ML060660570

From kanterella
Revision as of 17:27, 28 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
03/29/2006 Notice of Public Meeting with Dominion Nuclear Connecticut, Inc. NRC Presentation of Millstone Annual Assessment Results to the Nuclear Energy Advisory Council (Neac)
ML060660570
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/10/2006
From: Krohn P G
NRC/RGN-I/DRP/PB6
To:
Krohn P G, RI/DRP/PB6/610-337-5120
Shared Package
ML060660562 List:
References
MN 06-008
Download: ML060660570 (5)


Text

MN No. 06-008U.S. NUCLEAR REGULATORY COMMISSIONREGION INOTICE OF PUBLIC MEETINGMarch 10, 2006Licensee:Dominion Nuclear Connecticut, Inc.

Facility:Millstone Power Station, Units 2 and 3Docket No:50-336 and 50-423 Date/Time:March 29, 2006, 6:00 p.m.

Location:Waterford Town Hall15 Rope Ferry Road Waterford, CT 06385Purpose:NRC Presentation of Millstone Annual Assessment Results to the NuclearEnergy Advisory Council (NEAC) as documented in a letter to Dominion Nuclear Connecticut dated March 2, 2006.Attendees:NRC:D. Lew, Deputy Director, Division of Reactor Projects, Region IP. Krohn, Chief, Project Branch 6, Division of Reactor Projects S. Barber, Senior Project Engineer, S. Kennedy, Senior Resident Inspector, Millstone (Acting)J. Benjamin, Resident Inspector, MillstoneNEAC:W. Sheehan, Co-Chair E. Woollacott, Co-Chair Other NEAC membersPublic Participation:This is a Category 1 Meeting. The public is invited to observe themeeting. After the business portion, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regardingDominion Nuclear Connecticut's performance at Millstone Station and therole of the agency in ensuring safe plant operations.NRC's assessment letter can be found in ADAMS with an accession number of ML060610628. This meeting Notice with attached meeting agenda can be located in ADAMS with an accession number of ML060660570. ADAMS is accessible from the NRC Web Site athttp://www.nrc.gov/reading-rm/adams.html

.Additional information relative to the NRC's Annual Assessment process and the safetyperformance of Millstone Station can be found on the NRC Web Site at:http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

.

2Meeting Contact:Paul Krohn, Chief, Projects Branch 6(610) 337-5120 E-mail: pgk1@nrc.gov*Handicapped persons requiring assistance to attend or participate in the meeting shallmake their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known byMarch 27, 2006, via telephone to the NRC meeting contact.Please feel free to contact me in advance if there are any particular topics of interest that youwould like to discuss at the meeting.Approved by:/RA/Paul G. Krohn, ChiefProjects Branch 6 Division of Reactor Projects 3Distribution

D. A. Christian, Sr. Vice President and Chief Nuclear Officer J. A. Price, Site Vice President, Millstone C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations W. Meinert, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford V. Juliano, Waterford Library W. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility ControlG. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

AgendaNRC's Annual Assessment Meeting with NEAC Waterford Town HallMarch 29, 2006Introduction

..................................................NRC (3 minutes)Review of Reactor Oversight Process..............................NRC (5 minutes)National Summary of Plant Performance

............................NRC (7 minutes)Discussion of Millstone Station Performance

........................NRC (15 minutes)NEAC's Response and Questions...............................NEAC (20 minutes)Closing Remarks...............................................NRC (5 minutes)Short Break........................................................(5 minutes)

NRC to address public questions

...............NRC/Members of the Public (as needed)

ML060660570 Document Name: E:\Filenet\ML060660570.wpdSISP Review Complete: ___PGK______ (Reviewer's Initials)After declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure

" E" = Copy with attachment/enclosure " N" = No copyOFFICERI/DRPRI/DRP NAMEBNorris/BSNPKrohn/PGKDATE03/10/0603/10/06