Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000280/200500219 April 2005IR 05000280-05-002, 05000281-05-002, and 07200002-05-001, on 01/01/2005 - 03/31/2005, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Event Followup, Routine Integrated Report, and Annual Assessment MeetingHigh winds
Temporary Modification
Significance Determination Process
Job Performance Measure
Earthquake
Maintenance Rule Program
Fire Protection Program
Power change
IR 05000335/201000717 November 2010Summary of Public Regulatory Performance Meeting with Florida Power and Light Company to Discuss Corrective Actions Associated with the Yellow Finding That Was Documented in the NRC Inspection Report IR 05000335-10-007Significance Determination Process
Operability Determination
IR 05000369/20070084 October 2007Notice of Regulatory Conference with Duke Energy Corporation to Discuss the Risk Significance of the Inspection Finding Documented in Inspection Report 05000369, 370/2007008
L-04-004, 11/24/2008 - Summary of Meeting to Discuss 11/21/2008 and 11/18/2008 Requests for Additional Information GL 2004-04, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors3 December 200811/24/2008 - Summary of Meeting to Discuss 11/21/2008 and 11/18/2008 Requests for Additional Information GL 2004-04, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML00371822525 May 2000Summary of May 10, 2000, Phone Call Between the U.S. NRC Staff, Contractor and NEI Representatives to Discuss Industry Comments Submitted by NEI on April 24, 2000, on the Draft Generic Aging Lessond Learned (GALL) Report - Electrical EquipmAging Management
ML00371864324 May 2000Summary of Meeting with the Nuclear Energy Instiute (NEI) to Discuss the Relationship Between the Generic Aging Lessons Learned (GALL) Report and the Standard Review Plan for License Renewal (SRP-LR)
ML0037294533 July 2000Summary of Meeting with the Nuclear Energy Institute (NEI) to Discuss Industry Comments on the Draft Generic Aging Lessons Learned (GALL) Report - Mechanical Systems Chapter IV, Sections A1, B1, and C1Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Aging Management
Dissimilar Metal Weld
ML00374067811 August 2000Summary of Meeting with the Nuclear Energy Institute on Industry'S Comments on Chapter 2, Structures and Components Subject to Aging Management Review of the Draft Standard Review Plan for the Review of License Renewal Applications for NuclAging Management
ML01019004716 January 200111/29/00 Summary of License Renewal Meeting Between the NRC and the NEI License Renewal Working Group; ANO-1 SNC for Hatch Nuclear Plant, Units 1 and 2 and for FPL for Turkey Point Units 3 and 4
ML0124900175 September 2001Summary of 07/25/2001 Meeting with the Nuclear Energy Institute (NEI) License Renewal Task Force on Demonstration Project Using Improved Renewal Guidance Documents
ML0136004589 January 2002Summary - Meeting with Duke Energy on December 11, 2001, Spent Fuel Pool Boraflex Update, MB3570 and MB3571
ML02025034017 January 2002Meeting Summary of January 15, 2002 Re Spent Fuel Storage
ML02043040428 February 2002,Meeting with Duke Energy Corp on Spent Fuel Pool Boraflex Update Held, (Tac Nos. MB3570 and MB3571)
ML02051055914 February 200202/08/02 Meeting Summary Regarding Control Element Drive Mechanism Cracking IssuesWeld Overlay
ML02081075619 March 2002Operator Licensing Workshop Meeting SummaryProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
ML0208407241 April 2002Meeting Summary on the Results of Control Room In-Leakage Testing
ML0210705248 April 2002Attachments 2, 3, 4, 5, & 6 for April 8, 2002 Meeting with NEI, Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), Exelon Generation Company (Exelon), & Omaha Public Power DisAging Management
ML02113013022 April 2002Meeting Summary with Nuclear Energy Institute (Nei), Florida Power & Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), Exelon Generation Company (Exelon), and Omaha Public Power District (OPPDAging Management
ML02120019430 April 2002Summary Meeting with VEPCO and Framatome Discussion of the Framatome Fuel Transition Program at North Anna
ML02130025520 May 2002Meeting Summary with Exelon Generation Company, LLC to Discuss Exelon'S Response to Interim Compensatory Measure
ML02136014516 May 2002Training Managers Conference Meeting Summary of 04/25 - 26/02
ML02143056223 May 2002Meeting Summary with Florida Power & Light Co Re 2001 Steam Generator Inspection Activities at St. Lucie, Unit 1
ML02144045324 May 2002Summary of Conference Call with Virginia Electric & Power Co Regarding Steam Generator Tube Inspection at Surry, Unit 2, Attachment 2, Work Scope Spring 2002 Outage
