| Site: | Satsop |
| Issue date: | 06/28/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20055A050 | List: |
| References | |
| NUDOCS 8207150428 | |
| Download: ML20055A049 (2) | |
See also: IR 05000508/1982012
Text
- _ _ _ _ _ _ _ -
4
h
-e-
5
g
g,
e
i
-
,
<
g 2 81982.
%
Docket No. 50-508
Washington Public Power Supply System
P. O. Box 1223
Elma, Washington 93541
Attention: Mr. R. S. Leddick
Program Director, UNP-3/5
,
Gentlemen:
Subject: NRC Inspection at Washington fluclear Project No. 3 (UNP-3)
This refers to the routine inspection conducted by Mr. D. P. liaist of
this office on June 7-11, 1982 of activities authorized by NRC Construction
Permit flo. CPPR-154, and to the discussion of our findings held by Mr. Haist
with you and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with flRC requirenents,
as set forth in the flotice of Violation, enclosed herewith as Appendix A.
Your response to this notice is to be subnitted in accordance with the
provisions of 10 CFR 2.201 as stated in Aopendix A. Notice of Violation.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosures will be placed in the NRC Public Docurent Roon unless you notify
this office, by telephone, within ten days of the date of this letter and
submit written application to withhold information contained therein within
thirty days of the date of this letter.
Such application must be consistent
with the requirenents of 2.790(b)(1).
$
/Fc j
$$$300
0
o
omer y
RV * y
@
suaa.ur) HAIST ' k
D0DD V
BIS P
,,y p 57tp82"
WJf/82"
"672J782"
.
.
. ..
nac ronu aia no.aoi ucu e2a
OFFICIAL RECORD COPY
" m e-3 m 2.
_
)
.
.
3312,B E
5
Washihgton Public Power Supply Systen
-2-
Should you have any questions concerning this inspection, we will be glad
to discuss then with you.
The responses directed by this letter and the acconpanying flotice (Order)
are not subject to the clearance procedures of the Office of tianagement
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
Sincerely,
0 % N L sis:Ma fa
t. 7. D00DS
T. W. Bishop, Chief
Reactor Construction Projects Branch
Enclosures:
A.
flotice of Violation
B.
IE Insoection Report
tio 50-508/82-12
cc w/o enclosure B:
R. B. Glasscock, Quality Assurance Director, WPPSS
Dale Dobson, Project fianager, UPPSS
bcc: Ot!B/ Document Cottrol Desk (RDDS)