ML20062B077

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-508/78-06 & 50-509/78-06 on 780905-08.No Noncompliance Noted
ML20062B077
Person / Time
Site: Satsop
Issue date: 09/22/1978
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20062B081 List:
References
NUDOCS 7810230091
Download: ML20062B077 (2)


See also: IR 05000508/1978006

Text

_.

-

.

(

o

,e

,

% ,, .

0

t

UNITED STATES

4

[w

OL

NUCLEAR' REGULATORY COMMisslON

j

REGION V

.

2..

0, Y *

$USTE 202. W ALNUT CREE A PLA*A

,o

1990 N. C ALIFORNI A SOULEV ARD

,

    • go*

WALNUT CREEK. CALIFORNIA 94$96

y

2

SEP 2 21978

(

N

Docket ilos'. 50-508 \\

5050f

Washington Public Power Supply System

,

P. 0. Box 468

Richland, Washington 99352

P

Atten' tion: Mr. N. O. Strand

Managing Director

'

- -

Gentlemen:

Subject: NRC Inspection of WNP-3 and 5 (Satsop)

This refers to the inspection conducted by Messrs. D. F. Kirsch and

'

J. H. Eckhardt of this office on September 5-8, 1978 of activities

t

authorized by NRC Construction Permit Nos. CPPR-154 and 155, and to the

discussion of our findings held by Mr. Kirsch with Mr. Talbott and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Nblic

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such infor :ation be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons why it is claimed that

';

the information is proprietary.

The application should be prepared so

that any proprietary information identifiec is contained in an enclosure

7P/013co4/

Q

.

1

-

SEP 22 578

Washington Public Power Supply System

-2-

to the application, since the application without the enclosure will

.'

also be placed in the Public Document Room.

If we do not hear from you

-

in this regard within the specified period, the report will be placed in

'

-

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss then with you.

Sincerely,

,e

- 0

nT'

G. 5. Sp cer,

Reactor Construction nd

.

Engineering Suppor Branch

Enclosure:

IE Inspection Report

Nos. 50-508/78-06

50-509/78-06

cc w/o enclosure:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

G. K. Dyebnan, Project Manager, WPPSS

.