Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] Category:License-Operator
MONTHYEARML24005A1162024-01-0505 January 2024 301 Exam Comment 2 ML23206A0532023-07-25025 July 2023 2A, Exam Draft Items (Hatch 2021-301) ML23206A0332023-07-25025 July 2023 2B, Exam Administrative Items (Hatch 2021-301) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 ML21095A3132023-03-23023 March 2023 301 Final SRO Written Exam ML22213A0502022-08-0101 August 2022 2022 Requalification Program Inspection Notification Letter - Hatch Nuclear Station NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21333A2762021-11-29029 November 2021 302 Exam Approval Letter ML21096A3312021-04-0505 April 2021 Corporate Notification Letter (Aka 210 Day) ML21095A3062021-04-0505 April 2021 301 Final RO Written Exam ML21057A2822021-02-24024 February 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19308A4592019-11-0404 November 2019 Exam Administrative Items (Normal Release) ML19275K8702019-10-0202 October 2019 301 Post Exam Comments ML19218A3792019-08-0606 August 2019 Operator Licensing Written Examination Approval 05000321/2019301 and 05000366/2019301 ML19099A2872019-04-0909 April 2019 2019 Schedule Confirmation for Hatch ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18057B0452018-02-26026 February 2018 NRC RO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18057B0512018-02-26026 February 2018 NRC SRO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18057B0802017-10-17017 October 2017 Operating Post Examination Comments NL-17-1767, Hatch 2017 301 Operating Post Examination Comments2017-10-17017 October 2017 Hatch 2017 301 Operating Post Examination Comments ML17187A2272017-07-0606 July 2017 Hat 2016-301 Exam Final Items - Delay Release 2 Yrs ML17187A2252017-07-0606 July 2017 Hat 2016-301 Exam Draft Items - Delay Release 2 Yrs ML17187A2292017-07-0606 July 2017 Hat 2016-301 Exam Administrative Items - Delay Release 2 Yrs ML17052A6842017-02-15015 February 2017 Notification of Licensed Operator Initial Examination 05000321/2017301 and 05000366/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 IR 05000321/20163012016-09-0707 September 2016 NRC Operator License Examination Report 05000321/2016301 and 05000366/2016301 ML16214A1802016-08-0101 August 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release ML16214A1942016-08-0101 August 2016 Initial Exam 2016-301 Post Exam Comments - Delay Release ML16214A1892016-08-0101 August 2016 Initial Exam 2016-301 Final SRO Written - Delay Release ML16166A4392016-06-13013 June 2016 E.I. Hatch - Operator Licensing Written Examination Approval 05000321/2016301 and 05000366/2016301 ML15176A5702015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator in Plant JPMs ML15176A5802015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative JPMs ML15176A5432015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15176A5412015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative Documents ML15175A4632015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15175A4622015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator In-plant JPMs ML15175A4582015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15175A4492015-06-22022 June 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15175A4432015-06-22022 June 2015 Initial Exam 2015-301 Draft RO Written Exam ML15175A4292015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrave Documents ML15223B3212015-05-21021 May 2015 Initial Exam 2011-301 Draft Simulator Scenarios ML15105A2902015-04-0909 April 2015 Initial Exam 2015-301 Final SRO Written Exam ML15105A2842015-04-0909 April 2015 Initial Exam 2015-301 Final RO Written Exam ML14344A3712014-12-0808 December 2014 Notification of Licensed Operator Initial Examination 05000321/05000321/2015301 and 05000366/2015301 2024-01-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24005A1162024-01-0505 January 2024 301 Exam Comment 2 ML23206A0332023-07-25025 July 2023 2B, Exam Administrative Items (Hatch 2021-301) ML23206A0532023-07-25025 July 2023 2A, Exam Draft Items (Hatch 2021-301) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 ML21095A3132023-03-23023 March 2023 301 Final SRO Written Exam NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21333A2762021-11-29029 November 2021 302 Exam Approval Letter ML21096A3312021-04-0505 April 2021 Corporate Notification Letter (Aka 210 Day) ML21095A3062021-04-0505 April 2021 301 Final RO Written Exam ML21057A2822021-02-24024 February 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML19308A4592019-11-0404 November 2019 Exam Administrative Items (Normal Release) ML19275K8702019-10-0202 October 2019 301 Post Exam Comments ML19218A3792019-08-0606 August 2019 Operator Licensing Written Examination Approval 05000321/2019301 and 05000366/2019301 ML19099A2872019-04-0909 April 2019 2019 Schedule Confirmation for Hatch NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18057B0452018-02-26026 February 2018 NRC RO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18057B0512018-02-26026 