ML20062H679
| ML20062H679 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 07/23/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20062H681 | List: |
| References | |
| NUDOCS 8208160130 | |
| Download: ML20062H679 (2) | |
See also: IR 05000508/1982013
Text
.
_
-
.
,
- .
T
L/
,
.
JUL 2 31982
Docket lio. 50-506, 50-509
bashington Public Power Supply System
P. O. Lox 1223
Lima, Washington 98541
Attention:
lir . R. S. Leddick
Program Director, WNP-3/5
Gentlemen:
Subject:
URC Inspection at Washington Nuclear Projects Gos. 3 and 5
(WuP-3/5)
'lhis refers to the inspection conducted by Mr. W. G. Albert of this
office on June 1-30, 1982, of activitics authorized by NRC Construction
Permit Nos. CPPA-154 and CPPR-155, and to the discussion of our findings
with D. E. Dobson and other members of the Supply System staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
Go items of noncompliance with liRC requirements were identified
within the scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of
this letter and submit written application to withhold information
contained herein within thirty days of the date of this letter.
Such
application must be consistent with the requircuents of 2.790(b)(1) .
8208160130 820723
PDR ADOCK 05000
gj
"'c'> RV. c
..
..
...
.
.
.
.
.
.
.
" " > .W. .. Alb er . R ..Dodds..
T...
.
"' I
7./ -2d.82..
.7/23.82. .
7/Ng.2 -
2
-
-
-
. ...
-
-
-
NRC FORM 318 410 00l N RC M O2 4 0
OFFICIAL RECORD COPY
" "- 32"
_ . -
JUL23 175
Whshington Public Power Supply System -2-
.
Should you have any questions concerning this inspection we will be
glad to discuss them with you.
Sincerely,
Original signed by
T. W. Bishop
T. U. Eishop, Chief
Reactor Construction Proj ects Branch
Enclosure:
hRC Inspection Report
1;o . 50-508/82-13 and 50-509/82-06
cc w/o enclosure:
R. L. Glasscock, Quality Assurance Director, WPPSS
Dale Dobson, Project Manager
bcc:
DMB/ Document Control Desk (RIDS)
Distributed by RV:
Engelken (w/o encl)
Project Inspector
Resident Inspector
State of WA (Lewis)