ML071580958

From kanterella
Revision as of 15:27, 23 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

E-MAIL: (NPA-PD) Amendment 16 Reply
ML071580958
Person / Time
Site: Pilgrim
Issue date: 05/08/2007
From: Buckberg P H
NRC/NRR/ADRO/DLR
To: Sanchez E
Entergy Nuclear Operations
References
TAC MD3698
Download: ML071580958 (2)


Text

Page 1 of 1 Perry Buckberg -Amendment 16 reply From: Perry Buckberg To: Edward Sanchez Date: 5/8/2007 9:53:06 AM

Subject:

Amendment 16 reply Ed, Please review and pass on this preliminary response to Amendment 16.It looks like we' need to speak with them about this. Our SE for BWR VIP-74 states that an accetable method for performing the ax/al weld failure probability TLAA for license renewal is to determine the mean RT-NDT for the limiting axial weld at the end of the extended operating period and to verify that it is less than the results specified in Table 3 of the 3/7/2000 BWR VIP-05 SER supplement.

Therefore, even though the limiting mean RT-NDT values for the analyses in the 3/7/2000 BWRVIP-05 SER supplement are for a 40 year operating period, they were determined to generate an accurate and acceptable axial weld failure probability value. Therefore, if the spediic license renewal mean RT-NDT value (projected to 54 EFPY) remains bounded by the limiting mean RT-NDT value from the the BWRVIP-05 SER Supplement, it can be concluded that the axial weld failure probability will remain less than the maximum acceptable axial weld failure frequency of 5 E-6 per reactor-operating-year (from the BWR VIP-05 supplement) for the extended period of operation.

Thanks, Perry file://C:\temp\GW}00002.HTM 5/31/2007 c.\tem p\GW}00002.TMP Page II_902.TMP Page 11 Mail Envelope Properties (464080C2.B71

9 : 8248)

Subject:

Creation Date From: Created By: Amendment 16 reply 5/8/2007 9:53:06 AM Perry Buckberg PHBI (1nrc.gov Recipients entergy.com esanchl (Edward Sanchez)Action Transferred Delivered Date & Time 5/8/2007 9:53:36 AM Post Office Route entergy.com Files MESSAGE TEXT.htm Options Auto Delete: Expiration Date: Notify Recipients:

Priority: ReplyRequested:

Return Notification:

Concealed

Subject:

Security: To Be Delivered:

Status Tracking: Size 1742 1518 Date & Time 5/8/2007 9:53:06 AM No None Yes Standard No None No Standard Immediate Delivered