.
    • 5 ARMS ART Ch A. At 2H1 1-P603, the operator arms ART Ch A by rotating the pushbutton collar to the ARMED position.
    • 6 ARMS ART Cb B. At 2H1 1-P603, the operator arms ART Ch B by rotating the pushbutton collar to the ARMED position.
    • 7 huitiates ART. At 2H1 1-P603, the operator depresses both ARI Manual Initiation Ch A AND Ch B pushbuttons simultaneously.
8. Confirm ART INITIATED, (603-304) At 2H1 1-P603, the operator annunciator has ALARMED confirms ARI INITIATED, (603-3 04) annunciator has ALARMED.
9. Confirm ALL rods are inserted. At 2H1 1-P603, the operator USES Full In Lights, RWM or SPDS to VERIFY all rods in.
  • Indicates critical step)

2013-301 SIM 7 Page 6 of 6 I STEP I I# I PERFORMANCE STEP STANDARD I SATIUNSAT (COMMENTS) I

10. Notifies Shift Supervisor of rod I At 2H1 1-P603, the operator I I position check. I INFORMS the evaluator that I I ALL rods are inserted.

PROMPT: WHEN the operator notifies the Shift Supervisor that ALL rods are in, INFORM that another operator will complete the remaining scram actions.

END TIME:

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 10.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

(** Indicates critical step)

A

Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM FINAL CRISIM 8 ALL TITLE PLACE THE CONTROL ROOM HVAC SYSTEM IN THE ISOLATION MODE (ALT-PATH 1ST FAN FAILURE)

AUTHOR MEDIA NUMBER TIME Anthony Ball 2013-301 SIM-8 21.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R C. M. EDMUND 08/16/2013 SOUTHERN A COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING Media Number: 2013-301 SIM 8 Rev. No. Date Reason for Revision Authors Supvs Initials Initials 00 08/16/13 Revised to match procedure and retitled to 2013-301 ARB CME Sim 8 for ILT-8 NRC Exam. Added 1st C012 fan attempted will fail requiring the other fan to be placed into service. This JPM will be retitled after NRC Exam.

2013-301 STM-8 Page 1 of8 UNIT1 (X) UNIT2 ( )

TASK TITLE: PLACE THE CONTROL ROOM HVAC SYSTEM IN THE ISOLATION MODE (ALT-PATH 1ST FAN FAILURE)

JPM NUMBER: 2013-301 SIM-8 TASK STANDARD: The task shall be completed when the Control Room Ventilation System has been placed in the Isolation per 34S0-Z41-001-1.

TASK NUMBER: 03 7.009 OBJECTIVE NUMBER: 037.009.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.21 SRO 2.69 K/A CATALOG NUMBER:

K/A CATALOG JTA IMPORTANCE RATiNG:

RO SRO OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 34S0-Z41-00l-1 (current version)

_REQUIRED MATERIALS: Unit 1 34S0-Z41-001-1 (current version)

APPROXIMATE COMPLETION TIME: 21.0 Minutes

( SIMULATOR SETUP: N/A

UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 1 is operating at 100% power.
2. The Main Control Room Ventilation System has been operating in a Normal Ventilation configuration for several days.
3. Plant Conditions require MCR Ventilation be swapped to Isolation Mode.

INITIATING CUES:

Swap Main Control Room Ventilation to Isolation Mode per 34S0-Z41-001-1, Control Room Ventilation System.

