ML102870245

From kanterella
Revision as of 05:11, 19 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

October 13, 2010, Summary of Teleconference Held Between the U.S. NRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station License Renewal Application
ML102870245
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/25/2010
From: Gettys E H
License Renewal Projects Branch 1
To:
Gettys E H, NRR/DLR, 415-4029
References
TAC ME3058
Download: ML102870245 (5)


Text

LICENSEE:

FACILITY:

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 25, 2010 Energy Northwest Columbia Generating Station

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 13, 2010 , BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST , CONCERNING THE DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE CO LUM BIA GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO. ME3058) The U.S. Nuclear Regulatory Comm i ssion (NRC) and representat iv es of Energy Northwest, held a telephone conference ca ll on October 13, 2010, to discuss and clarify the NRC's draft request for additional information (D-RAI) concerning the Columbia Generating Station, license renewal application.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the D-RAls discussed with the applicant, including a brief description on the status of the items. The applicant h ad an opportunity to comment on this summary. Docket No. 50-397

Enclosures:

As stated cc w/encls: Distribution via Listserv Evelyn H. Gettys, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation PARTICIPANTS Evelyn Gettys Bart Fu Abbas Mostala Scott Wood Marsha Eades David Lee TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS October 13, 2010 AFFILIATIONS U.S. Nuclear Regulatory Commission (NRC) NRC Energy Northwest (EN) EN EN AREVA ENCLOSURE 1

TELEPHONE CONFERENCE CALL COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION October 13, 2010 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Energy Northwest (the applicant) held a telephone conference call on October 13, 2010, to discuss the following draft request f or additional information (D-RAI) concerning the Columbia Generating Station license renewa l application (LRA). Draft Small Bore Piping Program D-RAI B.2.49-2 Background LRA Section B.2.49 states that the Small Bore Piping Program is a new plant-specific program that wi ll detect and characterize cracking in small-bore piping components that are exposed to reactor coolant. In the "detection of aging effects" program element the applicant stated that in-scope components will be grouped into populations based on component type, materia l, and environment. The applicant also stated that the sample size will be 10 percent of each population (except for socket welds) with a minimum of one location and a maximum of 20 locations; the socket weld sample will include three locations.

Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants Section A.1.2.3.4 states that this program element shou l d describe "when," "where," and "how" program data are collected (i.e., all aspects of activities to collect data as part of the program).

It also states that when sampling is used to inspect a group of structures and components, a basis should be provided for the inspection population and sample size that is selected.

The applicant stated the number of socket welds to be examined as a part of the Small Bore Piping Program; however, it does not state the total number of such welds in the plant (i.e., the sample population).

The staff is unable to determine the sample size for socket welds as a percentage of the total number of such welds present to assess whether the sample size is suff i cient to be representative of the total socket weld sample population.

Reguest Provide and justify the sampling information that is selected, in terms of number of welds and percent of welds to be inspected, for the volumetric examinations of socket welds for both nondestruct i ve and/or destructive examinations.

Discussion:

The applicant understands the question and the staff will send a formal RAI. ENCLOSURE 2

October 25, 2010 LI CENSEE: Energy Northwest FAC ILITY: Columbia Generating Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 13, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST , CONCERNING THE DRAFT REQUEST FOR ADDITIONAL INFORMATION PER T AINING TO THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO. ME3058) The U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest, held a telephone conference call on October 13, 2010, to discuss and clarify the NRC's draft request for additional in formation (D-RAI) concerning the Columbia Generat i ng Station , lic ense renewal application.

Enc l osure 1 provides a listing of the partic i pants and Enclosure 2 contains a listing of the D-RAls discussed with the applicant, including a brief description on the status of the items. The applicant had an opportunity to comment on this summary. Docket No. 50-397

Enclosures:

As stated cc w/encls: Distribution via Listserv DISTRIBUTION:

See next page IRA! Evelyn H. Gettys , Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation ADAMS Accession No. ML 102870245 OFF I CE PM:RPB1 :DLR LARPOB:DLR BC: RPB1 : DLR PM:RPB1 :DLR NAME EGettys YEdmonds BPham EGettys (Signatur e) DATE 10/21/10 10/21/10 10/25/10 10/25/10 OFFICIAL RECORD COPY Memorandum to Energy Northwest from Evelyn H. Gettys dated October 25,2010