ML20133P110
| ML20133P110 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 07/22/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20133P113 | List: |
| References | |
| NUDOCS 8508140156 | |
| Download: ML20133P110 (2) | |
See also: IR 05000508/1985004
Text
___ .
JU!. 2 21985
pocket No. 50-508
hshington Public Power Supply System
P. O. Box 968
3000 George Washington Way
Richland, Washington 99352
Attention:
Mr. D. W. Mazur
Managing Director
This refers to your meeting with representatives of Region V, Nuclear Reactor
Regulation, and Inspection and Enforcement in Elma, Washington on July 2,
1985, regarding your Readiness Review program for Supply System Nuclear
Project No. 3 as described in the attached report and handout.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this meeting report, we will be glad
to discuss them with you.
Sincerely,
O,icin g 3;y,,cd b'y
D r v ,3 g,
D. F. Kirsch, Acting Director
Division Reactor Safety and
Projects
Enclosures:
As stated
cc w/ enclosures:
R. B. Glasscock, kTPSS
A. D. Kohler, kTPSS
R. W. Root, WPPSS
L. J. Garvin, bTPSS
G. T. Ankrum, IE
F. J. Miraglia , NPJ1
B. K. Singh, NRR
J. D. Martin, bTPSS
State of WA
bec: RSB/ Document Control Desk (RIDS)
Mr. J. Martin
Resident Inspector
RV /q
g
RDodds:dh
DKirsth
7/2/2185
7/ 4t/85
8508140156 950722
ADOCK 05000508
G
q
{
,
__ _
.-
,
.
DETAILS
1.
Personnel Attending Meeting
'
RV-NRC,
'
.
J. B. Martin, Regional Administrator
R. T. Dodds, Chief, Reactor Projects Section 1
G. N. Cook, Public Information Officer
IE-NRC
W. M. Hill, Senior Engineer, Quality Assurance Branch
J. L. Milhoan, Chief, Licensing Section, Quality Assurance Branch
NRR-NRC
T. M. Novack, Assistant Director for Licensing
T. S. Michaels, Project Manager
D. W. Mazur, Managing Director
A. D. Kohler, Director of Projects
R. B. Glasscock, Director of Licensing and Assurance
L. J. Garvin, Manager, Readiness Review Program
J. P. Burn, Director of Engineering
G. C. Sorensen, Manager, Regulatory Programs
G. A. Block, Engineering Assurance Manager
V. Harris, Maintenance Manager, WNP-3
Staff
,
EBASCO
R. Marshall, Vice President
J. Crnich, Project General Manager
Staff
W. Fitch, Executive Secretary
M. Mills, Staff
F. Hahn, Member
Miscellaneous Attendees
D. Smithpeter, BPA
l
J. King, NWPPC
G.' Kirkpatrick, GHPUD
E. Rhoads, GHPUD
J. Adams, Investor Owned Utility Representative
K. Jones, Chronicle
W. Downes, USDI-BIA Olympic Peninsula Agency
J. Dodge, The Olympian
R. Wodnik, Daily World
1