2013-301 SIM-8 Page 3 of 8 I STEP I SAT/UNSAT PERFORMANCE STEP STANDARD L # I I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND I Mark the JPM as a PASS I For initial trg all steps completed correctly OR PASS For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation START TIME:________

1. Operator identifies the procedure Operator has identified the correct needed to perform the task. procedure as 34S0-Z41-001-1.
2. Operator reviews the procedures Operator has reviewed the precautions and limitations. precautions and limitations.
3. Close Roll Filter Bypass, 1Z41-F015. At MCR Door C70, ROLL (step 7.1.3.3.1) FILTER BYPASS, 1Z41-F015 control switch is in CLOSE, green light ONLY illuminated.
    • 4* Close Outside Air Intake Damper, At panel 1H1 1-P657, FILTER 1Z41-F016. (step 7.1.3.3.2) INLET control switch, 1Z41-F016, is in CLOSE position, green light ONLY illuminated.
  • Indicates critical step)

2013-301 SllvI-8 Page 4 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS)

    • 5 Close Filter Inlet, 1Z41-FO13A. At panel lHl 1-P657, FILTER (step 7.1.3.3.3) INLET control switch, 1Z41-FO13A, is in CLOSE position, green light ONLY illuminated.
    • 6. Close Filter Inlet, 1Z41-FO13B. At panel lHl 1-P654, FILTER (step 7.1.3.3.4) INLET control switch, 1Z41-FO13B, is in CLOSE position, green light ONLY illuminated.

NOTES:

  • If the operator starts with the A Recirc Fan, CO12A, perform steps 7-9, skip 10-12, AND then continue with step 13.
  • If the operator starts with the B Recirc Fan, CO12B, skip steps 7-9 and start with step 10.
7. Start Recirc Fan, lZ4l-CO12A At panel 1H11-P657 (P654),

(step 7.1.3.4.) RECIRC FAN, 1Z41C012A control switch is in RUN, green light ONLY illuminated.

NOTE: The operator should note that CO12A does NOT start and continue with CO12B start.

    • 8. Start Recirc Fan, lZ4l-CO12B At panel 1H11-P654, RECIRC (step 7.1.3.4.) FAN, 1Z41-CO12B control switch is in RUN, red light illuminated.

(*

  • Indicates critical step)

2013-301 SIM-8 Page 5 of 8 I STEP PERFORMANCE STEP STANDARD I (I1)

9. Confirm the following dampers are At panel 1H1 1-P654, the open: (step 7.1.3.4.2) following dampers are OPEN for 1Z41-FOO8A Fan 1Z41-CO12B, red lights 1Z41-FOO8B ONLY illuminated:

1Z41-FOO8C 1Z41-FOO8A, Inlet to UNIT BOO3A 1Z41-FO14B 1Z41-FOO8B, Inlet to UNIT BOO3B 1Z41-FOO8C, Inlet to UNIT BOO3C 1Z41-FO14B, RECIRC INLET

10. Start Recirc Fan, 1Z41-CO12B At panel 1H1 1-P654, RECIRC (step 7.1.3.4.) FAN, 1Z41-CO12B control switch is in RUN, green light ONLY illuminated.

NOTE: The operator should note that CO 1 2B does NOT start and continue with CO12A start.

11. StartRecirc Fan, 1Z41-COI2A Atpanel 1H11-P657,RECIRC (step 7 1 3 4) FAN, 1Z41C012A control switch is in RUN, red light illuminated.
12. Confirm the following dampers are At panel 1H11-P657, the open: (step 7.1.3.4.1) following dampers are OPEN for 1Z41-FOO7A Fan 1Z41-CO12A, red lights 1Z41-FOO7B ONLY illuminated:

1Z41-FOO7C 1Z41-FOO7A, Inlet to UNIT BOO3A 1Z41-FO14A 1Z41-FOO7B, Inlet to UNIT BOO3B 1Z41-FOO7C, Inlet to UNIT BOO3C 1Z41-FO14A, RECIRC INLET

(*

  • Indicates critical step)

2013-301 S1M-8 Page 6 of 8 STEP I I SATJUNSAT PERFORMANCE STEP STANDARD

! # I I (COMMENTS)

(step 7.1.3,5) 1Z41-F012, FILTER BYPASS 1Z41-F019 & F020, MENS &

WOMENS RESTROOM VENT ISOL DMPR

15. Confirm Mens Restroom Door is In the Control Room, the Mens closed. (step 7.1.3.7) Restroom Door is CLOSED.

NOTE: It is acceptable for the operator to leave the failed CO 1 2AIB in either the STANDBY, AUTO or OFF position.

