ML20127J313
| ML20127J313 | |
| Person / Time | |
|---|---|
| Site: | Satsop, Washington Public Power Supply System |
| Issue date: | 06/07/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20127J317 | List: |
| References | |
| NUDOCS 8506260549 | |
| Download: ML20127J313 (2) | |
See also: IR 05000460/1985001
Text
_ _ _ _ _ - _ _ _
.__
- _ _ _ _
_
_
. _ _ -
__
. _ _ _ _ _ _ _ _ _ _
[
'
.
.
.
JUfl
7 1985
Docket Nos. 50-460 and 50-508
Washington Public Power Supply System
P. O. Box 968
3000 George Washington Way
Richland, Washingtou 99352
Attention:
D. W. Mazur
Managing Director
This refers to your meeting with representatives of Region V, Nuclear Reactor
Regulation, And Inspection and Enforcement in Walnut Creek on May 22, 1985,
regarding your proposed Readiness Review program for Supply System Nuclear
,
Project Nos. I and 3 as described in the attached report and handout.
In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this meeting report, we will be glad
to discuss them with you.
Sincerely,
'
I
i
D. F. Kirsch, Acting Director
Division Reactor Safety & Projects
Region V
cc:w/ enclosure:
R. B. Glasocock, WPPSS
A. D. Kohler, WPPSS
R. W. P.oot, WPPSS
f, 7, M Garvin, WPPSS
,j G. T. Ankrum, IE
.
r
f)>F.J.Miraglia,NRR
pp/j
B. K. Singh, NRR
c
g
e
bec:
RSB/ Document Control Desk (RIDS)
Mr. Martin
State of WA (Curtis Eschels)
Resident Inspector
(
RV:
z
Do is
Kir ch
6/f785
6/y/85
0506260549 050607
ADOCK 05000460
f
0
pon
.IEat 4
_ - -
_ _ _ _ _
_ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _
.
.
JUN
71985
Docket Nos. 50-460 and 50-508
Washington Public Power Supply System
P. O. Box 968
3000 George. Washington Way
Richland, Washington; 99352 -
Attention:
D. W. Mazur
Managing Director
- This refers to your meeting with representatives of Region V, Nuclear Reactor
Regulation, And Inspection and Enforcement in Walnut Creek on May 22, 1985,
regarding your proposed Readiness Review program for Supply System Nuclear
Project Nos. l'and 3 as' described in the , attached report and handout.
Inaccordan'cewith.1d'CFR2.790(a),acopy[ofthisletterandtheenclosure
will be placed intthe NRC Public Document' Room.
3
'
Should you have any questions concerning this meeting report, we will be glad
.
to discuss them with you.
,
Sincerely,
'
,
,
,
W
>
'
D. F. Kirsch, Acting Director
' Division Reactor Safety & Projects
Region V
cc:w/ enclosure:
,
R. B. Glasscock, WPPSS
A. D. Kohler, WPPSS
R. W. Root, WPPSS
L. J.-Garvin, WPPSS
G. T. Ankrum, IE
F. J. Miraglia, NRR
B. K. Singh, NRR
bec:
RSB/ Document Control Desk (RIDS)
Mr. Martin
.
State of WA (Curtis Eschels)
Resident Inspector
RV: az
Dodds
Kirsch
6/ /85
6/ /85
4 .
.