ML20133P110

From kanterella
Jump to navigation Jump to search
Forwards Mgt Meeting Rept 50-508/85-04 on 850702 in Elma,Wa Re Readiness Review Program
ML20133P110
Person / Time
Site: Satsop
Issue date: 07/22/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20133P113 List:
References
NUDOCS 8508140156
Download: ML20133P110 (2)


See also: IR 05000508/1985004

Text

___ .

JU!. 2 21985

pocket No. 50-508

hshington Public Power Supply System

P. O. Box 968

3000 George Washington Way

Richland, Washington 99352

Attention:

Mr. D. W. Mazur

Managing Director

This refers to your meeting with representatives of Region V, Nuclear Reactor

Regulation, and Inspection and Enforcement in Elma, Washington on July 2,

1985, regarding your Readiness Review program for Supply System Nuclear

Project No. 3 as described in the attached report and handout.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this meeting report, we will be glad

to discuss them with you.

Sincerely,

O,icin g 3;y,,cd b'y

D r v ,3 g,

D. F. Kirsch, Acting Director

Division Reactor Safety and

Projects

Enclosures:

As stated

cc w/ enclosures:

R. B. Glasscock, kTPSS

A. D. Kohler, kTPSS

R. W. Root, WPPSS

L. J. Garvin, bTPSS

G. T. Ankrum, IE

F. J. Miraglia , NPJ1

B. K. Singh, NRR

J. D. Martin, bTPSS

State of WA

bec: RSB/ Document Control Desk (RIDS)

Mr. J. Martin

Resident Inspector

RV /q

g

RDodds:dh

DKirsth

7/2/2185

7/ 4t/85

8508140156 950722

PDR

ADOCK 05000508

G

PDR

q

{

,

__ _

.-

,

.

DETAILS

1.

Personnel Attending Meeting

'

RV-NRC,

'

.

J. B. Martin, Regional Administrator

R. T. Dodds, Chief, Reactor Projects Section 1

G. N. Cook, Public Information Officer

IE-NRC

W. M. Hill, Senior Engineer, Quality Assurance Branch

J. L. Milhoan, Chief, Licensing Section, Quality Assurance Branch

NRR-NRC

T. M. Novack, Assistant Director for Licensing

T. S. Michaels, Project Manager

WPPSS

D. W. Mazur, Managing Director

A. D. Kohler, Director of Projects

R. B. Glasscock, Director of Licensing and Assurance

L. J. Garvin, Manager, Readiness Review Program

J. P. Burn, Director of Engineering

G. C. Sorensen, Manager, Regulatory Programs

G. A. Block, Engineering Assurance Manager

V. Harris, Maintenance Manager, WNP-3

Staff

,

EBASCO

R. Marshall, Vice President

J. Crnich, Project General Manager

Staff

EFSEC

W. Fitch, Executive Secretary

M. Mills, Staff

F. Hahn, Member

Miscellaneous Attendees

D. Smithpeter, BPA

l

J. King, NWPPC

G.' Kirkpatrick, GHPUD

E. Rhoads, GHPUD

J. Adams, Investor Owned Utility Representative

K. Jones, Chronicle

W. Downes, USDI-BIA Olympic Peninsula Agency

J. Dodge, The Olympian

R. Wodnik, Daily World

1

, _,

,

.

-

-

-

-

-

--"