16. Place control switch for Recirc Fan At panel 1H1 1-P654 (P657),

1Z41-CO12B (CO12A) in Standby. RECIRC FAN 1Z41-CO12B (step 7.1.3.8) (CO12A) control switch is in STANDBY, green light illuminated.

(*

  • Indicates critical step)

2013-301 SIM-8 Page 7 of 8 I STEP I I# I PERFORMANCE STEP STANDARD I SAT/UNSAT (COMMENTS)

NOTE: The following positions will be dictated by which fan the operator attempted to start first.

NOTE: The operator may NOT perform the following step due to the inoperability of the first attempted C012 fan.

17. Confirm the following dampers are At panel 1H1 1-P654 (P657), the closed: following dampers are CLOSED

{step 7.1.3.8.1 (step 7.l.3.8.1)} for Fan 1Z41-CO12B (COI2A),

1 Z4 1 -FOO8A (FOO7A) green lights illuminated:

1 Z4 1 -FOO8B (FOO7B) 1Z41-FOO8A (FOO7A), Inlet to UNIT BOO3A I Z41 -FOO8C (FOO7C) lZ4l-FOO8B (FOO7B, Inlet to 1Z41-FO14B (FO14A)

UNIT BOO3B 1Z41-FOO8C (FOO7C), Inlet to UNIT BOO3C 1Z41-FO14B (FO14A), Recirc Inlet

18. PLACE 1Z41-C009, Cable Spreading At lHll-.P654, PLACE 1Z41-Room Supply Fan, to OFF. C009, Cable Spreading Room (step 7.1.3.9) Supply Fan, to the OFF position.
19. PLACE 1Z41-C010, Cable Spreading At 1H11-P654, PLACE 1Z41-Room Exhaust Fan, to OFF. COb, Cable Spreading Room (step 7.1.3.10) Exhaust Fan, to the OFF position.
  • Indicates critical step)

2013-301 SIM-8 Page 8 of 8 STEP PERFORMANCE STEP STANDARD I (COMMENTS) 1

20. Initiate compensatory action to Initiate compensatory action to confirm twice per shift that the confirm twice per shift that the temperature in the Cable Spreading temperature in the Cable Room is less than 105°F. Spreading Room is less than (step 7.1.3.11) 105°F. An Engineering Evaluation is required if the temperature reaches 105°F.

PROMPT: IF the operator notifies the Shift Supervisor to initiate compensatory actions, INFORM that a System Operator will be monitoring Cable Spreading Room temperatures.

END TIME:________

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 20.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

Southern Nuclear Company Operations Training JPM FINAL PLANT 1 ALL Title VENT THE SCRAM AIR HEADER Author: Media Number: Time Anthony Ball 2013-301 PLANT 1 7.0 Minutes Reviewed By Date N/A N/A Reviewed by Instructional Technologist or designee. Date N/A N/A Approved By Date C. M. EDMUND 08/16/2013 SOUTHERN

Course Number Program Name Media Number OPERATIONS TRAINING 2013-301 PLANT 1 Authors Sups Rev. No. Date Reason for Revisions Initials Initials 12 02/27/02 Include initial operator statement RAB RAB 13 06/01/05 Deleted S from procedure numbers, changed BEB RAB Revision and Rev, numbers to Current Version, RAB revised Initial License statement for successful completion 14 04/06/06 Remove Response Cues RAB RAB 15 09/25/09 Added HU steps. CLN ALD ADY 15.1 8/11/11 Reviewed JPM against current procedure. Added MMG DNM the following prompt, IF the operator addresses Scram Air Header Pressure, INDICATE that the Scram Air Header Pressure is decreasing and that you can hear the air escaping.

