Monthly Operating Rept for Oct 1991 for Harris Unit 1.W/ 911112 Ltr
ML18010A443
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1991
From: CRENSHAW A, RICHEY R B
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913024-(O), NUDOCS 9111200311
Download: ML18010A443 (9)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9111200311 DOC.DATE: 91/10/31 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.

Carolina Power&Light Co.RICHEY,R.B.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R

SUBJECT:

Monthly operating rept for Oct 1991 for Harris Unit 1.W/911112 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL~SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.D 05000400 A RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.

INTERNAL: ACRS AEOD/DS P/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR DL LPEB10 LE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR.24 ENCL 24 A D D A Carolina Power&Light Company NOV J o]99~File Number: SHF/10-15505 Letter Number: HO-913024 (0)Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.1 DOCKET NO.50-400 LICENSE NO.NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6'.1.5 for the Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1991.Yours very truly, APC:svm Enclosure R.B.Richey Vice President Harris Nuclear Project cc: Mr.S.D.Ebneter (NRC-RII)Mr.R.G.Oehl (DOE)Mr.J.E.Tedrow (NRC-SHNPP) 23.0004 MEM/DATAREP/OS4.

9ii1200311 9ii03i.PDR ADGCK 05000400 R-PDR DOCKET NO.: UNIT: DATE: COMPLETED BY: 050-400 Harris Unit 1 October 1991 Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 99.07 percent Capacity Factor.There was one event.Details are provided on the Unit Shutdowns and Power Reduction Sheets.There are, 157 fuel assemblies in the reactor vessel, 647 spent fuel assemblies stored in the Spent Fuel Pools.413 of the spent fuel a'ssemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.70 of the spent fuel assemblies are from CP&L's Robinson Plant.MEM/DATAREP/1/OS4

CPhL CO RUN DATE 1</12/91 RUN TIME18: 22: 86 Pl NT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE RPD36-008 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2888 UNIT NAME: HARRIS UNIT 1 NOTES 2.REPORTING PERIOD: OCTOBER 91 I 3.LICENSED THERMAL POWER (MWT): 2775 i See Operations Summary.4.NAMEPLATE RATING (GROSS MWE): 950.9 I 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0)6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.8 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: none 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): none 38.REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL)3.REACTOR RESERVE SHUTDOWN HRS 34.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN.(MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS BCHED.OVER NEXT 6 MONTHS 745.00 745.00.00 745.00.00 2080843.82 676274.00 634727.00 388.88 108.88 99.87 94.66.00 (TYPE, DATEI 7296.80 5677.9f.00 5617.75.00 14978653.82 5813623.88 4670266.00 77.00 77.80 74.43 71 F 12.99 AND DURATION 39457.80 31524.00.80 31890.10.00 82033897.32 27265557.00 25347436.00 78.79 78.79 74.70 71.38 4.03 OF EACH): none 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICAI ITY INITIAL ELECTRICITY COMMERCIAL OPERATION MEM/DATAREP/2/OS4 1.16-9 1'lr CPbL CO P~NT PERFORMANCE DATA SYSTEH'UN DATE 33/$2/9<APPE~B-AVERAGE DAILY POWER LEVE~RUN TINE10:22:03 HARRIS UNIT PAGE RPD39-000 OCTOBER 1991 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY ANANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG.DAILY POWER LEVEL (AWE-NET)876 873 875 854 17 20 886 884 881 887 203 710 881 882 22 880 875 877 875 30 880 881 881 885 884 878 885 28 30 875 876 876 879 884 1.16-8 MEM/DATAREP/3/084 UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

Harris 11/05/94, i A.P.Crenshad (919)362-2808 REPORT MONTH: October 1991 No.Date T'P e Duration (Hours)R~e a s 0 n Method of Shutting Down Reactor'icensee Event Report¹System Code 4 Component Code 5 Cause 5 Corrective Action to Prevent Recurrence 91%17-.911004 S 0.0 N/A CB PUMPXX Reduced unit power to 21%to add oil to"B" Reactor Coolant Pump lower oil'eservoir.

Approximately 3 gallons of oil-were added.While power was reduced, various secondary plant maintenance and a turbine valve test were performed.

Unit returned to 100%power at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on,10-6-91.

F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8r, License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG%161) 5 Exhibit 1-Same Source MEM/DATAREP/4/OS4 0 k~e~N~l~r~k