IR 05000508/1981008
| ML20054N044 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 07/08/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Leddicks R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20054N045 | List: |
| References | |
| NUDOCS 8207150298 | |
| Download: ML20054N044 (1) | |
Text
i m3
,w;
.
e
,
%
'
o
,4 ~
4,
,y
y.,
p,
,
'JUL8 E82 Docket Nos. 50-508 50-509 Washington Public Power Supply System Box 1223 Elma, Washington 98541 Attention:
R.
S. Leddick, 761 Program Director, WNP-3 Gentlemen:
Thank you for your letter dated May 5, 1982, informing us of the steps you have taken to correct items which we brought to your attention in our letter dated October 30, 1981.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, T.
W.
Bishop, Chief Reactor Construction Projects Branch bec: Document Control Desk (RIDS)
Distributed by RV w/cy ltr dtd 5/5/82:
State of WA (Lewis), Resident Inspector (Albert)
8207150298 820708 PDR ADOCK 05000508
\\EO(
a
"o"
,
,g,
.RV,,
,
,
,
,,,,,
,,
,
,,,,
,,,
" ' " >.RV RV
,,
$""**"'>. Ha,i.n t/5;b.
,pacida.
..E.ishop..
.
.
.
..
- * " > ?!.7.le 2.,
,72,p,gs 2
.7/f.g82
,
,,
,,,
,
,
,
.
,
,,,,,,,
,,,
e uwo weo_au ea
. nac rcmu a[a no 80 nucu e2"
_
OFFICIAL RECORD C OPY.
_