15.2 08/16/13 This JPM was modified to match procedure and ARB CME renumbered from LR-JP- 10.15 for ILT-8 NRC Exam. After this exam it will be re-titled back to original LR JPM number.

2

Line Contributors The following individuals contributed to the development of this lesson plan.

Rev. No. List of Contributors 3

2013-301 PLANT 1 Page 1 of7 UNIT1 (X) UNIT2 (X)

TASK TITLE: Vent the Scram Air Header JPM NUMBER: 2013-301 PLANT 1 TASK STANDARD: The task shall be completed when the operator has successfully vented the scram air header per 31 EO-EOP- 103.

TASK NUMBER: 010.015 OBJECTIVE NUMBER: 010.015.O PLANT HATCH JTA IMPORTANCE RATING:

RO 4.50 SRO 3.65 K/A CATALOG NUMBER: 212000A417 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.10 SRO 4.10 OPERATOR APPLICABILITY: Systems Operator (SO)

NOTE:

IT IS INTENDED FOR THIS TO BE PERFORMED ON UNIT 2.

UNIT 1 IS INCLUDED IN CASE WORK IN THE AREA PREVENTS PERFORMANCE ON UNIT 2.

GENERAL

REFERENCES:

Unit 1 Unit 2 31EO-EOP-103-1 31E0-EOP-103-2

( current version) (current version) 31EO-EOP-011-1 31EO-EOP-011-2 (current version) (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 3 1EO-EOP-103-1 3 1EO-EOP-103-2 (current revision) (current revision)

Adjustable Wrench Adjustable Wrench APPROXIMATE COMPLETION TIME: 7.0 Minutes SIMULATOR SETUP: N/A

UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A Reactor scram signal has been received and all the control rods did NOT insert to Position 02 and Reactor power is greater than 10%.
2. The blue scram inlet and outlet valve lights are extinguished.
3. 31E0-EOP-011-1 (RCA) is in progress.

INITIATING CUES:

Vent the scram air header per 31 EO-EOP-1 03-1.

2013-301 PLANT 1 Page3 of7 f STEP PERFORMANCE STEP STANDARD I (COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the materials that Operator identifies the required are required. (pliers) materials and where to obtain.

NOTE: WHEN the Operator closes 1C1 1-F095 valve, the handwheel will be turned in the clockwise direction until it will NOT turn any farther.

    • 2. CLOSE IC1I-F095 (step 3.6.1). At location 13ORARO3, lCl 1-F095, SCRAM AIR HEADER ISOLATION VALVE is CLOSED.
    • 3 Remove cap if installed from end of At location 13ORARO3, cap is piping downstream of REMOVED from end of piping 1C11-R013-TV1 (step 3.6.2). downstream of 1C1 1-R013-TV1.
4. Confirm OPEN/OPEN 1C1 1-R013- At location 13ORARO3, IV1 (step 3.6.3). 1C11-R013-IV1, PRESSURE INSTRUMENTATION ISOLATION VALVE is OPEN.
  • Indicates critical step)

2013-301 PLANT 1 Page 4 of 7 STEP f PERFORMANCE STEP STANDARD I SATJUNSAT (COMMENTS)

    • 5 OPEN 1CI 1-R013-TV1 (step 3.6.4). At location 13ORARO3, 1C11-R013-TV1, PRESSURE INSTRUMENTATION VENT VALVE, is OPEN, Scram Air Header pressure decreasing on id i-PI-R013.

PROMPT: IF the operator addresses Scram Air Header Pressure, iNDICATE that the Scram Air Header Pressure is decreasing and that you can hear the air escaping.

END TIME:

NOTE: The terminating cue shall be given to the operator when:

After JPM step #5 is complete.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. A Reactor scram signal has been received and all the control rods did NOT insert to Position 02 and Reactor power is greater than 10%.
2. The blue scram inlet and outlet valve lights are extinguished.
3. 31 EO-EOP-01 1-2 (RCA) is in progress.