ML02149023324 May 2002Meeting Summary with FPL Regarding St. Lucie, Unit 2 Steam Generator Operational Assessment
ML02168056410 June 2002Summary of Meeting with Duke Energy Corp Re Presentation of Self-Assessment of McGuire Nuclear Station Performance
ML02172039824 May 2002Summary of Conference Call with Florida Power & Light Co (Fp&L) Re FP&L Response to NRC Bulletin 2001-001 for St.Lucie, Units 1 & 2 & Turkey Point Units 3 & 4Boric Acid
ML02199051618 July 2002Telecommunication with Exelon Generation Company, LLC (Exelon) to Discuss Information in Section 2.5 Scoping & Screening Results: Electrical & Instrumentation & Control & 3.6 Aging Management of Electrical & Instrumentation & Controls of PeAging Management
ML0221802205 August 200207/23/2002, Summary of License Renewal Meeting Between NRC Staff, Nuclear Energy Inst. (NEI) & Utilities to Discuss Status of License Renewal ActivitiesAging Management
Backfit
ML02238047826 August 2002Meeting Summary with Omaha Public Power District Recent Successes, Current Initiatives, 2002 Refueling Outage, and Performance GoalsBoric Acid
Fitness for Duty
Coatings
Temporary Modification
Power change
ML02241035729 August 2002Summary of 08/08/2002 Meeting with Dominion VEPCO to Discuss Comments Received from the Advisory Committee on Reactor Safeguards (ACRS) on the Draft Safety Evaluation Report (SER) with Open ItemsHydrostatic
Aging Management
Dissimilar Metal Weld
ML02253034710 September 2002Summary of August 20 and 22, 2002, Telecommunication with Dominion Virginia Electric and Power Company
ML02270012326 September 2002and 09/19/2002 Summary of Telecommunications with Dominion Virginia Electric and Power Company
ML0227404655 February 2002ARB Meeting Summary
ML02291022822 October 2002Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues
ML02294053321 October 2002Summary of Telecommunication with Dominion Virginia Electric and Power Company Re Discuss Results of Framatome Evaluation on Neutron Fluence Values & Consistency with Methodologies Used
ML02294054521 October 2002Summary of October 2, 2002, Conference Call Regarding Virginia Electric and Power Company'S Proposal to Replace the Reactor Vessel Head
ML02295001922 October 2002Summary of Conference Call with Florida Power & Light Co Re Risk Informed Relief RequestLarge early release frequency
ML02295034422 October 2002Summary of Conference Call with Virginia Electric & Power Co on Replacement of Reactor Vessel Head at North Anna, Unit 2
ML02318073914 November 2002Summary of Meeting with VEPCO and Framatome, Proposal to Replace the Reactor Vessel Head at North Anna Power Station, Unit 2
ML02324031322 November 2002Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan.Fire Barrier
Hemyc
ML02329051622 November 2002Summary of 10/31/2002 Meeting with Rg&E (Ginna), Duke Energy (Catawaba, Mcguire), Entergy (Indian Point), Progress Energy (Harris), Proposed Plan to Perform Fire Testing of Hemyc (1-Hour) & MT (3-Hour) Fire Protection WrapHemyc
ML03013000213 January 2003Summary of 12/11/02, Meeting with Florida Power & Light to Discuss Spent Fuel Pool Related Submittals for Turkey Point, Units 3 & 4 and St. Lucie, Units 1 & 2
ML03016088016 January 200307/18 & 09/05, 2002, Summary of Telecommunications with Omaha Public Power District (OPPD) to Discuss Draft Requests for Additional Information (Rais) for Renewal of License for Fort Calhoun Station Unit 1 (FCS)Safe Shutdown
Coatings
Aging Management
Fire Protection Program
ML0306602194 March 2003Public Meeting Summary - Category 1 Meeting Plant Radiation Program Status Meeting - St. Lucie Nuclear Plant, Docket Nos. 50-335 & 50-389
ML03076081612 March 2003Summary of Meeting with Fort Calhoun Station (FCS) Re Current Plant Status, 2002 Plant Performance, Long Term Planning by Both Omaha Public Power District & Fort Calhoun Station, Strategic Initiatives, & Other Current IssuesAging Management
Frazil ice
ML03079015920 March 2003Meeting Summary with Duke Power and Florida Power & Light Co. on Spent Fuel Pool Boraflex for McGuire and Turkey Point
ML03084032421 March 2003Meeting Summary with FPL to Discuss Upcoming St.Lucie Unit 2 Outage Activities
ML03090010131 March 2003Summary of Meeting with Duke Energy Corp Regarding Spent Fuel Pool Boraflex Update for McGuire Nuclear Station, Units 1 & 2
ML0309406984 April 2003Meeting Summary- Discussion of Control Room Habitability Testing at North Anna Power Station, Units 1 and 2
ML0309805602 April 2003Meeting Summary for Fort Calhoun EOC Performance Assessment. Attendance List & Slides Presented, Enclosed