February 2018 NRC SRO Written Exam with Answer Key and List of References (Delay Release 2 Yrs) ML18057B0802017-10-17017 October 2017 Operating Post Examination Comments NL-17-1767, Hatch 2017 301 Operating Post Examination Comments2017-10-17017 October 2017 Hatch 2017 301 Operating Post Examination Comments ML17187A2272017-07-0606 July 2017 Hat 2016-301 Exam Final Items - Delay Release 2 Yrs ML17187A2292017-07-0606 July 2017 Hat 2016-301 Exam Administrative Items - Delay Release 2 Yrs ML17187A2252017-07-0606 July 2017 Hat 2016-301 Exam Draft Items - Delay Release 2 Yrs ML17052A6842017-02-15015 February 2017 Notification of Licensed Operator Initial Examination 05000321/2017301 and 05000366/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 IR 05000321/20163012016-09-0707 September 2016 NRC Operator License Examination Report 05000321/2016301 and 05000366/2016301 ML16214A1802016-08-0101 August 2016 Initial Exam 2016-301 Final RO Written Exam - Delay Release ML16214A1942016-08-0101 August 2016 Initial Exam 2016-301 Post Exam Comments - Delay Release ML16214A1892016-08-0101 August 2016 Initial Exam 2016-301 Final SRO Written - Delay Release ML15175A4622015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator In-plant JPMs ML15176A5802015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative JPMs ML15176A5702015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator in Plant JPMs ML15176A5432015-06-22022 June 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15176A5412015-06-22022 June 2015 Initial Exam 2015-301 Final Administrative Documents ML15175A4632015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15175A4582015-06-22022 June 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15175A4432015-06-22022 June 2015 Initial Exam 2015-301 Draft RO Written Exam ML15175A4492015-06-22022 June 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15175A4292015-06-22022 June 2015 Initial Exam 2015-301 Draft Administrave Documents ML15223B3212015-05-21021 May 2015 Initial Exam 2011-301 Draft Simulator Scenarios ML15105A2842015-04-0909 April 2015 Initial Exam 2015-301 Final RO Written Exam ML14344A3712014-12-0808 December 2014 Notification of Licensed Operator Initial Examination 05000321/05000321/2015301 and 05000366/2015301 IR 05000321/20050002014-12-0808 December 2014 Edwin I. Hatch - Notification of Licensed Operator Initial Examination 05000321/05000321/2015301 and 05000366/2015301 ML13324A6022013-11-18018 November 2013 Initial Exam 2013-301 Final Simulator Scenarios ML13324A5982013-11-18018 November 2013 Initial Exam 2013-301 Final Sim IN-plant JPMs ML13324A2102013-11-18018 November 2013 Initial Exam 2013-301 Draft Administrative Documents ML13324A2282013-11-18018 November 2013 Initial Exam 2013-301 Draft RO Written Exams ML13324A5902013-11-18018 November 2013 Initial Exam 2013-301 Final Administrative JPMs 2024-01-05
[Table view] |
Text
UNITED STATES ber 7, 2016
SUBJECT:
EDWIN I. HATCH - NRC OPERATOR LICENSE EXAMINATION REPORT 05000321/2016301 AND 05000366/2016301
Dear Mr. Vineyard:
During the period June 20 - 29, 2016, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Edwin I. Hatch Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on July 7, 2016.
Six Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. One RO applicant failed the operating test and written examination. There were four post-administration comments concerning both the operating test and written examination. These comments, and the NRC resolution of these comments, are summarized in Enclosure 2. A Simulator Fidelity Report is included in this report as Enclosure 3.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 10.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4551.
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos: 50-321, 50-366 License Nos: DPR-57, NPF-5
Enclosures:
1. Report Details 2. Facility Comments and NRC Resolution 3. Simulator Fidelity Report
REGION II==
Docket No.: 50-321, 50-366 License No.: DPR-57, NPF-5 Report No.: 05000321/2016301 and 05000366/2016301 Licensee: Southern Nuclear Operating Company (SNC)
Facility: Edwin I. Hatch Nuclear Plant, Units 1 and 2 Location: Baxley, GA Dates: Operating Test - June 20-29, 2016 Written Examination - July 7, 2016 Examiners: J. Viera, Chief Examiner, Operations Engineer P. Presby, Senior Operations Engineer J. Bundy, Operations Engineer Approved by: Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Enclosure 1
SUMMARY
ER 05000321/2016301, 05000366/2016301; June 20-29, 2016 & July 7, 2016; Edwin I. Hatch
Nuclear Plant; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Edwin I. Hatch Nuclear Plant staff developed both the operating tests and the written examination. The initial operating tests, written Reactor Operator (RO) examination, and written Senior Reactor Operator (SRO) examination submittals met the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period June 20-29, 2016. Members of the Edwin I. Hatch Nuclear Plant training staff administered the written examination on July 7, 2016.