INITIATING CUES:

Vent the scram air header per 31E0-EOP-103-2.

2013-301 PLANT 1 Page 6 of 7 STEP PERFORMANCE STEP I SAT/UNSAT 1 i # I STANDARD I (COMMENTS)J For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN i Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the materials that Operator identifies the required are required. (pliers) materials and where to obtain.

NOTE: WHEN the Operator closes 2C1 1-F095 valve, the handwheel will be turned in the clockwise direction until it will NOT turn any farther.

    • 2. CLOSE 2C1 1-F095 (step 3.6.1). At location 130RAR22, 2C1 l-F095, SCRAM AIR HEADER ISOLATION VALVE is CLOSED.
    • 3 REMOVE cap if installed from end of At location 130RAR22, cap is piping downstream of REMOVED from end of piping 2C11-R013-TV1 (step 3.6.2). downstream of 2C1 l-R0l3-TV1.
4. Confirm OPEN 2Cl l-R0l3-IV1 At location 130RAR22, (step 3.6.3). 2C11-R013-IV1, PRESSURE INSTRUMENTATION ISOLATION VALVE is OPEN.

(*

  • Indicates critical step)

2013-301 PLANT 1 Page 7 of 7 I STEP I I SATIUNSAT PERFORMANCE STEP I#I STANDARD I (COMMENTS)

    • 5* OPEN 2C1 1-R013-TV1 (step 3.6.4). At location 130RAR22, 2C1 1-R013-TV1, PRESSURE INSTRUMENTATION VENT VALVE, is OPEN, Scram Air Header pressure decreasing on 2C1 l-PI-R013.

PROMPT: IF the operator addresses Scram Air Header Pressure, INDICATE that the Scram Air Header Pressure is decreasing and that you can hear the air escaping.

END TIME:

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 5.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(*

  • Indicates critical step)

Southern Nuclear Company Operations Training JPM FINAL PLANT 2 RO & SRO-I Title FROM THE REMOTE SHUTDOWN PANEL, START RIffi IN TORUS COOLING Author: Media Number: Time Anthony Ball 2013-301 PLANT 2 22.0 Minutes Reviewed By Date N/A N/A Reviewed by Instructional Technologist or designee Date N/A N/A Approved By Date C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

Course Number Program Name Media Number OPERATIONS TRAINING 2013-301 PLANT 2 Rev. No. Date Reason for Revisions Authors Sups

[ Initials Initials 11 10/31/00 Include objective number RAB DHG 12 02/26/02 Include initial operator statement RAB RAB 13 03/17/05 Deleted S from procedure numbers, changed Revision and BEB DFIG Rev, numbers to Current Version, changed Reactor Operator to Nuclear Plant Operator, and changed IC #107 for Simulator Setup.

14 05/31/05 Revised Initial License statement for successful completion RAB RAB 15 04/06/06 Remove Response Cues RAB RAB 16 08/07/08 Corrected to match procedure step for confirming open GHC BKW 2E1 1-FOO3B.

16.1 8/11/11 Reviewed JPM against current procedure. Added pass/ fail MMG DNM criteria.

16.2 08/16/13 This JPM was modified to match procedure and ARB CME renumbered from LR-JP-07.20 for ILT-8 NRC Exam. After this exam it will be re-titled back to original LR JPM number.

2

Line Contributors The following individuals contributed to the development of this lesson plan.

Rev. No. List of Contributors 3

2013-301 PLANT 2 Page 1 of6 UNIT 1 (X) UNIT 2 (X)

TASK TITLE: FROM THE REMOTE SHUTDOWN PANEL, START RHR IN TORUS COOLING JPM NUMBER: 2013-301 PLANT 2 TASK STANDARD: The task shall be completed when the operator has successfully placed the B loop of RHR into Torus Cooling from the Remote Shutdown Panel per 31RS-OPS-001.

