Forwards IE Insp Repts 50-508/82-13 & 50-509/82-06 on 820601-30.No Noncompliance Noted
ML20062H679
Person / Time
Site: Satsop
Issue date: 07/23/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20062H681 List:
References
NUDOCS 8208160130
Download: ML20062H679 (2)


See also: IR 05000508/1982013

Text

.

_

-

.

,

  1. .

T

L/

,

.

JUL 2 31982

Docket lio. 50-506, 50-509

bashington Public Power Supply System

P. O. Lox 1223

Lima, Washington 98541

Attention:

lir . R. S. Leddick

Program Director, WNP-3/5

Gentlemen:

Subject:

URC Inspection at Washington Nuclear Projects Gos. 3 and 5

(WuP-3/5)

'lhis refers to the inspection conducted by Mr. W. G. Albert of this

office on June 1-30, 1982, of activitics authorized by NRC Construction

Permit Nos. CPPA-154 and CPPR-155, and to the discussion of our findings

with D. E. Dobson and other members of the Supply System staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

Go items of noncompliance with liRC requirements were identified

within the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of

this letter and submit written application to withhold information

contained herein within thirty days of the date of this letter.

Such

application must be consistent with the requircuents of 2.790(b)(1) .

8208160130 820723

PDR ADOCK 05000

gj

"'c'> RV. c

..

..

...

.

.

.

.

.

.

.

" " > .W. .. Alb er . R ..Dodds..

T...

.

"' I

7./ -2d.82..

.7/23.82. .

7/Ng.2 -

2

-

-

-

. ...

-

-

-

NRC FORM 318 410 00l N RC M O2 4 0

OFFICIAL RECORD COPY

" "- 32"

_ . -

JUL23 175

Whshington Public Power Supply System -2-

.

Should you have any questions concerning this inspection we will be

glad to discuss them with you.

Sincerely,

Original signed by

T. W. Bishop

T. U. Eishop, Chief

Reactor Construction Proj ects Branch

Enclosure:

hRC Inspection Report

1;o . 50-508/82-13 and 50-509/82-06

cc w/o enclosure:

R. L. Glasscock, Quality Assurance Director, WPPSS

Dale Dobson, Project Manager

bcc:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

Engelken (w/o encl)

Project Inspector

Resident Inspector

State of WA (Lewis)