ML030660219

From kanterella
Jump to navigation Jump to search
Public Meeting Summary - Category 1 Meeting Plant Radiation Program Status Meeting - St. Lucie Nuclear Plant, Docket Nos. 50-335 & 50-389
ML030660219
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/04/2003
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
Shared Package
ML030660215 List:
References
Download: ML030660219 (4)


Text

March 4, 2003 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY ONE MEETING PLANT RADIATION PROGRAM STATUS MEETING - ST. LUCIE NUCLEAR PLANT, DOCKET NOS. 50-335 AND 50-389

Dear Mr. Stall:

This refers to the meeting conducted at your request at the Region II Office in Atlanta, Georgia on February 25, 2003. The purpose of the meeting was to discuss performance in the area of radiological protection during the St. Lucie Unit 1 -18 refueling outage (SL1-18) and the results of your self-assessment in that area following the outage. Enclosed are a list of attendees and the presentation handout.

The discussions focused on the following topics: Radiation Safety Conditions Prior to SL1-18, SL1-18 Radiological Events, Regulatory Response, Organization Effectiveness, Improving Performance With A Three Pronged Attack, Personnel, Process Improvements, Plant Improvements, Current Situation 2003 Performance, and Going Forward. The meeting was informative and did not result in any specific action items or decisions.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4560.

Sincerely,

/RA/

Joel T. Munday, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16

Enclosures:

(See page 2)

FPC 2

Enclosures:

1. List of Attendees
2. Handout - St. Lucie Plant Radiation Safety Excellence Program cc w/encls:

D. E. Jernigan J. Kammel Site Vice President Radiological Emergency St. Lucie Nuclear Plant Planning Administrator Florida Power & Light Company Department of Public Safety Electronic Mail Distribution Electronic Mail Distribution R. E. Rose Douglas Anderson Plant General Manager County Administrator St. Lucie Nuclear Plant St. Lucie County Electronic Mail Distribution 2300 Virginia Avenue Ft. Pierce, FL 34982 Kelly J. Korth Licensing Manager Distribution w/encl: (See page 3)

St. Lucie Nuclear Plant Electronic Mail Distribution Don Mothena, Manager Nuclear Plant Support Services Florida Power & Light Company Electronic Mail Distribution Mark Dryden Administrative Support & Special Projects Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution

FPC 3 Distribution w/encl:

E. Brown, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE DRP/RII SIGNATURE sn NAME SNinh:vyg DATE 2/27/2003 3/ /2003 3/ /2003 3/ /2003 3/ /2003 3/ /2003 3/ /2003 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030660219.wpd

LIST OF ATTENDEES Nuclear Regulatory Commission L. Reyes, Regional Administrator, Region II (RII)

B. Mallett, Deputy Regional Administrator, RII C. Casto, Director, Division of Reactor Safety (DRS), RII V. McCree, Deputy Director, Division of Reactor Projects (DRP), RII J. Munday, Chief, Reactor Projects Branch 3, DRP, RII A. Boland, Chief, Plant Support Branch, DRS, RII

  • T. Ross, Senior Resident Inspector, St. Lucie, DRP, RII G. Kuzo, Senior Radiation Specialist, DRS, RII Florida Power and Light D. Jernigan, Site Vice President S. Wisla, Radiation Protection Manager
  • Teleconference call Enclosure 1