TASK NUMBER: 007.020 OBJECTIVE NUMBER: 007.020.O PLANT HATCH JTA IMPORTANCE RATING:

RO 3.40 SRO 3.80 K/A CATALOG NUMBER: 295016G006 K/A CATALOG SEA IMPORTANCE RATING:

RO 4.10 SRO 4.10 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit! Unit 2 N/A 31RS-OPS-001-2 (current version)

REQUIRED MATERIALS: Unit! Unit 2 N/A 3 1RS-OPS-001-2 (current version)

Key for Remote Shutdown Panel (if performed in plant)

APPROXIMATE COMPLETION TIME: 22.0 Minutes SIMULATOR SETUP: REFER TO SIMULATOR SETUP SHEET ON THE FOLLOWING PAGE IF PERFORMED iN SIMULATOR.

2013-301 PLANT 2 Page 2 of 6 SIMULATOR SETUP Simulator Initial Conditions:

1. RESET the Simulator to SNAP 622 OR IC#107 (7%, Xfer to Run) and leave in FREEZE.
2. Take the Simulator OUT OF FREEZE and PERFORM the following MANIPULATIONS:

A. Place the Mode Switch to SHUTDOWN.

B. Perform RC-1, RC-2, TC-1, and reset the scram.

C. Maintain RWL between 32 to 42 inches.

D. Place ALL the Remote Shutdown Panel Transfer switches to EMERG.

E. Place RHRSW Pump 2B in operation at <4400 gpm as indicated on 2H2 1-P 173 indicator, 2E 11 -R07 1.

3. PLACE the Simulator in FREEZE until the crew assumes the shift.
4. ESTIMATED Simulator SETUP TIME: 20 Minutes

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. An event has occurred which required the control room to be evacuated.
2. RHR is in Standby.
3. Normal AC power is available.
4. ALL RSDP transfer switches are in the EMERG position.
5. RHRSW Pump 2B is running at <4400 gpm.
6. Torus temperature is 97°F.
7. 3 1RS-OPS-OO1-2 is in progress.

INITIATING CUES:

Place RHR Loop 2B, in Torus Cooling at the Remote Shutdown Panel per 31 RS-OPS-0O 1-2.

2013-301 PLANT 2 Page 4 of 6 I STEP I I PERFORMANCE STEP SAT/UNSAT 1 I # I STANDARD I (COMMENTS)J For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U Human performance tools, safety, PPE met (1), AND U Mark the JPM as a PASS U For initial trg all steps completed correctly OR PASS U For continuing trg, critical steps (if used) completed correctly FAIL U Above standards not met U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:_______

1. Operator identifies the materials that Operator identifies the required are required. materials and where to obtain them.

PROMPT: WHEN the operator addresses transfer switch positions, INDICATE for the operator that ALL transfer switches are in the EMERG position.

PROMPT: IF the operator addresses RHRSW operation, as the Shift Supervisor, INFORM the operator that RHRSW Pump 2B is running with 4400 gpm flow.

PROMPT: IF the operator addresses Torus temperature, INDICATE for the operator that Torus temperature is <100°F.

2. Confirm CLOSED/CLOSE At panel 2C82-P001, the 2E1 1-F047B (step 3.0). following valve is CLOSED, green light ONLY illuminated:

HX INLET VLV, 2E1 1-F047B

(*

  • Indicates critical step)

2013-301 PLANT 2 Page 5 of 6 STEP PERFORMANCE STEP I SAT/UNSAT STANDARD I I (COMMENTS)

