ML18030A115

From kanterella
Revision as of 01:54, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Final Rept of Deficiency on Limitorque Motor Operated Valve Stem Nut Staking
ML18030A115
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/16/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18030A116 List:
References
PLA-497, NUDOCS 8006200171
Download: ML18030A115 (3)


Text

f REGULATORY INFORMATION DISTRIBUTION SYSTEM (R IDS)ACCESSION NBR:8006200171 DOC~DATE: 80/06/16 NOTARIZED; NO FACIL: M.sauehanna Steam Electric Station~Unit 1g Pennsylva 50 388 sauehanna Steam Electric Stationg Unit 2z Pennsylva AUTHOR AFFILIATION C RTIS>N.6.Pennsylvania Power 5 Light Co~REC IP.NAWE RFCIPIENT AFFILIATION GRIERg 8~H~Region ii Philadelphia~

Office of the Director

SUBJECT:

Forwards final rept of deficiency on limotorque motor operated valve stem nut staking, DISTRIBUTIO~

CODE: 801eS COPIES RECEIVED:LTR JENCL 9 SIZE: TITLE: Construction Deficiency Report (10CFR50.55E)

DOCKET 05000387 05000388 RECIPIENT IO CODE/NAME AD I.IC 8'uSt&Q-21 LA RA<A'gg004420 NOTES: S~ED~v.E~~N COPIES LTTR ENCL ACTION: 1 1 1 1 RECIPIENT IO CODE/NAME BC qOunlG&C Nb15 PMs'r HRK, P.10 COPIES I.TTR ENCL 1 INTERNAL: AD/RC I/IE EDO 8 STAFF 07 F IELD COOR/IE13 HYD/GEO BR 22 HPA 08 OELD'3 QA BR 10 STANDRDS DEV 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 AEOO EQUIP QUAL BR 16 HANAUERgS~IEE 05-NRC PDR 02 0 BR 17+REG F ILE 01 1~1 1 1 1 2 2 1 1 1 1 1 1 EXTERNAL: ACRS NSIC 16 1 1 LPDR 03 1 1 July 23 1SBO TOTAL NUBBER OF COPIES REQUIRED: LTTR 38 ENCL 38 TWO NORTH NINTH STREET, ALLENTOWN, PA.18101 PHONE: (21S)821.5181 NORMAN W.CURTIS Vice President.

Engineering 8 Construction 82'I-5381 June 16, 1980 Mr.Boyce H.Grier Director, Region I U.S.Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION FINAL REPORT OF A DEFICIENCY ON LIMITORQUE MOTOR OPERATED VALVE STEM NUT STAKING-,MCAR G-1 ERs 100450/100508 FILE 840-4 PLA-497

References:

PLA-475 dated April 25, 1980 PLA-403 dated September 26, 1979 PLA-329 dated March 2, 1978

Dear Mr.Grier:

This supplements the above referenced correspondence and provides a final report regarding stem nut staking on Limitorque motor operated valves.The report has been prepared by Bechtel Power Corporation and concurred with by PP&L, All Limitorque motor operated valves installed in Units 1&2 have been inspected/staked.

Those valves that have not yet been installed are considered indeterminate and are being controlled via Bechtel nonconformance and condition reports.Please advise should you require further information.

N.W.Curtis Vice President-Engineering

&Construction-Nuclear Attachment JRB:mcb$0/7 ii)8{)062 0 PENNSYLVANIA POWER 8, LIGHT COMPANY 00 lpga Mr.Boyce H.Grier June 16, 1980 cc: Mr.Victor Stello (15)Director-Office of Inspection a Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.G.McDonald, Director Office of Management Information a Program Control U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.Robert M.Gallo U.S.Nuclear Regulatory Commission P.O.Box 52 Shickshinny, Pennsylvania 18655