Six Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. Eleven applicants were issued licenses commensurate with the level of examination administered.
There were four post-examination comments.
No findings were identified.
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
a. Inspection Scope
The NRC evaluated the submitted operating test by combining the scenario events and job performance measures (JPMs) in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the operating tests during the period June 20-29, 2016. The NRC examiners evaluated seven RO and five SRO applicants using the guidelines contained in NUREG-1021. Members of the Edwin I. Hatch Nuclear Plant training staff administered the written examination on July 7, 2016. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Edwin I. Hatch Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
b. Findings
No findings were identified.
The NRC developed the written examination sample plan outline. Members of the Edwin I. Hatch Nuclear Plant training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 10 of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
No issues related to examination security were identified during preparation and administration of the examination.
Six RO applicants and five SRO applicants passed both the operating test and written examination. One RO applicant did not pass the operating test or written examination.
Six RO applicants and five SRO applicants were issued licenses.
One RO applicant passed the operating test, but passed the written examination with an overall score between 80% and 82%. This applicant was issued a letter stating that they passed the examination and issuance of their license has been delayed pending any written examination appeals that may impact the licensing decision for their application.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted three post-examination comments concerning the operating test and one post-examination comment concerning the written examination. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than July 7, 2018, and a copy of the licensees post-examination comments, may be accessed in the ADAMS system (ADAMS Accession Numbers ML16214A180, ML16214A189 and ML16214A194).
4OA6 Meetings, Including Exit
Exit Meeting Summary
On July 29, 2016 the NRC examination team discussed generic issues associated with the operating test with David Vineyard, Site Vice President, and members of the Edwin I. Hatch Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel David Vineyard, Site Vice President Tony Spring, Plant Manager Chuck Vonier, Operations Director Brad Deen, Training Director Greg Johnson, Regulatory Affairs Manager Russell Lewis, Operations Support Manager Ed Jones, Nuclear Operations Training Instructor - Lead Anthony Ball, Lead Exam Developer Richard Greenhouse, Exam Developer Art Genereax, Exam Developer Jerry Thomas, Initial Nuclear Operations Training Instructor John Campbell, Initial Nuclear Operations Training Instructor
FACILITY POST-EXAMINATION COMMENTS AND NRC RESOLUTIONS
A complete text of the licensees post-examination comments can be found in ADAMS under
Accession Number ML16214A194.
Item #1: RO / SRO Written Exam Question # 56
Post-Examination Comment
During administration of the written examination, two applicants provided questions seeking
clarification for the second half answer choices to Question # 56 (Q56). The licensee contended
that these Q56 answer choices were open to interpretation, contained ambiguity, and required
revision. Use of the Q56 term, ILLUMINATED, or annunciator in alarm as an answer choice,
implied control panel annunciator indication of either SOLID GREEN (annunciator in non-
alarming condition) or FLASHING WHITE (annunciator in alarming condition). The licensee
recommended a revision of the second half answer choices to remove this ambiguity:
NRC Resolution
The entire text of Q56 is included below.
The licensees recommendation was partially accepted.
Following discussion with the facility examination team and based, in part, on the applicant
questions provided, the Chief Examiner concluded that the provided answer choices of
ILLUMINATED and EXTINGUISHED were not specific to actual control board annunciator
response with no operator action, did not definitively elicit the asked-for knowledge, and
required revision.
In Post Exam Comment #1, the licensee recommended adoption of revised answer choices for
Q56 to remove ambiguity and elicit the asked-for knowledge, i.e. alarm status of annunciator
603-141. This was performed during administration of the written examination as a result of
questions raised by several applicants where the licensee staff and the chief examiner jointly
agreed that the wording was ambiguous.
Therefore, the second half answer choices for Q56 are revised to read FLASHING WHITE and
SOLID GREEN and all applicants were informed of the revised wording during administration of
the written examination. The correct answer choice for Q56 remains answer choice
- D.