3. Confirm OPEN/OPEN 2E11-FOO3B At panel 2C82-P00 1, HX (step 3.0). OUTLET VLV, 2E1 1-FOO3B is OPEN, red light ONLY illuminated:
4. Confirm 2E11-F048B is OPEN At panel 2C82-P001, HX (step 4.0). BYPASS VLV, 2E1 1-F048B, is OPEN, red light ONLY illuminated.
  • *5 OPEN 2E1 1-F028B (step 5.0). At panel 2C82-P001, RHR TORUS SPRAY OR TEST VLV, 2El l-F028B, is OPEN, red light ONLY illuminated.
6. Confirm 2E11-FOO7B OPEN At panel 2C82-P00l, MIN (step 6.0). FLOW VLV, 2E1 1-FOO7B, is OPEN, red light ONLY illuminated.
    • 8 Throttle OPEN 2E1 1-F024B and At panel 2C82-P00l, the establish flow rate of less than or following has been performed:

equal to 7700 gpm (step 8.0). FULL FLOW TEST LINE VLV, 2E1 l-F024B, is THROTTLED OPEN, red and green lights illuminated.

RHR FLOW, 2C82-R004, indicates < 7700 gpm. (accept 6700-7700 gpm)

9. Confirm valve 2E1 1-FOO7B CLOSES At panel 2C82-P00l, MN (step 8.1). FLOW VLV, 2E1 1-FOO7B, is CLOSED, green light ONLY illuminated.

(** Indicates critical step)

2013-301 PLANT 2 Page 6 of 6 STEP I SAT/UNSAT PERFORMANCE STEP STANDARD I (COMMENTS) 1

    • 1o. Confirm OPEN/OPEN 2E11-F047B At panel 2C82-P001, the and 2E1 1-FOO3B (step 9.0). following valves are OPEN, red light ONLY illuminated:

HX NLET VLV, 2E1 l-F047B HX OUTLET VLV, 2E1 l-FOO3B 211. CLOSE 2E1 1-F048B (step 10.0). At panel 2C82-P001, HX BYPASS VLV, 2E1 1-F048B, is CLOSED, green light ONLY illuminated.

PROMPT: IF the operator addresses RHRSW to RHR dP, as a System Operator, INFORM the operator that RHRSW to RHR dP is >20 psid.

PROMPT: IF the operator addresses Torus Spray, as the Shift Supervisor, INFORM the operator that Torus Spray is NOT required at this time.

PROMPT: IF the operator addresses securing Torus Cooling, as the Shift Supervisor, INFORM the operator that this is NOT desired at this time.

END TIME:________

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 11.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

(** Indicates critical step)

Southern Nuclear Company Operations Training JPM FINAL PLANT 3 ALL Title CROSSTIE INSTRUMENT BUS B TO INSTRUMENT BUS A Author: Media Number: Time

+/-inthony Ball 2013-301 PLANT 3 15.0 Minutes Reviewed By Date N/A N/A Reviewed by Instructional Technologist or designee Date N/A N/A Approved By Date C. M. EDMUND 08/16/2013 SOUTHERN COMPANY

Course Number Pro2ram Name Media Number OPERATIONS TRAINING 2013-301 PLANT 3 Rev. No. Date Reason for Revisions Authors Sups Initials Initials 01 08/16/93 General revision RAB RSG 02 08/05/96 Format change RAB DHG Format modification, change title, change time allowance 03 03/09/00 RAB DHG based on running average, remove prompt dealing with LPCI load center 04 11/03/00 Include objective number RAB DHG 05 03/19/02 Include initial operator statement RAB RAB Revised Initial License statement for successful completion 06 06/21/05 RAB RAB 07 05/05/06 Remove Response Cues RAB RAB 07.1 10/17/ 11 Reviewed 1PM against current procedure. Added pass I fail MMG ALS criteria. Added Fundamental question to new Attachment 1.

Deleted student indentifies correct procedure, as this was given information.

7.2 08/16/13 This JPM was modified to match procedure and AR]3 CME renumbered from LR-JP-20019 for ILT-8 NRC Exam. After this exam it will be re-titled back to original LR 3PM number.

2

Line Contributors The following individuals contributed to the development of this lesson plan.

Rev. No.

