ML20137C592
| ML20137C592 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 11/06/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Kohler A WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20137C594 | List: |
| References | |
| NUDOCS 8511260542 | |
| Download: ML20137C592 (1) | |
See also: IR 05000508/1985008
Text
-
- (
NOV 061985
$/
Docket No. 50-508
. Washington Public Power Supply System
P. 0. Box 968
3000 George Washington Way
.Richland, Washington 99352
Attention:
Mr. A. D.-Kohler
Director of Projects
This refers to your meeting with representatives of the Nuclear Regulatory
., Commission, Region V,-~and the Office of Inspection and Enforcement in Elma,
Washington on October 29, 1985, regarding your Readiness Review program for
Supply System Nuclear Project No. 3 as described in the attached report.
In accordance with 10 CFR 2.790(a),-a copy of this letter and the enclosure
will.be placed in the NRC Public Document Room.
-Should you have any questions concerning this meeting report, we will be glad
~to discuss them with you.
Sincerely,
OrigInct signed b'y
D. F. Kirsch
D. F. Kirsch, Deputy Director
Division Reactor Safety and Projects
'
Enclosures:
As Stated
cc w/ enclosures:
R. B. Glasscock, WPPSS
R. W.' Root, WPPSS
>
L.'J. Garvin, WPPSS
G. T. Ankrum,-IE:HQ
"
R. F. Heishman, IE:HQ
-
.
,W.
Brach, DEDROGR
F. J. Miraglia, NRR
B. K. Singh, NRR
-
J. D. Martin, WPPSS
'
State of~WA
bec:
-RSB/ Document Control Desk (RIDS)
Mr. J. Martin
Mr. B. Faulkenberry
>
G. Cook
, Resident Inspector
et. A. Ck.Mce
M
RDo@dtls
RV p
Wang:dh
AChaffee
DKir ch
11/I'/85
11/f/85
11//,/85
11/g/85
..
.
8511260542 851106
ADOCK 05000508
G
,