ML20138R631

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-508/85-09 on 851101-03.No Violation Noted
ML20138R631
Person / Time
Site: Satsop
Issue date: 12/02/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20138R633 List:
References
NUDOCS 8512310407
Download: ML20138R631 (1)


See also: IR 05000508/1985009

Text

-

DEC 0 21985

Docket No. 50-508

Washington Public Power Supply System

P. O. Box 1223

Elma, Washington 98541

Attention: Mr. D. W. Mazur

Managing Director

Gentlemen:

Subject: NRC Inspection - WNP-3

This refers to the routine inspection conducted by Mr. W. G. Albert of this

office on November 1-3, 1985, of activities authorized by NRC Construction

Permit No. CPPR-154, and to the discussion of our findings held by Mr. Albert

with Mr. D. R. Coody at the conclusion of the inspection.

The area examined during this inspection was the containment structural

integrity test. Within this area, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No violations of NRC requirements were identified within the' scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of thi~s letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,/s

D. F. Kirsch, cting Director

Division of Reactor Srfety and Projects

Enclosure:

Inspection Report No. 50-508/85-09 ,

cc w/ enclosure:

A. D. Kohler, WPPSS

R. B. Glasscock, WPPSS

L. J. Garvin, WPPSS

J. D. Martin, WPPSS

State of WA

bec: RSB/ Document Control Desk (RIDS)

Mr. J. Mar in; Mr. Faulkenberry; G. Cook; Resident Inspector

f, h f g, JKfQ ggg g*

'

RV

WAlbert: RD s TYou g R ate DKir ch

11////85 11/fy/85 11/ /85 11/n/85 11/2L/85

8512310407 851202

PDR ADOCK 05000508

o PDR

Y .J