Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-84-603, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)10 April 1987Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)
IA-84-617, Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)10 April 1987Final Response to FOIA Request for Documents Re Securities Litigation of Wppss Facilities.Search Discovered Over 500,000 Documents Available in Pdr.Some Documents Withheld (Ref FOIA Exemptions 3,4,5 & 7)
IA-84-643, Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)10 April 1987Final Response to FOIA Request for Documents Re Wppss Nuclear Projects 1-5.Documents Available in PDR Except Those Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)
IA-84-645, Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)10 April 1987Final Response to FOIA Request for Records Re Various Aspects of Plants.All Agency Records Available in PDR W/ Exception of Documents Subj to Withholding (Ref FOIA Exemptions 3,4,5 & 7)
IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR27 June 1986Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDRNondestructive Examination
IR 05000508/197901030 March 1981Ack Receipt of Informing NRC of Steps Taken to Correct Item C in Notice of Violation from IE Insp Repts 50-508/79-10 & 50-509/79-08
IR 05000508/19810088 July 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-508/81-08 & 50-509/81-08
IR 05000508/19810148 July 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-508/81-14 & 50-509/81-14
IR 05000508/19820048 July 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-508/82-04
IR 05000508/198500625 October 1985Forwards Evaluation Rept 50-508/85-06 on 850801-0913. Engineering Assurance Program Plan Provides Satisfactory Assessment of Design & Design Process & Acceptable
IR 05000508/198600715 July 1986Forwards Insp Rept 50-508/86-07 on 851009 & 0324-27.No Violations Noted.Acceptability of Design Insp Plan Re Engineering Assurance Program Module 1 (Piping/Pipe Supports) Reviewed
IR 05000508/198700224 February 1987Forwards Insp Rept 50-508/87-02 on 870202-05.No Violations Identified
ML20054G8417 June 1982Forwards IE Insp Rept 50-508/82-10 on 820503-07 & 17-21.No Noncompliance Noted
ML20054H34615 June 1982Ack Receipt of Documents Re OL Application,Including General & Financial Info,Fsar,Environ Rept,Antitrust Info & Physical Security & Safeguards Contingency Plans.Acceptance Review Process InitiatedSafeguards Contingency Plan
ML20054H87016 June 1982Responds to 811130 & 820316 Petitions on Behalf of Coalition for Safe Power.Petitions Denied Based on Encl Director'S Decision
ML20054J34722 June 1982Requests Addl Info Re 820604 Interim Deficiency Rept Concerning Radiographic Test Indications on Safety Injection Tanks & Reactor Pump Supports.Util Position Re Resolution of Total Problem Should Be Addressed
ML20055A04928 June 1982Forwards IE Insp Rept 50-508/82-12 on 820607-11 & Notice of Violation
ML20055A07617 June 1982Forwards IE Insp Repts 50-508/82-11 & 50-509/82-05 on 820501-31.No Noncompliance Noted
ML20055A31730 June 1982Responds to to C Kammerer Requesting Comments Re Federal Regulatory & Licensing ProblemsBackfit
Overexposure
ML20055A47326 June 1982Summarizes 820618 Meeting W/Ebasco & Itt Grinnell in Bethesda,Md Re Itt Grinnel Figure 215 Pipe Clamps Proposed for Use at Facility.List of Concerns Re Design & Testing of Clamps Encl
ML20055A48928 June 1982Responds to Re Unsafe Conditions Because of Possibility of Earthquakes.Ser Repts Max Acceleration for Plant Design Would Be Caused by Earthquake of 7.5.PSAR,SER (CP State) & FSAR Available in LpdrEarthquake
ML20059M09027 September 1990Informs That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days
ML20059M09227 September 1990Advises That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days
ML20062B07722 September 1978Forwards Insp Repts 50-508/78-06 & 50-509/78-06 on 780905-08.No Noncompliance Noted
