May 24, 2002 LICENSEE: Florida Power and Light Company FACILITIES: St. Lucie Plant, Unit 2

SUBJECT:

SUMMARY

OF MAY 2, 2002, MEETING REGARDING ST. LUCIE UNIT 2 STEAM GENERATOR OPERATIONAL ASSESSMENT (TAC NO. MB3451)

On May 2, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff met with Florida Power and Light Company (FPL) representatives at NRC Headquarters in Rockville, Maryland. The objective of the meeting was to discuss the operational assessment based on the inspection of the St. Lucie Unit 2 steam generator tubes in the fall 2001 refueling outage. The NRC staff requested the meeting, which was open to the public as stated in the meeting notice dated April 12, 2002. Enclosure 1 is a list of attendees and Enclosure 2 is a copy of FPL viewgraphs presented during the meeting.

The licensees representatives provided a detailed description of the analytical method used to make the assessment. Their conclusion is that the operational assessment provides strong assurance of safe operation through the end of the current cycle.

The NRC staff indicated that the meeting was beneficial in gaining an understanding of the inspection scope and the methodology used in the operational assessment.

/RA/

Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-389

Enclosures:

As stated cc w/encls: See next page

May 24, 2002 LICENSEE: Florida Power and Light Company FACILITIES: St. Lucie Plant, Unit 2

SUBJECT:

SUMMARY

OF MAY 2, 2002, MEETING REGARDING ST. LUCIE UNIT 2 STEAM GENERATOR OPERATIONAL ASSESSMENT (TAC NO. MB3451)

On May 2, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff met with Florida Power and Light Company (FPL) representatives at NRC Headquarters in Rockville, Maryland. The objective of the meeting was to discuss the operational assessment based on the inspection of the St. Lucie Unit 2 steam generator tubes in the fall 2001 refueling outage. The NRC staff requested the meeting, which was open to the public as stated in the meeting notice dated April 12, 2002. Enclosure 1 is a list of attendees and Enclosure 2 is a copy of FPL viewgraphs presented during the meeting.

The licensees representatives provided a detailed description of the analytical method used to make the assessment. Their conclusion is that the operational assessment provides strong assurance of safe operation through the end of the current cycle.

The NRC staff indicated that the meeting was beneficial in gaining an understanding of the inspection scope and the methodology used in the operational assessment.

/RA/

Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-389

Enclosures:

As stated cc w/encls: See next page Distribution:

PUBLIC JZwolinski LLund (e-mail)

PDII-2 R/F HBerkow EMurphy (e-mail)

BMoroney TKoshy KKarwoski (e-mail)

OGC BClayton(hard Copy) EBrown (e-mail)

ACRS SRosenberg(e-mail) RMusser, RII ADAMS Accession NO.ML021490233 OFFICE PDII-2\PM PDII-2\LA EMCB/SC PDII-2\SC NAME BMoroney EDunnington for LLund TKoshy BClayton DATE 05/03/02 05/03/02 05/03/02 05/06/02 OFFICIAL RECORD COPY

ATTENDANCE LIST NUCLEAR REGULATORY COMMISSION STAFF MEETING WITH FLORIDA POWER AND LIGHT COMPANY AT NRC HEADQUARTERS MAY 2, 2002 NRC FPL L. Lund R. Kundalkar E. Murphy G. Boyers K. Karwoski R. Gill B. Moroney G. Madden T. Koshy E. Brown FPLs Consultants B. Woodman R. Cipolla R. Maura S. Brown R. Keating Tetra P. Jackson ENCLOSURE 1

Florida Power and Light Company ST. LUCIE PLANT cc:

Mr. J. A. Stall Mr. Donald E. Jernigan, Site Vice President Senior Vice President, Nuclear and St. Lucie Nuclear Plant Chief Nuclear Officer 6501 South Ocean Drive Florida Power and Light Company Jensen Beach, Florida 34957 P.O. Box 14000 Juno Beach, Florida 33408-0420 Plant General Manager St. Lucie Nuclear Plant Senior Resident Inspector 6501 South Ocean Drive St. Lucie Plant Jensen Beach, Florida 34957 U.S. Nuclear Regulatory Commission P.O. Box 6090 Mr. T. L. Patterson Jensen Beach, Florida 34957 Licensing Manager St. Lucie Nuclear Plant Craig Fugate, Director 6501 South Ocean Drive Division of Emergency Preparedness Jensen Beach, Florida 34957 Department of Community Affairs 2740 Centerview Drive Mr. Don Mothena Tallahassee, Florida 32399-2100 Manager, Nuclear Plant Support Services Florida Power & Light Company M. S. Ross, Attorney P.O. Box 14000 Florida Power & Light Company Juno Beach, FL 33408-0420 P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Mr. Douglas Anderson Florida Power & Light Company County Administrator P.O. Box 14000 St. Lucie County Juno Beach, FL 33408-0420 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. J. Kammel Radiological Emergency Mr. William A. Passetti, Chief Planning Administrator Department of Health Department of Public Safety Bureau of Radiation Control 6000 SE. Tower Drive 2020 Capital Circle, SE, Bin #C21 Stuart, Florida 34997 Tallahassee, Florida 32399-1741