Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-84-603, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) | 10 April 1987 | Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) | |
IA-84-617, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) | 10 April 1987 | Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7) | |
IA-84-643, Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) | 10 April 1987 | Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) | |
IA-84-645, Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) | 10 April 1987 | Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7) | |
IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR | 27 June 1986 | Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR | Nondestructive Examination |
IR 05000508/1979010 | 30 March 1981 | Ack Receipt of Informing NRC of Steps Taken to Correct Item C in Notice of Violation from IE Insp Repts 50-508/79-10 & 50-509/79-08 | |
IR 05000508/1981008 | 8 July 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-508/81-08 & 50-509/81-08 | |
IR 05000508/1981014 | 8 July 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-508/81-14 & 50-509/81-14 | |
IR 05000508/1982004 | 8 July 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-508/82-04 | |
IR 05000508/1985006 | 25 October 1985 | Forwards Evaluation Rept 50-508/85-06 on 850801-0913. Engineering Assurance Program Plan Provides Satisfactory Assessment of Design & Design Process & Acceptable | |
IR 05000508/1986007 | 15 July 1986 | Forwards Insp Rept 50-508/86-07 on 851009 & 0324-27.No Violations Noted.Acceptability of Design Insp Plan Re Engineering Assurance Program Module 1 (Piping/Pipe Supports) Reviewed | |
IR 05000508/1987002 | 24 February 1987 | Forwards Insp Rept 50-508/87-02 on 870202-05.No Violations Identified | |
ML20054G841 | 7 June 1982 | Forwards IE Insp Rept 50-508/82-10 on 820503-07 & 17-21.No Noncompliance Noted | |
ML20054H346 | 15 June 1982 | Ack Receipt of Documents Re OL Application,Including General & Financial Info,Fsar,Environ Rept,Antitrust Info & Physical Security & Safeguards Contingency Plans.Acceptance Review Process Initiated | Safeguards Contingency Plan |
ML20054H870 | 16 June 1982 | Responds to 811130 & 820316 Petitions on Behalf of Coalition for Safe Power.Petitions Denied Based on Encl Director'S Decision | |
ML20054J347 | 22 June 1982 | Requests Addl Info Re 820604 Interim Deficiency Rept Concerning Radiographic Test Indications on Safety Injection Tanks & Reactor Pump Supports.Util Position Re Resolution of Total Problem Should Be Addressed | |
ML20055A049 | 28 June 1982 | Forwards IE Insp Rept 50-508/82-12 on 820607-11 & Notice of Violation | |
ML20055A076 | 17 June 1982 | Forwards IE Insp Repts 50-508/82-11 & 50-509/82-05 on 820501-31.No Noncompliance Noted | |
ML20055A317 | 30 June 1982 | Responds to to C Kammerer Requesting Comments Re Federal Regulatory & Licensing Problems | Backfit Overexposure |
ML20055A473 | 26 June 1982 | Summarizes 820618 Meeting W/Ebasco & Itt Grinnell in Bethesda,Md Re Itt Grinnel Figure 215 Pipe Clamps Proposed for Use at Facility.List of Concerns Re Design & Testing of Clamps Encl | |
ML20055A489 | 28 June 1982 | Responds to Re Unsafe Conditions Because of Possibility of Earthquakes.Ser Repts Max Acceleration for Plant Design Would Be Caused by Earthquake of 7.5.PSAR,SER (CP State) & FSAR Available in Lpdr | Earthquake |
ML20059M090 | 27 September 1990 | Informs That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days | |
ML20059M092 | 27 September 1990 | Advises That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days | |
ML20062B077 | 22 September 1978 | Forwards Insp Repts 50-508/78-06 & 50-509/78-06 on 780905-08.No Noncompliance Noted | |
ML20062E661 | 27 November 1978 | Summarizes Results of Inspec on 781113-16 to Investigate Falsified Personnel Qual Records & Equip Calibr Irregularities.Confirms That Corrective Actions(Recert of Personnel,Recalibr of Equip,Mgt Actions)Will Be Taken | |
