Ack Receipt of Informing NRC of Steps Taken to Correct Item C in Notice of Violation from IE Insp Repts 50-508/79-10 & 50-509/79-08
ML20126H093
Person / Time
Site: Satsop
Issue date: 03/30/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20126H095 List:
References
NUDOCS 8104030754
Download: ML20126H093 (1)


Text

  • ~

s Q Clay

'

M % UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION

$ E REGION V o #

1990 N. CALIFORNIA BOULEVARD '

o SUITE 202, WALNUT CREEK PLAZA 4,,,5 WALNUT CREEK, CALIFORNIA 94596 March 30,1981 Docket Nos. 50-508 50-509 Washington Public Power Supply _ System P. O. Box 1223 Elma, Washington 98541 Attention: Mr. D. E. Dobson Program Director (Acting)

References: 1). Letter, G. S. Spencer to N. O. Strand, "NRC Inspection WNP-3/5", dated December 14, 197 ,

'

2) Letter, D. L. Renb'erger to G. S. Spencer, No. G03-80-91 dated January 18, 198 ) Letter, G. S. Spencer to N. O. Strand, dated January 31, 1980 4) Letter, G. S. Spencer to R. L. Ferguson, dated September 4, 1980 5) Letter, D. E. Dobson to R. H. Engelken, No. G03-81-272 dated January 30, 1981 Gentlemen:

Thank you for your letter identified above as Reference 5, informing us of the steps you have taken to correct Item C in the Notice of Violation submitted to you in our letter identified as Reference 1 and subsequently discussed in our letter identified as Reference Your corrective action will be verified during a future inspectio Your cooperation with us is appreciate

Sincerely,

%l B. H. aulke4nberry, le Reactor Constructton_

Projects Branch t

8104080 7N 1 Q

- . - . - - ---