Forwards IE Insp Rept 50-508/82-10 on 820503-07 & 17-21.No Noncompliance Noted
ML20054G841
Person / Time
Site: Satsop
Issue date: 06/07/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20054G842 List:
References
NUDOCS 8206220345
Download: ML20054G841 (2)


See also: IR 05000508/1982010

Text

. v,o

'

, .

y  ;

y

.

p q  :,, , y y .

JUN 7 1982

Docket No. 50-508

Washington Public Power Supply System

P. O. Box 1223

Elma, Washington 98541

Attention: Mr. R. S. Leddick

Program Director, WNP-3/5

Gentlemen:

Subject: NRC Inspection

This refers to the routine inspections conducted by Mr. D. P. Haist of

this office on May 3-7 and 17-21, 1982 of activities authorized by NRC

Construction Permit Ib. CPPR-154, and to the discussion of our findings

held by Mr. Haist with you and other members of your staff at the conclusion

of the inspections.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

8206220345 820607

DR ADOCK 05000 -

^

'""">

RV/doti '1

.... ..... . . . . . . .U .

DO DS BISH0P

"""' 4 . h....qAIST

.

........ .. ,

o.u p 6/d /d2 6/g7/82 6/1/82

l . l. .

wc.ewu moo - cue"o OFFICIAL RECORD COPY ""-3"

l. ,

,

'4 .A

.- .

,

Washington Public Power Supply System -2- g 7 4gg

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

.

3

T. W. Bishop ~, Chief ,

Reactor Construction Projects Branch

Enclosure:

IE Inspection Report

tb. 50-508/82-10

cc w/o enclosure:

R. B. Glasscock, WPPSS

D. E. Dobson, WPPSS

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

RHE

Resident Inspector

Project Inspector

_ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ l