ML20055A076

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/82-11 & 50-509/82-05 on 820501-31.No Noncompliance Noted
ML20055A076
Person / Time
Site: Satsop
Issue date: 06/17/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20055A077 List:
References
NUDOCS 8207150454
Download: ML20055A076 (2)


See also: IR 05000508/1982011

Text

. ,. - .,

- p /

&s.- ~ ,

.

Jim li ISB4

Docket lio. 50-508, 50-509

Washington Public Power Supply System

P. O. box 1223

Lima, Washington 98541

Attention: Mr. R. S. Leddick

Program l>irector, WNP-3/5

Gentlemen:

Subject: ULC Inspection at Washington Nuclear Projects Nos. 3 and 5

(WUP-3/5)

This refers to the inspection conducted by Mr. W. G. Albert of this

office on llay 1-31, 1962, of activities authorized by NRC Construction

Permit hos. GPPR-154 and CPPR-155, and to the discussion of our find-

ings with 0. E. Trapp and other members of the Supply System staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

'

interviews with personnel, and observations by the inspector.

l

ho items of noncompliance with UkC requirements were identified

{ within the scope of this inspection.

!

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless

! you notify this office, by telephone, within ten days of the date

j of this letter and submit written application to withhold information

contained therein within thirty days of the date of this letter.

j Such application must be consistent with the requirements of

2. 790 (b) (1) .

/

Dohk*offy [g

'

PDR

"'c'> . R :.c q q . . . ... ..

.h .

!""~'"'> W.,... J b k t., R,,, ,9d d,s , , , , ,T ,,. .M,Kwp, . , . .

. . .. .. . ..

, ........

. ....

,. . .

. .. .

.

.

.

.. ...

. . .

..

.. .. .....

. .. .

.

' " > 6/5b.f.82. .

61. l.hl.82. . . . . .51.0.l.8.2......

.. .. ...... ....... ..... .... ... .... . . . . . . . . . . ..... .. .

' " ' * 32"

NRC FORM 3tU dtO 80l NRCM O240 OFFICIAL RECORD COPY

. __ _ _. _ _. _ __. . - _ .

_ , _ . . _ . .-_ __ _

,

i

-

., . ' Washington Public Power Supply System -2-

l JU.'l l'i 1932

i

Should you have any questions concerning this inspection, ue will

be glad to discuss them with you.

Sincerely,

'

T. W. Bishop, Chief

Reactor Construction Projects Branch

Lnclosure:

14RC Inspection Ecport

ho. 50-508/82-11 and 50-509/f,2-05

cc v/o enclosure:

R. 11 . Glasscock, Quality Assurance Director, WPPSS

Dale Dobson, Project Manager

-

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

Resident Inspector

Project Inspector

RHE (w/o enc)

,

9

4

i

..- _.- .- . .-- -_-.. _.,_ . . - - . _ _ . . . - - . , . _ . - _ , . _ . . _ . -

-..