Item #2: Administrative Topic d, 2016-301 ADMIN 5, Evaluate an RWP and Survey Map
Post-Examination Comment
The licensee contended that job performance measure (JPM) Step 1 required reclassification
from CRITICAL to non-CRITICA
- L. As a basis, the licensee contended that the provided
radiological survey map contained no areas with an indicated dose rate > 1000 mRem/hour in
the JPM specified work area, Unit 1 Turbine Building Condenser Bay 147 elevation. JPM Step
1, with accompanying NOTE, is included below.
A portion of Radiation Work Permit (RWP) 16-0164 is included below.
A portion of RWP 16-004 is included below.
NRC Resolution
The licensees recommendation was not accepted.
Although the JPM provided survey map contained no areas with an indicated dose rate > 1000
mRem/hour (i.e. the radiological dose rate requiring designation of an area as a Locked High
Radiation Area (LHRA)), the given plant condition of operation at 20% reactor power
procedurally required LHRA posting of all access doors into the Unit 1 Turbine Building
Condenser Bay. Knowledge of this procedural requirement was required to perform JPM step 1.
The task standard for this JPM is included below.
For this JPM, the following information, in part, was provided to each applicant.
Procedurally, during preparations to perform a reactor startup, the locking of High Radiation
Areas (HRAs) is commenced in accordance with 34GO-OPS-003-1, Startup System Status
Checklist, Version 12.19.
The process of LHRA posting verification is completed in accordance with performance of
2RP-RAD-019-0, Radiation Protection Start-Up Surveillance, Version 10.0.
A portion of HPX-1082, Unit One High Radiation Area Entrance Surveillance at 20% Power,
which provides a listing of the entry doors into High Radiation areas is provided below.
In Post Exam Comment #2, the licensee recommended revising JPM Step 1 from CRITICAL to
non-CRITICAL based on a lack of indicated radiological dose rate information in the provided
survey map. However, a procedural basis did exist for the conditions specified in the JPM and
indicate that the doors which permit entry into the Unit 1 Turbine Building Condenser Bay (112
CONBAY NORTH, 130 CONBAY EAST, and 130 CONBAY NORTH), would be verified to be
locked and posted as a LHRA with Unit 1 operating at a minimum of 20% reactor power.
Therefore, since a procedural basis exists that validates the licensee provided JPM standard for
applicant selection of RWP 16-0164, JPM step 1 remains a CRITICAL step.
Item #3: Systems - Control Room JPM c, CR-SIM 3 2016-301, Override the MSIVs in an
Emergency
Post-Examination Comment
During the performance of this job performance measure (JPM), several license applicants
commenced opening an Inboard Main Steam Isolation Valve (MSIV) with a differential pressure
(d/p) in excess of the procedurally prescribed 200 pounds-per-square inch differential (psid).
The licensee contended that further analysis would be required to determine the consequence
of opening an Inboard MSIV with this d/p.
NRC Resolution
The licensees comment was accepted.
In Post Exam Comment #3, the licensee recommended that additional analysis would be
required to determine the consequence of MSIV operation with a d/p in excess of procedural
limits during the performance of this JP
- M.
Therefore, the NRC accepts that any MSIV operation with a d/p in excess of procedural limits
could result in MSIV damage during the performance of this JP
- M.
Item #4: Systems - Control Room JPM f, CR-SIM 6 2016-301, Transfer an Emergency 4160
VAC Bus from the Emergency to the Normal Power Supply
Post-Examination Comment
During performance of this job performance measure (JPM), actions taken by a license
applicant resulted in the inadvertent trip of the running emergency diesel generator (EDG). The
licensee contended that no equipment damage or personnel injury would result from an
inadvertent reverse power trip of the EDG. The basis for this contention lies in the automatic
TRIP of the EDG output breaker and automatic shutdown of the running EDG.
NRC Resolution
The licensees comment was accepted.
In Post Exam Comment #4, the licensee recommended that there was no adverse plant impact
from an inadvertent reverse power trip of the EDG during the performance of this JP
- M.
Therefore, the NRC accepts that an inadvertent reverse power trip of the running EDG during
performance of this JPM would result in no adverse impact to the EDG.
SIMULATOR FIDELITY REPORT
Facility Licensee: Edwin I. Hatch Nuclear Plant
Facility Docket No.: 50-321, 50-366
Operating Test Administered: June 20-29, 2016
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with Inspection
Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee
action is required in response to these observations.
No simulator fidelity or configuration issues were identified.
3