DEC 051985
/
Docket No. 50-508
Washington Public Power Supply System
P. O. Box 1223
Elma, Washington 98541
Attention:
Mr. D. W. Mazur
Managing Director
Gentlemen:
,
Subject: NRC Inspection - WNP-3
This refers to the routine inspection conducted by Mr. W. P. Ang of this
office on November 18-21, of activities authorized by NRC Construction Permit
No. CPPR-154, and to the discussion of our findings held by Mr. Ang with
Mr. C. E. Love and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
No violations of NRC requirements were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
Original signed b'y
D. F. Kirsch
D. F. Kirsch, Deputy Director
Division of Reactor Safety and Projects
Enclosure:
Inspection Report No. 50-508/85-10
cc w/ enclosure:
A. D. Kohler, WPPSS
R. B. Glasscock, WPPSS
,
L. J. Garvin, WPPSS
J. D. Martin, WPPSS
State of WA
bec: RSB/ Document Control Desk (RIDS)
'
l
Mr. J. Martin;
Mr. B. Faulkenberry;
G. Cook; Resident Inspector
l
RV
yp.
g&*.-
Wang:dh
dds
AChaffee
DKirs
12/5/85
12/f/85
12/ y/85
12/ /85
8512240079 851205
[
ADOCK 05000508
I
I
O