ML20062G211 | 18 December 1978 | Responds to 781207 Request for Missing Page of 750804 ACRS Meeting Re Subj Facil.Forwards Complete Copy.W/O Encl | |
ML20062G331 | 27 November 1978 | Forwards IE Inspec Repts 50-508/78-07 & 50-509/78-07 on 781024-27 During Which No Items of Noncompliance Were Noted | |
ML20062H064 | 9 April 1979 | Forwards PNO 79-67P | |
ML20062H679 | 23 July 1982 | Forwards IE Insp Repts 50-508/82-13 & 50-509/82-06 on 820601-30.No Noncompliance Noted | |
ML20062J083 | 3 August 1982 | Forwards IE Insp Rept 50-508/82-14 on 820712-16.No Noncompliance Noted | |
ML20126F028 | 4 March 1985 | Responds to FOIA Request for Records Re Facility.Ofc of General Counsel in Process of Formalizing Generic Response for Various Related FOIA Requests.Records Already Available in PDR for Insp | |
ML20127J313 | 7 June 1985 | Forwards Meeting Repts 50-460/85-01 & 50-508/85-01 Re Proposed Readiness Review Program on 850522 | |
ML20132G795 | 12 July 1985 | Ack Receipt of Re Plans to Conduct Readiness Review Program.Due to Resource Constraints,Unit 3 Will Only Be Reviewed in FY86-87.Unit 1 Review Planned for After FY87. NRC Roles in Program Encl | |
ML20133E045 | 18 September 1985 | Forwards Readiness Review Insp Rept 50-508/85-05 on 850528-0904.No Violation Noted | |
ML20133P110 | 22 July 1985 | Forwards Mgt Meeting Rept 50-508/85-04 on 850702 in Elma,Wa Re Readiness Review Program | |
ML20133Q006 | 25 October 1985 | Forwards List of Activity Codes & Descriptions Under NRR Manpower Reporting Sys.W/O Encl | |
ML20134A993 | 29 July 1985 | Forwards Insp Rept 50-508/85-02 on 850715-19.No Violations Noted | |
ML20134E369 | 31 July 1985 | Forwards Insp Rept 50-508/85-03 on 850708-12.No Violation Noted | |
ML20135H446 | 18 September 1985 | Responds to KT Roney Question Re Recovering Investment in Project.Project in Extended Const Delay.Util Established Preservation & Maint Program & Requested Extension to Const Completion Date from 850101 to 890701 | |
ML20137B550 | 20 November 1985 | Forwards Comments Re 850925 Proposed Const Assurance Program.Response to Comments Requested to Complete Review of Program | |
ML20137C592 | 6 November 1985 | Forwards Meeting Rept 50-508/85-08 on 851029 in Elma,Wa Re Readiness Review Program | |
ML20137D311 | 30 December 1985 | Forwards Meeting Rept 50-508/85-11 on 851218 Re Proposed Const Assurance Program | |
ML20137L151 | 22 January 1986 | Ack Receipt of Remitting Payment of Invoice E0186 for OL Review.W/O Encl | |
ML20137Q187 | 19 November 1985 | Forwards Draft Ser,Reflecting Status of FSAR & Associated Submittals Until Const Delay Announced in 1983.Document Will Provide Benchmark for Commencement of Any Future Licensing Review in Event of Restart of Const | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Grab sample Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Incorporated by reference Tornado Generated Missile Tornado Missile Protection Safeguards Contingency Plan Earthquake Power Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML20138D695 | 19 November 1985 | Corrected Ltr Forwarding Draft SER Reflecting Status of Staff Review of FSAR & Associated Submittals Until Const Delay Announced in 1983.Ltr Reissued to Include Missing Pages | |
ML20138E153 | 6 December 1985 | Forwards Cost Breakdown by Program Ofc for Review of Application for OL from 840624-1222.Adjustment Made to Bill Based on Reexam by NRR | |
ML20138N590 | 5 December 1985 | Forwards Insp Rept 50-508/85-10 on 851118-21.No Violations Noted | |
ML20138R631 | 2 December 1985 | Forwards Insp Rept 50-508/85-09 on 851101-03.No Violation Noted | |
ML20140E730 | 3 May 1985 | Comments on Future Licensability of Plants,Per .If Util Maintains Equipment & Structures Per QA Program, Delay Will Not Adversely Effect Plant Licensability.Nrc Will Continue to Conduct Periodic Audits of QA Programs | Backfit |