[ List of Contributors 3

2013-301 PLANT 3 Page 1 of4 UNIT1 () UNIT2 (X)

TASK TITLE: CROSSTIE INSTRUMENT BUS B TO INSTRUMENT BUS A JPM NUMBER: 2013-301 PLANT 3 TASK STANDARD: The task shall be completed when Instrument Bus B is crosstied to Instrument Bus A per 34AB-R25-002.

TASK NUMBER: 200.019 OBJECTIVE NUMBER: 200.019.A PLANT HATCH JTA IMPORTANCE RATING:

RO 4.00 SRO 3.64 K/A CATALOG NUMBER: 26200 1A207 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.00 SRO 3.20 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)

GENERAL

REFERENCES:

Unit 1 Unit 2 34AB-R25-002-2 (current version)

REQUIRED MATERIALS: Unit 1 Unit 2 34AB-R25-002-2 (current version)

Unit 2 RPS MG Set Room CAT 60 key APPROXIMATE COMPLETION TIME: 15.0 Minutes SIMULATOR SETUP: N/A

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1. Unit 2 is operating at 60% power.
2. Essential Cabinet 2B, 2R25-S037, is de-energized.
3. Instrument Bus 2B, 2R25-S065, is de-energized due to the loss of Essential Cabinet 2B, 2R25-S037.
4. 34AB-R24-00l-2, Loss of Essential AC Distribution Buses, is in progress.
5. Essential Cabinet 2B, 2R25-S037, cannot be energized due to a faulted Feeder Breaker from 600 VAC Bus 2D, 2R23-S004.
6. 34AB-R25-002-2, Loss of Instrument Buses, is in progress.

INITIATING CUES:

Energize Instrument Bus 2B, 2R25-S065, from Instrument Bus 2A, 2R25-S064, per 34AB-R25-002-2.

2013-30 1 PLANT 3 Page 3 of 4 I STEP I I PERFORMANCE STEP STANDARD SAT!UNSAT i#1 I (COMMENTS) 1 For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN Human performance tools, safety, PPE met (1), AND Mark the JPM as a PASS Li For initial trg all steps completed correctly OR PASS Li For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met Li Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences. (AG-TRN-O1-0685 Section 6.5.3 provides examples)

START TIME:_______

    • 1. At Essential Cabinet 2B, At Essential Cabinet 2B, 2R25-S037, OPEN Breaker 28 2R25-S037, Breaker 28, (step 4.5.1.1). 1201208V CAB 2C INSTR BUS 2B, is OPEN. Breaker switch is in the OFF position.
    • 2 In the Unit 2 RPS M/G Set Room, at At Instrument Bus 2B, Instrument Bus 2B, 2R25-S065, 2R25-S065, Breaker 40, CLOSE Breaker 40 (step 4.5.1.2). CROSSTIE TO INSTR BUS 2A, is CLOSED. Breaker switch is in the ON position.
    • 3 At Instrument Bus 2A, 2R25-S064, At Instrument Bus 2A, CLOSE Breaker 39 (step 4.5.1.3). 2R25-S064, Breaker 39, CROSSTIE TO INSTR BUS 2B, is CLOSED. Breaker is in the ON position.

(*

  • Indicates critical step)

2013-301 PLANT 3 Page 4 of 4 STEP PERFORMANCE STEP I SAT/UNSAT I # I STANDARD I (COMMENTS)

    • 4 At Essential Cabinet 2B, OPEN At Essential Cabinet 2B, switch switch 2R26-M004 and REMOVE 2R26-M004 is OPEN and both both keys (step 4.5.1.4). keys are removed.

CLOSE the switch (step 4.5.1.5).

CLOSE the switch (step 4.5.1.6).

PROMPT: IF the operator addresses restoring any of the loads of the Instrument Bus, as the Shift Supervisor, INFORM the operator that another operator will perform the load restoration.

END TIME:________

NOTE: The terminating cue shall be given to the operator when:

When the operator completes step 6.

With NO reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

  • Indicates critical step)