ML20062G331
| ML20062G331 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 11/27/1978 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20062G334 | List: |
| References | |
| NUDOCS 7812270387 | |
| Download: ML20062G331 (2) | |
See also: IR 05000508/1978007
Text
'
a
p er
/
, ,J
W
UNITED STATCS
g
[ ,.
".
NUCLEAR REGULATORY cOMMisslON
y
REGION V
S '*ek
SUITE 202, W ALNUT CREEK PLAZA
- ,.
,tf
8990 N, C ALIFORNI A BOULEVARO
,
- e,e*
W ALN UT C RE CK. C ALIFOR NI A 94596
f ' 8'[ [
h)
i
p {J 7/7f
Docket Nos. 50-508
50-509
Washington Public Power Supply System
P. O. Box 468
Richland, Washington 99352
Attention: Mr. N. O. Strand
'
Managing Director
Gentlemen:
Subject: fiRC Inspection at WMP-3 and WNP-5
This refers to the inspection conducted by Messrs. J. H. Eckhardt.
T. W. Hutson and G. Hernandez of this office on October 24-27, 1978,
of activities authorized by NRC Construction Permit Nos. CPPR-154 and
155, and to the discussion of our findings held by Mr. Eckhardt with
,
Mr. W. J. Talbott and other members of your staff at the conclusion
I
of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter-
Hws with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
'
to be proprietary, it is necessary that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure. The applica-
tion must include a full statement of the reasons why it is claimed that
-1sR uo3s'7
h'
.__ - _ _ _
'
, i
-
-
Washington Public Power Supply System
-2-
.# '
' )
the information is proprietary. The application sho. 'd be prepared so
that any proprietary information identified is contained in an enclosure
to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
vta u-
,
G. S. Sp'encer, Chief
,
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report
Nos. 50-508/78-07
.
50-509/78-07
cc w/o enclosure:
M. E. Witherspoon, Division Manager
Quality Assurance, WPPSS
G. K. Dyekman, Project Manager, WPPSS
9
9