ML20062E66127 November 1978Summarizes Results of Inspec on 781113-16 to Investigate Falsified Personnel Qual Records & Equip Calibr Irregularities.Confirms That Corrective Actions(Recert of Personnel,Recalibr of Equip,Mgt Actions)Will Be Taken
ML20062G21118 December 1978Responds to 781207 Request for Missing Page of 750804 ACRS Meeting Re Subj Facil.Forwards Complete Copy.W/O Encl
ML20062G33127 November 1978Forwards IE Inspec Repts 50-508/78-07 & 50-509/78-07 on 781024-27 During Which No Items of Noncompliance Were Noted
ML20062H0649 April 1979Forwards PNO 79-67P
ML20062H67923 July 1982Forwards IE Insp Repts 50-508/82-13 & 50-509/82-06 on 820601-30.No Noncompliance Noted
ML20062J0833 August 1982Forwards IE Insp Rept 50-508/82-14 on 820712-16.No Noncompliance Noted
ML20126F0284 March 1985Responds to FOIA Request for Records Re Facility.Ofc of General Counsel in Process of Formalizing Generic Response for Various Related FOIA Requests.Records Already Available in PDR for Insp
ML20127J3137 June 1985Forwards Meeting Repts 50-460/85-01 & 50-508/85-01 Re Proposed Readiness Review Program on 850522
ML20132G79512 July 1985Ack Receipt of Re Plans to Conduct Readiness Review Program.Due to Resource Constraints,Unit 3 Will Only Be Reviewed in FY86-87.Unit 1 Review Planned for After FY87. NRC Roles in Program Encl
ML20133E04518 September 1985Forwards Readiness Review Insp Rept 50-508/85-05 on 850528-0904.No Violation Noted
ML20133P11022 July 1985Forwards Mgt Meeting Rept 50-508/85-04 on 850702 in Elma,Wa Re Readiness Review Program
ML20133Q00625 October 1985Forwards List of Activity Codes & Descriptions Under NRR Manpower Reporting Sys.W/O Encl
ML20134A99329 July 1985Forwards Insp Rept 50-508/85-02 on 850715-19.No Violations Noted
ML20134E36931 July 1985Forwards Insp Rept 50-508/85-03 on 850708-12.No Violation Noted
ML20135H44618 September 1985Responds to KT Roney Question Re Recovering Investment in Project.Project in Extended Const Delay.Util Established Preservation & Maint Program & Requested Extension to Const Completion Date from 850101 to 890701
ML20137B55020 November 1985Forwards Comments Re 850925 Proposed Const Assurance Program.Response to Comments Requested to Complete Review of Program
ML20137C5926 November 1985Forwards Meeting Rept 50-508/85-08 on 851029 in Elma,Wa Re Readiness Review Program
ML20137D31130 December 1985Forwards Meeting Rept 50-508/85-11 on 851218 Re Proposed Const Assurance Program
ML20137L15122 January 1986Ack Receipt of Remitting Payment of Invoice E0186 for OL Review.W/O Encl
ML20137Q18719 November 1985Forwards Draft Ser,Reflecting Status of FSAR & Associated Submittals Until Const Delay Announced in 1983.Document Will Provide Benchmark for Commencement of Any Future Licensing Review in Event of Restart of ConstSafe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Grab sample
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
Tornado Generated Missile
Tornado Missile Protection
Safeguards Contingency Plan
Earthquake
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Unidentified leakage
ML20138D69519 November 1985Corrected Ltr Forwarding Draft SER Reflecting Status of Staff Review of FSAR & Associated Submittals Until Const Delay Announced in 1983.Ltr Reissued to Include Missing Pages
ML20138E1536 December 1985Forwards Cost Breakdown by Program Ofc for Review of Application for OL from 840624-1222.Adjustment Made to Bill Based on Reexam by NRR
ML20138N5905 December 1985Forwards Insp Rept 50-508/85-10 on 851118-21.No Violations Noted
ML20138R6312 December 1985Forwards Insp Rept 50-508/85-09 on 851101-03.No Violation Noted
ML20140E7303 May 1985Comments on Future Licensability of Plants,Per .If Util Maintains Equipment & Structures Per QA Program, Delay Will Not Adversely Effect Plant Licensability.Nrc Will Continue to Conduct Periodic Audits of QA ProgramsBackfit