Summary of 12/11/02, Meeting with Florida Power & Light to Discuss Spent Fuel Pool Related Submittals for Turkey Point, Units 3 & 4 and St. Lucie, Units 1 & 2
ML030130002
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 01/13/2003
From: Ellen Brown
NRC/NRR/DLPM/LPD2
To:
Florida Power & Light Co
Brown E, NRR/DLPM, 415-2315
References
TAC MB6721, TAC MB6722, TAC MB6723, TAC MB6724
Download: ML030130002 (8)


Text

January 13, 2003 LICENSEE: Florida Power & Light FACILITIES: Turkey Point Units 3 and 4 and Saint Lucie Units 1 and 2

SUBJECT:

SUMMARY

OF DECEMBER 11, 2002, MEETING WITH FLORIDA POWER &

LIGHT TO DISCUSS SPENT FUEL POOL RELATED SUBMITTALS (TAC NOS. MB6721, MB6722, MB6723, MB6724)

On December 11, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives of Florida Power & Light (FPL) at the NRC Headquarters in Rockville, Maryland.

This meeting was held to discuss recently submitted license applications for Turkey Point Units 3 and 4 and Saint Lucie Units 1 and 2 concerning increased spent fuel pool (SFP) storage within the existing SFP cask areas, and the crediting of soluble boron along with fuel position to maintain reactivity within regulatory limits. The meeting was classified as a Category 2 meeting, which provided an opportunity for members of the public to communicate with the NRC staff after the business portion, but before the meeting was adjourned. Enclosure 1 is a list of attendees and Enclosure 2 is a copy of FPLs handout distributed during the meeting.

The licensee gave a presentation summarizing the current and future efforts for modifications to the SFP as well as the technical and licensing bases. The presentation covered the scope of modifications intended to be made to the SFPs at both facilities and how each submittal affected upcoming outages or influenced other licensing submittals. Additionally, the licensee discussed unique SFP design features. The licensee provided information regarding the timing of pending licensing submittals and their requested need dates for licensing submittals currently under review by the NRC staff. This presentation is included in the aforementioned licensee handout attached to this summary.

The NRC staff provided some editorial comments and asked several clarification questions regarding the Saint Lucie cask pit spent fuel storage rack submittal. The NRC staff indicated its intention to transmit more specific questions at a later date.

At the conclusion of the business meeting, comments were solicited from members of the public, but there were none. The staff noted that the above meeting was beneficial in gaining an understanding of FPLs plans and activities regarding SFP modifications for both facilities.

/RA/

Eva A. Brown, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 50-335 and 50-389

Enclosures:

As stated cc w/encls: See next page

ML030130002 OFFICE PDII-2\PM PDII-2\LA PDII-2\SC NAME EBrown BClayton AHowe DATE 01/03/03 01/03/03 01/10/03 Distribution:

PUBLIC PDII-2 R/F JZwolinski/LMarsh HBerkow AHowe EBrown BClayton (hard copy)

OGC ACRS DJackson VKlein RGiardina RTaylor JOrtego-Luciano EForrest MKowal LWert, RII SRosenberg (e-mail)

MKotzalas

ATTENDANCE LIST NUCLEAR REGULATORY COMMISSION STAFF MEETING WITH FLORIDA POWER AND LIGHT AT NRC HEADQUARTERS DECEMBER 11, 2002 NRC FPL Allen Howe Carl Bible Eva Brown Ken Frehafer Diane Jackson Glen Adams Veronica Klein Yuan Kao Robert Giardina Carl OFarrill Mark Kowal Peter Sharp Ed Forrest Jonathan Ortego-Luciano Robert Taylor Others Norman Simms Stetam Anion Scott Pellet ENCLOSURE 1

Florida Power and Light Company ST. LUCIE PLANT TURKEY POINT PLANT cc:

Mr. J. A. Stall Mr. Donald E. Jernigan Senior Vice President, Nuclear and Site Vice President Chief Nuclear Officer St. Lucie Nuclear Plant Florida Power and Light Company 6351 South Ocean Drive P.O. Box 14000 Jensen Beach, Florida 34957 Juno Beach, Florida 33408-0420 Attorney General Senior Resident Inspector Department of Legal Affairs St. Lucie Plant The Capitol U.S. Nuclear Regulatory Commission Tallahassee, Florida 32304 P.O. Box 6090 Jensen Beach, Florida 34957 Senior Resident Inspector Turkey Point Nuclear Plant Craig Fugate, Director U.S. Nuclear Regulatory Commission Division of Emergency Preparedness 9762 SW. 344th Street Department of Community Affairs Florida City, Florida 33035 2740 Centerview Drive Tallahassee, Florida 32399-2100 T. O. Jones, Plant General Manager Turkey Point Nuclear Plant M. S. Ross, Attorney Florida Power and Light Company Florida Power & Light Company 9760 SW. 344th Street P.O. Box 14000 Florida City, FL 33035 Juno Beach, FL 33408-0420 County Manager John P. McElwain, Site Vice President Miami-Dade County Turkey Point Nuclear Plant 111 NW 1 Street, 29th Floor Florida Power and Light Company Miami, Florida 33128 9760 SW. 344th Street Florida City, FL 33035 Mr. Kelly J. Korth Licensing Manager Douglas Anderson St. Lucie Nuclear Plant County Administrator 6351 South Ocean Drive St. Lucie County Jensen Beach, Florida 34957 2300 Virginia Avenue Ft. Pierce, Florida 34982 Mr. William Jefferson Vice President, Nuclear Operations Support Mr. R. E. Rose P.O. Box 14000 Plant General Manager Juno Beach, FL 33408-0420 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. Rajiv S. Kundalkar Jensen Beach, Florida 34957 Vice President - Nuclear Engineering Florida Power & Light Company Walter Parker P.O. Box 14000 Licensing Manager Juno Beach, FL 33408-0420 Turkey Point Nuclear Plant 9760 SW. 344th Street Mr. J. Kammel Florida City, FL 33035 Radiological Emergency Planning Administrator Mr. William A. Passetti, Chief Department of Public Safety 6000 SE.

Department of Health Tower DriveStuart, Florida 34997 Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741