IR 05000280/2005002 | 19 April 2005 | IR 05000280-05-002, 05000281-05-002, and 07200002-05-001, on 01/01/2005 - 03/31/2005, Surry Power Station Units 1 & 2 and Independent Spent Fuel Storage Installation, Event Followup, Routine Integrated Report, and Annual Assessment Meeting | High winds Temporary Modification Significance Determination Process Job Performance Measure Earthquake Maintenance Rule Program Fire Protection Program Power change |
IR 05000335/2010007 | 17 November 2010 | Summary of Public Regulatory Performance Meeting with Florida Power and Light Company to Discuss Corrective Actions Associated with the Yellow Finding That Was Documented in the NRC Inspection Report IR 05000335-10-007 | Significance Determination Process Operability Determination |
IR 05000369/2007008 | 4 October 2007 | Notice of Regulatory Conference with Duke Energy Corporation to Discuss the Risk Significance of the Inspection Finding Documented in Inspection Report 05000369, 370/2007008 | |
L-04-004, 11/24/2008 - Summary of Meeting to Discuss 11/21/2008 and 11/18/2008 Requests for Additional Information GL 2004-04, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 3 December 2008 | 11/24/2008 - Summary of Meeting to Discuss 11/21/2008 and 11/18/2008 Requests for Additional Information GL 2004-04, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | |
ML003718225 | 25 May 2000 | Summary of May 10, 2000, Phone Call Between the U.S. NRC Staff, Contractor and NEI Representatives to Discuss Industry Comments Submitted by NEI on April 24, 2000, on the Draft Generic Aging Lessond Learned (GALL) Report - Electrical Equipm | Aging Management |
ML003718643 | 24 May 2000 | Summary of Meeting with the Nuclear Energy Instiute (NEI) to Discuss the Relationship Between the Generic Aging Lessons Learned (GALL) Report and the Standard Review Plan for License Renewal (SRP-LR) | |
ML003729453 | 3 July 2000 | Summary of Meeting with the Nuclear Energy Institute (NEI) to Discuss Industry Comments on the Draft Generic Aging Lessons Learned (GALL) Report - Mechanical Systems Chapter IV, Sections A1, B1, and C1 | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Aging Management Dissimilar Metal Weld |
ML003740678 | 11 August 2000 | Summary of Meeting with the Nuclear Energy Institute on Industry'S Comments on Chapter 2, Structures and Components Subject to Aging Management Review of the Draft Standard Review Plan for the Review of License Renewal Applications for Nucl | Aging Management |
ML010190047 | 16 January 2001 | 11/29/00 Summary of License Renewal Meeting Between the NRC and the NEI License Renewal Working Group; ANO-1 SNC for Hatch Nuclear Plant, Units 1 and 2 and for FPL for Turkey Point Units 3 and 4 | |
ML012490017 | 5 September 2001 | Summary of 07/25/2001 Meeting with the Nuclear Energy Institute (NEI) License Renewal Task Force on Demonstration Project Using Improved Renewal Guidance Documents | |
ML013600458 | 9 January 2002 | Summary - Meeting with Duke Energy on December 11, 2001, Spent Fuel Pool Boraflex Update, MB3570 and MB3571 | |
ML020250340 | 17 January 2002 | Meeting Summary of January 15, 2002 Re Spent Fuel Storage | |
ML020430404 | 28 February 2002 | ,Meeting with Duke Energy Corp on Spent Fuel Pool Boraflex Update Held, (Tac Nos. MB3570 and MB3571) | |
ML020510559 | 14 February 2002 | 02/08/02 Meeting Summary Regarding Control Element Drive Mechanism Cracking Issues | Weld Overlay |
ML020810756 | 19 March 2002 | Operator Licensing Workshop Meeting Summary | Probabilistic Risk Assessment Significance Determination Process Job Performance Measure |
ML020840724 | 1 April 2002 | Meeting Summary on the Results of Control Room In-Leakage Testing | |
ML021070524 | 8 April 2002 | Attachments 2, 3, 4, 5, & 6 for April 8, 2002 Meeting with NEI, Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), Exelon Generation Company (Exelon), & Omaha Public Power Dis | Aging Management |
ML021130130 | 22 April 2002 | Meeting Summary with Nuclear Energy Institute (Nei), Florida Power & Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), Exelon Generation Company (Exelon), and Omaha Public Power District (OPPD | Aging Management |
ML021200194 | 30 April 2002 | Summary Meeting with VEPCO and Framatome Discussion of the Framatome Fuel Transition Program at North Anna | |
ML021300255 | 20 May 2002 | Meeting Summary with Exelon Generation Company, LLC to Discuss Exelon'S Response to Interim Compensatory Measure | |
ML021360145 | 16 May 2002 | Training Managers Conference Meeting Summary of 04/25 - 26/02 | |
ML021430562 | 23 May 2002 | Meeting Summary with Florida Power & Light Co Re 2001 Steam Generator Inspection Activities at St. Lucie, Unit 1 | |
ML021440453 | 24 May 2002 | Summary of Conference Call with Virginia Electric & Power Co Regarding Steam Generator Tube Inspection at Surry, Unit 2, Attachment 2, Work Scope Spring 2002 Outage | |
