ML18010A443

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1991 for Harris Unit 1.W/ 911112 Ltr
ML18010A443
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1991
From: Crenshaw A, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913024-(O), NUDOCS 9111200311
Download: ML18010A443 (9)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9111200311 DOC.DATE: 91/10/31 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CRENSHAW,A. Carolina Power & Light Co.

RICHEY,R.B. Carolina Power 6 Light Co.

R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1991 for Harris Unit 1.W/

911112 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL ~ SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 LA 3 3 PD2-1 PD 1 1 MOZAFARI,B. 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR DL LPEB10 1 1 NRR/DOEA/OEAB 1 1 LE 01 1 1 RGN2 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR NSIC 1 1 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR . 24 ENCL 24

A Carolina Power & Light Company NOV J o ]99~

File Number: SHF/10-15505 Letter Number: HO-913024 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6 '.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1991.

Yours very truly, R. B. Richey Vice President Harris Nuclear Project APC:svm Enclosure cc: Mr. S. D. Ebneter (NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J. E. Tedrow (NRC-SHNPP) 23.0004 MEM/DATAREP/OS4.

9ii1200311 9ii03i.

PDR R-ADGCK 05000400 PDR

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: October 1991 COMPLETED BY: Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 99.07 percent Capacity Factor. There was one event. Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are, 157 fuel assemblies in the reactor vessel, 647 spent fuel assemblies stored in the Spent Fuel Pools. 413 of the spent fuel a'ssemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant. 70 of the spent fuel assemblies are from CP&L's Robinson Plant.

MEM/DATAREP/1/OS4

CPhL CO Pl NT PERFORMANCE DATA SYSTEM PAGE RUN DATE 1</12/91 OPERATING DATA REPORT RPD36-008 RUN TIME18: 22: 86 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW OPERATING STATUS TELEPHONE (919)362-2888 UNIT NAME: HARRIS UNIT 1 NOTES

2. REPORTING PERIOD: OCTOBER 91 I
3. LICENSED THERMAL POWER (MWT): 2775 i See Operations Summary.
4. NAMEPLATE RATING (GROSS MWE): 950.9 I
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 )
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.8
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: none
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): none
38. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE
11. HOURS IN REPORTING PERIOD 745.00 7296.80 39457.80
12. NUMBER OF HOURS REACTOR CRITICAL 745.00 5677.9f 31524.00

)3. REACTOR RESERVE SHUTDOWN HRS .00 .00 .80

34. HOURS GENERATOR ON LINE 745.00 5617.75 31890.10
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2080843.82 14978653.82 82033897.32
17. GROSS ELEC. ENERGY GEN. (MWH) 676274.00 5813623.88 27265557.00
18. NET ELEC. ENERGY GENERATED (MWH) 634727.00 4670266.00 25347436.00
19. UNIT SERVICE FACTOR 388.88 77.00 78.79
20. UNIT AVAILABILITYFACTOR 108.88 77.80 78.79
21. UNIT CAP. FACTOR (USING MDC NET) 99.87 74.43 74.70
22. UNIT CAP. FACTOR (USING DER NET) 94.66 71 F 12 71.38
23. UNIT FORCED OUTAGE RATE .00 .99 4.03
24. SHUTDOWNS BCHED. OVER NEXT 6 MONTHS (TYPE, DATEI AND DURATION OF EACH):

none

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICAI ITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 9 MEM/DATAREP/2/OS4

1' lr

CPbL CO P~NT PERFORMANCE DATA SYSTEH PAGE

'UN DATE 33/$ 2/9< APPE~ B AVERAGE DAILY POWER LEVE~ RPD39-000 RUN TINE10:22:03 HARRIS UNIT DOCKET NO. 050-400 COMPLETED BY ANANDA CRENSHAW TELEPHONE (919)362-2808 OCTOBER 1991 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (AWE-NET) 876 17 886 873 884 875 881 854 20 887 203 710 22 880 881 875 877 882 875 30 880 875 881 876 881 28 876 885 879 884 30 884 878 885 1.16 8 MEM/DATAREP/3/084

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 11/05/94, i COMPLETED BY: A. P. Crenshad TELEPHONE: (919) 362-2808 REPORT MONTH: October 1991 T' R~ Method Cause 5 Corrective No. Date Duration e of System Component Action to (Hours) a Shutting Event Code 4 Code 5 Prevent Recurrence P

e s Reactor'icensee Down Report ¹ 0

n 91%17-. 911004 S 0.0 N/A CB PUMPXX Reduced unit power to 21% to add oil to "B" Reactor Coolant Pump lower oil Approximately 3 gallons of oil-

'eservoir.

were added. While power was reduced, various secondary plant maintenance and a turbine valve test were performed. Unit returned to 100% power at approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on,10-6-91.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG%161)

E-Operator Training 8r, License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

MEM/DATAREP/4/OS4

0 e ~

k ~

N ~l

~ r~

k