DISTRIBUTION:
x/
'PDR LPDR LFMS Actual Manpower File RMDiggs CJHolloway
- Reg Docket' File s,
DWeiss v
~
LFMS Reactor File OEC 6 1985 LSolander, PRAB MKal tman, PRAB Docket Ho. 50-508 JLee, NRR VNerses, NRR Washington Public Power Supply System ATTH: Hr. D. W. Hazur Managing Diredtor P.O. Box 968 3000 George Washington Way Richland, Washington 99352 Gentlemen:
As you are aware,10 CFR 170 of the Commission's regulations for license and inspectior. fees was revised effective June 20, 1984. Section170.12(b) of the revised rule provides that for applications for permits, licenses, facility reference design approvals, and special projects whi A have been on file with the Commission for review for six months or longer, billings would be made at six-month intervals or when the review is completed, whichever is earlier.
Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analysis for the WNP-3 OL application review for the period June 24, 1984 through December 22, 1984. The cost through that period is $71,589. The enclosure is a breakdown of the review costs by program office. Based on a reexamination of the costs by the Office of Nuclear Reactor Regulation for the previous billing period, an adjustment of $800 has been made to the bill leaving a balance due of $70,789. The Office of Resource Management has been notified to bill your company for this amount. When making payment, please make reference to the bill number.
Sincerely,
[sbed c. Jacs acumy, Jr{
'N William 0. Miller, Director License Fee Management Staff Office of Administration
Enclosure:
Cost Breakdown By Program Office 8512130353 851206 PDR ADOCK 05000508 A
PDR LFMS:ADM !
LFMS:, if l l
l o ca
-~~~ CJs ay;3p fri l.
"1 6/85l 186 / Sl
'I l.
l o.
Onu;;i - -
6mciAC seE6#5 6SC
-~
m..--._
m.;.
~
~
Washington Public. Power Supply System Operating License Review Costs From 6/24/84 Through 12/22/84 FACILITY: WNP-3 DOCKET NO.: 50-508 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour
_ Expended Costs Costs Costs 1.
$62 1,022.5
$63,395
$3,832
$67,227 2.
IE-HQ 53 1.0 53 53 3.
REGIONS 53 81.3 4,309 4,309 4.
ACRS 62 5.
NMSS 58 Total Cost:
$71,589 NRR Cost Adjustment From Previous Period
-800
$70,789 l