ML021490233 | 24 May 2002 | Meeting Summary with FPL Regarding St. Lucie, Unit 2 Steam Generator Operational Assessment | |
ML021680564 | 10 June 2002 | Summary of Meeting with Duke Energy Corp Re Presentation of Self-Assessment of McGuire Nuclear Station Performance | |
ML021720398 | 24 May 2002 | Summary of Conference Call with Florida Power & Light Co (Fp&L) Re FP&L Response to NRC Bulletin 2001-001 for St.Lucie, Units 1 & 2 & Turkey Point Units 3 & 4 | Boric Acid |
ML021990516 | 18 July 2002 | Telecommunication with Exelon Generation Company, LLC (Exelon) to Discuss Information in Section 2.5 Scoping & Screening Results: Electrical & Instrumentation & Control & 3.6 Aging Management of Electrical & Instrumentation & Controls of Pe | Aging Management |
ML022180220 | 5 August 2002 | 07/23/2002, Summary of License Renewal Meeting Between NRC Staff, Nuclear Energy Inst. (NEI) & Utilities to Discuss Status of License Renewal Activities | Aging Management Backfit |
ML022380478 | 26 August 2002 | Meeting Summary with Omaha Public Power District Recent Successes, Current Initiatives, 2002 Refueling Outage, and Performance Goals | Boric Acid Fitness for Duty Coatings Temporary Modification Power change |
ML022410357 | 29 August 2002 | Summary of 08/08/2002 Meeting with Dominion VEPCO to Discuss Comments Received from the Advisory Committee on Reactor Safeguards (ACRS) on the Draft Safety Evaluation Report (SER) with Open Items | Hydrostatic Aging Management Dissimilar Metal Weld |
ML022530347 | 10 September 2002 | Summary of August 20 and 22, 2002, Telecommunication with Dominion Virginia Electric and Power Company | |
ML022700123 | 26 September 2002 | and 09/19/2002 Summary of Telecommunications with Dominion Virginia Electric and Power Company | |
ML022740465 | 5 February 2002 | ARB Meeting Summary | |
ML022910228 | 22 October 2002 | Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues | |
ML022940533 | 21 October 2002 | Summary of Telecommunication with Dominion Virginia Electric and Power Company Re Discuss Results of Framatome Evaluation on Neutron Fluence Values & Consistency with Methodologies Used | |
ML022940545 | 21 October 2002 | Summary of October 2, 2002, Conference Call Regarding Virginia Electric and Power Company'S Proposal to Replace the Reactor Vessel Head | |
ML022950019 | 22 October 2002 | Summary of Conference Call with Florida Power & Light Co Re Risk Informed Relief Request | Large early release frequency |
ML022950344 | 22 October 2002 | Summary of Conference Call with Virginia Electric & Power Co on Replacement of Reactor Vessel Head at North Anna, Unit 2 | |
ML023180739 | 14 November 2002 | Summary of Meeting with VEPCO and Framatome, Proposal to Replace the Reactor Vessel Head at North Anna Power Station, Unit 2 | |
ML023240313 | 22 November 2002 | Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan. | Fire Barrier Hemyc |
ML023290516 | 22 November 2002 | Summary of 10/31/2002 Meeting with Rg&E (Ginna), Duke Energy (Catawaba, Mcguire), Entergy (Indian Point), Progress Energy (Harris), Proposed Plan to Perform Fire Testing of Hemyc (1-Hour) & MT (3-Hour) Fire Protection Wrap | Hemyc |
ML030130002 | 13 January 2003 | Summary of 12/11/02, Meeting with Florida Power & Light to Discuss Spent Fuel Pool Related Submittals for Turkey Point, Units 3 & 4 and St. Lucie, Units 1 & 2 | |
ML030160880 | 16 January 2003 | 07/18 & 09/05, 2002, Summary of Telecommunications with Omaha Public Power District (OPPD) to Discuss Draft Requests for Additional Information (Rais) for Renewal of License for Fort Calhoun Station Unit 1 (FCS) | Safe Shutdown Coatings Aging Management Fire Protection Program |
ML030660219 | 4 March 2003 | Public Meeting Summary - Category 1 Meeting Plant Radiation Program Status Meeting - St. Lucie Nuclear Plant, Docket Nos. 50-335 & 50-389 | |
ML030760816 | 12 March 2003 | Summary of Meeting with Fort Calhoun Station (FCS) Re Current Plant Status, 2002 Plant Performance, Long Term Planning by Both Omaha Public Power District & Fort Calhoun Station, Strategic Initiatives, & Other Current Issues | Aging Management Frazil ice |
ML030790159 | 20 March 2003 | Meeting Summary with Duke Power and Florida Power & Light Co. on Spent Fuel Pool Boraflex for McGuire and Turkey Point | |
ML030840324 | 21 March 2003 | Meeting Summary with FPL to Discuss Upcoming St.Lucie Unit 2 Outage Activities | |
ML030900101 | 31 March 2003 | Summary of Meeting with Duke Energy Corp Regarding Spent Fuel Pool Boraflex Update for McGuire Nuclear Station, Units 1 & 2 | |
ML030940698 | 4 April 2003 | Meeting Summary- Discussion of Control Room Habitability Testing at North Anna Power Station, Units 1 and 2 | |
ML030980560 | 2 April 2003 | Meeting Summary for Fort Calhoun EOC Performance Assessment. Attendance List & Slides Presented, Enclosed |